QUOTE(merci @ Jun 16 2020, 09:49 PM)
Hi Daang and sifus,
My masterbedroom bathroom is leaking to the lower floor. already did waterproofing using the solution but only last a few months and now starts to leak again. At the bottom of the stairs, there're water dripping from above.
Already asked quotation from a contractor. He suggested to do the whole bathroom.
What I'm not agree with him is the time taken. His proposal schedule:
1. hacking - 4 days for a 8x5.5' bathroom
2. Water proofing - 4 days( 2 days to cure and 2 days testing)
3. Tiling 4 days.
My question:
Is it really 4 days to do the water proofing?
I need shorter days coz I cannot take longer leave days.
Thanks
24 hours or less for ponding test is good enough The ponding test required 24 hours practice is good enough to determine good waterproofing or not.
The idea is like this, nobody showering more than 24 hours with the water ponding the whole floor. Each time ppl shower, the water discharge to the downpipe and dry within an hour.
2 days is possible with 2 coats waterproofing + 24 hours ponding testDue to less ventilation in toilet, the 1st coating waterproofing may take longer to dry compare 1st coating at outside exposed to the hot sun.
It depends the your shower ventilation condition. To speed up the process get a standing fan blow it.
If your contractor able to time this work well, he can apply 1st coating on late evening (same day he completed concrete hacking), let the overnight 1st coating cure and proceed with 2nd coating the next day. In the end it just took 1 day only.
4 days (waterproofing + ponding test ) is possible subject to factors.
2 days (waterproofing + ponding test) with 2 coatings and 24 hours ponding test is possible too but with good planning.
Curious can you share what waterproofing solution did you use previously and the leaking return again after few months? You mention dripping, is it a continuous dripping even without using the shower?QUOTE(PaintPals @ Jun 17 2020, 09:46 AM)
Do take note that it all depends on toilet size as well, a typical toilet re-waterproofing work that involves hacking would take up at least a week, the time consuming part are hacking and tiling and can get quite messy. I wouldn't recommend those non-hacking waterproofing as it only delays the problem but not solving the root cause of it.
This is true, depend the toilet size, overall complete process it takes 6-7 days averagely for a typical size toilet.
Non-hacking waterproofing not recommended as it delays the problem and not solving the root cause.This is also true especially the water repellent waterproofing, sealing between the tile joint, and other marketing gimmick waterproofing products.
why?
Most of the chemical will eventual wear out, less effective after months or 1 - 3 years (depend the concrete structure, how frequent usage of shower area). It only serve as temporary solution.
Imagine the rain repellent chemical you apply on car windscreen.
It also subject to the contractor knowledge method how to solve the given problem.
QUOTE(billyboy @ Jun 20 2020, 09:30 AM)
a friend was sharing a water leak problem
- 5 storey walk up apartment
- bought the 4th floor unit
apartment has several 'stalactite' mineral deposit from the roof. several inches from ceiling coming down.
- found that the problem comes from the toilet upstairs.
- owner upstairs refuse to repair their toilet
my friend did PU injection however water flow now to a wall. the wall looks like coloured. if look carefully, probably got fungus / mold.
any suggestion how to fix the problem without upstairs help ?
tks so much

Only PU injection can fix from below.
Always be ready that PU injection might need 2 or 3 times to fix the leaking. This is important when you discuss the warranty term. Best to have the contractor to warranty the whole area. Example your leaking area is toilet, ask the contractor to give warranty the whole toilet area in the event new leaking appear.
I like to share a more technical knowledge about PU injection chemical. PU injection chemical has two types i) the common contractor use is Epoxy injection chemical (very rigid), ii) Flexible polyurethane PU injection (flexible and able cushion concrete movement)
The chance of a highly skilled people handling of PU injection could solve in one time is in fact high. It takes into account using the right chemical PU and able to analyze the hollow concrete while they see the PU foam (yellowish thing) appear.
This post has been edited by Daang: Jun 22 2020, 06:26 PM