 Questions in regards to Amansiara II @ Jalan Ipoh, Question on Amansiara II @ Jalan Ipoh

views
     
vincentyys
post Aug 12 2008, 11:47 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(sabrina_beh @ Aug 12 2008, 10:48 AM)
Have u survey price of grills. Must be very expensive now steel price is up sweat.gif
*
no place for me to ask so far ..... i think should need at least 4K.
last year, he do for whole house for corner house is around 3.3K, this year.. estimate maybe increase for 30%
since we have one neighbour is contractor, we can ask him also .... rclxms.gif

This post has been edited by vincentyys: Aug 12 2008, 11:53 AM
vincentyys
post Aug 12 2008, 08:06 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(zba @ Aug 12 2008, 01:03 PM)
Plaster Ceiling = RM 4.80 psf (Amansiara owner only)
Downlight = RM 60 per unit (Supply & install), excluding additional wiring if required.

Door & Window grill, Simple design

Mild Steel = RM13 psf
Wrought Iron = RM30 psf
Stainless Steel = RM34 psf

*All price are base on current market price of steel. Since this material price is like a yoyo, i cannot guarantee. You can use it as estimation only, the actual will subject to change


Added on August 12, 2008, 2:17 pmPrice for door & window grills, mild steel standard design (Inter. unit, Level 3);

Main Door - 3'x7'  RM273
Sliding door (2 nos) - 5.7'x7'  RM1040
Window;
Living - 6'x6' RM468
Master /Bedroom 2 (2 nos) - 2'x4' RM208
Bedroom 3 - 4'x4' RM208
Bath 1 & 2 (2 nos) - 3'x2' RM156
Wet kitchen - 4'x4' RM208

TOTAL  RM2561
*
if i use one big grill to cover main door and window for living hall, is it possible at first floor ?

pls see below photo ...

how about the kichen cabinet ???? whats the best price ?
how u going to do your kitchen .....??
is it ok to do like the photo below ?

user posted image


This post has been edited by vincentyys: Aug 12 2008, 08:19 PM
vincentyys
post Aug 13 2008, 10:37 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(zba @ Aug 13 2008, 09:51 AM)
Hi,

For level 1 & level 3, kitchen area is smaller compare to level 2 & 4. Last night i'm study the layout & possibility of kitchen cabinet location. I think we have no choice, we need to sacrifice our wet kitchen (demolish their wall) & extend the sink to the end. Hob/hub we put in the other side but have to make  sure not opposite the sink area, if not the space left in between is about 3 ft only. You can imagine how two person want to use it at same time.

Opposite to my sink, i put my washing machine & dryer in stack. Fridge i put just beside the store door (as sample house)

The grill you want to cover main door & window i'm not sure. We are strata title, to do outside the house i think you need to get consent from developer.
*
demolish the wall also a good idea..... is it very costly ???
vincentyys
post Aug 14 2008, 03:48 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(zba @ Aug 13 2008, 01:14 PM)
Sorry, for your information, i'm still work on it, this weekend i will meet the cabinet supplier and ask a few design to suit your house, by next week i will come back to you. I received your fax yesterday, just complete draw your layout...so sabar aaa.  icon_idea.gif
*
is it also find some design to suit all of amansiarer ???
vincentyys
post Aug 14 2008, 04:45 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
for your info,
i just discuss with bank agent and got the below conclusion.

my loan is flexi plan.... i dont have to start the payment first ... if i have extra cash, i just put into my current account, it will deduct the principle, then just calculate the interest. which means, if i loan 140k, i have 140k in the current account, i do not have to pay interest. And the money can withdraw anytime. If you withdraw 5K, the ur interest is base 5K.

my current loan rate ( flexi plan ) is
BLR - 0.5 for first 10 years.
BLR - 0.7 for following 20 years.
With this rate, my loan amount is RM 140,252
Monthly installment is RM 864.00

The best rate ( flexi plan ) now already like below.
BLR - 2.2 for first 3 years.
BLR - 2.0 for following 27 years.
If i refinance with this rate, including penalty and document all charges. 10K, and loan another 20K.
total loan amount is RM 170,000
Monthly installment is RM 887

If i refinance after house complete, i can have extra 20K for renovation.
with the monthly installment extra RM 23 / month.
What do you think ????

