QUOTE(yy714 @ Feb 22 2019, 06:15 PM)
Sharing my home renovation journey here which started on June 2018
1) Extend 15 feet wet kitchen & concrete table top with tiles
2) Demolish existing bathroom at downstair and replace tiles
3) Build 1 new bathroom at extension area
4) Install full height wall tiles and floor tiles at extension area and new bathroom
5) Extend 7 feet master bedroom
6) Plaster ceiling at all extension area
7) Painting internal
All of the above done by a main contractor
Below will be done by different contractor
1) Grill door and window
2) Kitchen cabinet and wardrobe
3) Air cond piping and installation
4) Install auto gate
My initial budget was RM80k
Rough breakdown as the renovation not completed yet
Total main contractor workdone as mentioned above - RM65k
Grill door and window - RM3.3k
Kitchen cabinet & wardrobe - RM13k
Air cond installation 2 units 1hp & 2 units 1.5hp - RM760
Will be sharing more after all the renovation completed




80k is cheap. is including all material?1) Extend 15 feet wet kitchen & concrete table top with tiles
2) Demolish existing bathroom at downstair and replace tiles
3) Build 1 new bathroom at extension area
4) Install full height wall tiles and floor tiles at extension area and new bathroom
5) Extend 7 feet master bedroom
6) Plaster ceiling at all extension area
7) Painting internal
All of the above done by a main contractor
Below will be done by different contractor
1) Grill door and window
2) Kitchen cabinet and wardrobe
3) Air cond piping and installation
4) Install auto gate
My initial budget was RM80k
Rough breakdown as the renovation not completed yet
Total main contractor workdone as mentioned above - RM65k
Grill door and window - RM3.3k
Kitchen cabinet & wardrobe - RM13k
Air cond installation 2 units 1hp & 2 units 1.5hp - RM760
Will be sharing more after all the renovation completed