QUOTE(hirano @ Oct 21 2020, 09:42 PM)
share drills later.Renovation cost for new wet kitchen extension, Renovation cost for new wet kitchen exte
Renovation cost for new wet kitchen extension, Renovation cost for new wet kitchen exte
|
|
Oct 21 2020, 09:43 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
840 posts Joined: Feb 2013 |
|
|
|
|
|
|
Oct 21 2020, 09:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,336 posts Joined: Nov 2007 From: Pluto |
|
|
|
Oct 21 2020, 10:51 PM
Show posts by this member only | IPv6 | Post
#23
|
![]() ![]()
Junior Member
220 posts Joined: Sep 2007 From: KL Cheras Pudu Ulu |
I am going for extension too
Price I found for genting roof 120-150psf Slab 150-160psf For drawing u can go to your local council ask for their recommendations you will be surprised on the charges difference I got quote 12k from some so call local design and Reno company, but mpkj recommendation 3k only include everything If you take their existing plan below 2k can settle This post has been edited by ryukeong: Oct 21 2020, 10:53 PM |
|
|
Oct 21 2020, 11:09 PM
Show posts by this member only | IPv6 | Post
#24
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,886 posts Joined: Jan 2007 From: The Long river ... |
Since its only 1 floor, piling is not require but footing will be good.
Find someone that is reputable in the industry, you dont want few year down the road your concrete roof start leaking you gonna have a field day. |
|
|
Oct 22 2020, 12:23 AM
Show posts by this member only | IPv6 | Post
#25
|
![]() ![]() ![]() ![]() ![]()
Senior Member
919 posts Joined: May 2005 |
QUOTE(ryukeong @ Oct 21 2020, 10:51 PM) I am going for extension too You means the price for the slab alone is 150-160psf. Is this additional cost on top of the whole renovation cost. Price I found for genting roof 120-150psf Slab 150-160psf For drawing u can go to your local council ask for their recommendations you will be surprised on the charges difference I got quote 12k from some so call local design and Reno company, but mpkj recommendation 3k only include everything If you take their existing plan below 2k can settle the 3K mpkj recommendation plan is to use the standard plan only right? |
|
|
Oct 22 2020, 12:32 AM
Show posts by this member only | IPv6 | Post
#26
|
![]() ![]() ![]() ![]() ![]()
Senior Member
919 posts Joined: May 2005 |
QUOTE(ShadowR1 @ Oct 21 2020, 11:09 PM) Since its only 1 floor, piling is not require but footing will be good. Can top up little bit to request the contractor use ready mixed concrete and make sure the worker using concrete vibrator during slab concrete casting.Find someone that is reputable in the industry, you dont want few year down the road your concrete roof start leaking you gonna have a field day. This post has been edited by utellme: Oct 22 2020, 12:32 AM |
|
|
|
|
|
Oct 22 2020, 12:49 AM
Show posts by this member only | IPv6 | Post
#27
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
10,722 posts Joined: Nov 2011 |
About 180 psf.
|
|
|
Oct 22 2020, 12:59 PM
Show posts by this member only | IPv6 | Post
#28
|
![]() ![]()
Junior Member
220 posts Joined: Sep 2007 From: KL Cheras Pudu Ulu |
QUOTE(utellme @ Oct 22 2020, 12:23 AM) You means the price for the slab alone is 150-160psf. Is this additional cost on top of the whole renovation cost. 150-160 extension using slab included the 3K mpkj recommendation plan is to use the standard plan only right? 3k is for new drawing, mine is 2.8k refer pictures I got from architect recommended by mpkj, If take existing plan is below 2k. U go there one time can get lots of information. This is for single storey price at mpkj. Others I not sure ![]() This post has been edited by ryukeong: Oct 22 2020, 01:02 PM |
|
|
Oct 22 2020, 01:30 PM
Show posts by this member only | IPv6 | Post
#29
|
![]() ![]()
Junior Member
157 posts Joined: Jan 2013 |
QUOTE(utellme @ Oct 21 2020, 06:18 PM) Hi All, Rm53,665I planing to build a new wet kitchen in my corner unit property. just wonder how much the renovation extension cost. 1. New Kitchen size 24 X10 2. Concrete roof top 3. floor and wall tiling (local tile) 4. 3 X 7 exit solid wooden door 5. 2 X Windows - 5.5' X6' and 6'X4' 6. 5 X power point 7. 2 X Fan point 8. Water basin point 9. Kitchen Cabinet not required TIA |
|
|
Oct 22 2020, 01:41 PM
|
![]() ![]()
Junior Member
110 posts Joined: Nov 2007 |
Parking here for reference. Planning to do renovation of my DST.