This post has been edited by vincentyys: Aug 14 2008, 04:53 PM
vincentyys
post Aug 14 2008, 05:34 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(bigriverian @ Aug 14 2008, 05:21 PM)
vincentyys,

In my opinion depend on your goal, some people looking long term (mau hutang cepat habis) or other people want extra cash for house renovation. Finally look your own financial capability maa... icon_rolleyes.gif
*
ya lo... my colleage refinace to make it pay less for every month.

for me.... maybe i will choose to loan more, bcoz since it is flexi plan, if i have money, i will pump in to current account to deduct interest, is better than make FD. just standby the cash if urgent. bcoz renovation will have many unestimate cost occur..
vincentyys
post Aug 18 2008, 09:59 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(kelvinchin @ Aug 18 2008, 08:23 PM)
Hi all, Im new member here, from phase I. Nice to meet u all!!  smile.gif

I would like to ask is it really will be a flyover for us?? I just pass by yesterday and i notice that opposite us already have another type of townhouse, and its quite near to the road, just wondering is it enough space to build a flyover to the opposite road.... or the developer will ask us to use the u-turn where located further down as the road already been expand now..??  sweat.gif
*
maybe, bcoz i dont see any flyover construction there .... sad.gif
vincentyys
post Aug 19 2008, 08:23 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(dennishme @ Aug 18 2008, 11:55 PM)
Hi,  I am new here.  Bought 1 Unit Phase 1 No. 132 b.  Very impressed with the response in this Forum. Was wondering how many percent have my apartment is completed.

Am now transferred to Singapore for work.  May need to sell the house when completed.  Wondering if anyone could introduce me an agent.  Mine is a corner unit level 2 biggrin.gif  biggrin.gif  biggrin.gif  biggrin.gif
*
u are beside me...... i'm 131A.
i'm your neightbour.... rclxms.gif

but... maybe cant see u there also .... rclxub.gif

This post has been edited by vincentyys: Aug 19 2008, 11:13 AM
vincentyys
post Aug 27 2008, 02:44 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
the respond suddently slow already ....
vincentyys
post Aug 27 2008, 04:59 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
haha ....... i havent start yet... just pay interest now...
i think i will goto see hows the progress going on by this weekend.
vincentyys
post Dec 2 2008, 02:07 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
user posted image

it looks like will fall down when heavy raining. the tower to close to the side... sweat.gif
vincentyys
post Jan 6 2009, 07:58 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
i got the VP today also...

it have to be make payment within 14 days.

i remember that, we make payment first, but receipt come after 1 week, and they claim 10% interest untill the date of receipt, not date of payment.

is it we have to take the key first, they check for any damage ?
or when we collect the key and have to check the damage on the spot ???

the payment only payable by cash and bankdraft ... stated at VP.

This post has been edited by vincentyys: Jan 6 2009, 08:01 PM
vincentyys
post Jan 7 2009, 10:35 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
my friend told me, CF will come not so fast, we will get the key to inspect our house. Then CF will come very soon ..
vincentyys
post Jan 7 2009, 10:55 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(smile_lyn @ Jan 7 2009, 10:47 AM)
Oh ye! Baru teringat, i tanya Pn Su pengalaman the dev dapat the CF berapa lama, she said dalam 4-5 bulan. fuhhh!!! hmm.gif
*
wahh .... lamanya..... rclxub.gif
vincentyys
post Jan 7 2009, 11:10 AM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
the lot number 131-A become 32-1
vincentyys
post Jan 7 2009, 01:07 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
planning go at friday or sat...
vincentyys
post Jan 7 2009, 01:41 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(smile_lyn @ Jan 7 2009, 01:12 PM)
Tadi baru dapat the register post the original letter, aik, post biasa sampai cepat daripada registered post? hehhe
*
saya pun dapat 2 same letter.... it come together ... rclxub.gif
vincentyys
post Jan 7 2009, 02:27 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(fernfan @ Jan 7 2009, 02:15 PM)
augustinetan & vincent,

when u sign ur snp?


Added on January 7, 2009, 2:16 pmnuwaira - when u sign ur snp?
*
i think at jan...
vincentyys
post Jan 7 2009, 02:28 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
QUOTE(icekelvin @ Jan 7 2009, 02:27 PM)
Hi All,

I have just paid my service charges and the rest. I was given a parking access card, clearance form and a sticker. Btw, all the appointment for this saturday fully booked le, so i have booked for 1pm next monday to view my unit. My unit is 88B and address is 101-2.

Cheers
*
fully book .... pengsan liao... rclxub.gif
vincentyys
post Jan 7 2009, 07:37 PM

Getting Started
**
Junior Member
118 posts

Joined: May 2008
within this one hour, we have to find out whats the problem inside the house and write down ???

1 hour enough ??