Called some guy for plan submission to MBPJ he quoted 4K. Looking for anyone who can do it lesser. |
|
|
Oct 22 2020, 01:45 PM
Show posts by this member only | IPv6 | Post
#31
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,886 posts Joined: Jan 2007 From: The Long river ... |
QUOTE(gordonchin @ Oct 22 2020, 01:41 PM) Parking here for reference. Planning to do renovation of my DST. Get the standard drawing and submit, doesnt cost 4k.Called some guy for plan submission to MBPJ he quoted 4K. Looking for anyone who can do it lesser. Deposit is rm500 or rm700 if I remember correctly. ***Edit*** There's a quote up there. This post has been edited by ShadowR1: Oct 22 2020, 01:46 PM |
|
|
Oct 22 2020, 02:14 PM
Show posts by this member only | IPv6 | Post
#32
|
![]() ![]() ![]() ![]() ![]()
Senior Member
919 posts Joined: May 2005 |
|
|
|
Oct 22 2020, 02:20 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,863 posts Joined: Aug 2014 From: Soviet Sarawak - Dum Spiro Spero |
park
|
|
|
|
|
|
Oct 22 2020, 04:28 PM
|
![]() ![]()
Junior Member
184 posts Joined: Sep 2006 |
QUOTE(utellme @ Oct 21 2020, 06:18 PM) Hi All, completed mine 2nd half last year.I planing to build a new wet kitchen in my corner unit property. just wonder how much the renovation extension cost. 1. New Kitchen size 24 X10 2. Concrete roof top 3. floor and wall tiling (local tile) 4. 3 X 7 exit solid wooden door 5. 2 X Windows - 5.5' X6' and 6'X4' 6. 5 X power point 7. 2 X Fan point 8. Water basin point 9. Kitchen Cabinet not required TIA Location Klang, double storey corner house . 50k for single storey kitchen extension including the following:- New kitchen 20x15 concrete roof top with overhang 5x15 to the side of corner, 20x1 overhang to back. floor and wall tiling (local) reused existing solid wood door open to side / corner with 5ft overhang. 1x windows 8x6, 2x6 (size agak agak). 6x indoor power point, each double plug + 1x outdoor weatherproof single plug, conceal wiring. 2x fan point, 1x exhaust fan, 4+3 (indoor/outdoor) light point water basin, washing machine water outlet, route supply from new water reservoir tank. no kitchen cabinet. (reuse all our old 菜橱) others included :- dismantle / clearing 20x10 old kitchen, 5ft wall with zinc roof / metal awning extension Piling / foundation use red brick kitchen counter top 20x2 (high + low for chinese style stove cooking, no lobang for built-in stove )with extra 2x2 L shape use 4x2 quality black thick tile for counter top (dunno local or import), with the rest local tile (inner) same as floor / wall. aluminium frame + glass sliding door for entire L-shape counter top. aluminium frame + sliding glass for windows. not included :- water sink (double) - bought this independently as wife dont like design from main con supplier. ~700 normal iron grill for door, windows. ~1300 stainless steel water tank 1000l on top of new kitchen concrete roof - ~1300 including supply from main (route around the house), various changes to garden hose location etc. electricity supply from main, 3 phase to new DB with ELCB in new kitchen, 3 fans, 5+3 (indoor/outdoor) lighting (normal T8/T5 Led tube), built in timer for back yard light - this one complicated to calculate, as main contractor pay a portion of total electrical guy bill. ~3500 metal sheet awning 20x6 connecting to 1ft overhang roof to the back ~2500 MPK various misc fees kitchen extension was done among other things like repainting whole house (inside outside) and/or many other general repair. prices maybe vastly different this year due to a very strict crack down on legal / illegal indon/foreign workers availability thanks to covid etc. edit: roof use ready mixed concrete with worker using concrete vibrator during slab concrete casting. grade use is higher too according to main con (I dunno what grade). also post casting various water proofing was done, and thankfully lots of rain year end, hence they catch most of the issues before /during they start working indoor side of the build. This post has been edited by plc255: Oct 22 2020, 05:45 PM noien liked this post
|
|
|
Oct 22 2020, 05:17 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
847 posts Joined: Nov 2010 |
50k
|
|
|
Oct 31 2020, 03:32 PM
|
![]()
Probation
0 posts Joined: Jul 2020 |
For more information just try to read here... Tile Installer
|
| Change to: | 0.0192sec
0.58
5 queries
GZIP Disabled
Time is now: 24th December 2025 - 06:32 PM |