Hi!
I’m currently an owner at Villa Puteri Condo (next to Sunway Putra Mall). Been staying here for close to 20 yrs. Best location and access. Just that it is getting a bit old. Thinking now may be a good time to get a new condo and would like to try new developments. Contemplating between D’Brightton and Duta Park Residences.
My requirements:
1. High floor
2. Good view
3. Open kitchen concept
4. Must have a yard, or a room with good ventilation to convert into a yard
5. 13xx-17xxsqf (Min 3 bedrooms [1 will be converted into a walk-in wardrobe]) - Max 2 occupants unless guests visiting.
6. Large master bedroom
7. 2 carparks [Side by side, not tandem]
D’BRIGHTTON -
Type A: 1,324sqf, dual keys, on 40/F with KL view - RM755,480 after rebates.
I like D’Brightton for:
1. View.
2. Open kitchen concept.
3. Cheaper than DPR.
4. Contains a yard, albeit tiny.
Not too excited about:
1. Traffic jams along Jln Pahang & Jln Tun Razak.
2. Nothing in immediate vicinity.
3. Not sure in the future any tall buildings will be built to block the fantastic view.
4. Titiwangsa - Not very prestigious area..?
5. GSD is a Penang developer. I don’t know if it has a good track record..?
6. Seen the showroom, all bathrooms a bit on a small side but lounge is a nice size for me.
7. Developer still applying for HOC.
DUTA PARK RESIDENCES -
Type B: 1,129sqf, on 36/F with Bkt Tunku view - RM785,000 after rebates.
Type C: 1,538sqf, dual keys, on 36/F with KL view - RM1,066,736 after rebates.
I like Duta Park Residences for:
1. Within my comfort zone. Truly love the location. Have no issue with having to drive everywhere.
2. Nice rooftop pool
3. Reputable developer
Not too excited about:
1. Fungshui apparently not too good with the river running next to it and road higher than the entrance..? But Villa Puteri
also next to the river...
2. No yard.
3. Kitchen isn’t open kitchen concept. But I can build an additional open kitchen if I get type B.
4. Cost more than D’Brightton
5. Access roads not very good.
6. Under commercial title. Only can change electricity to residential.
Anyone can give me feedback or comparisons on these 2 projects please? Both are LH, completion about the same time: 2023-24.
d'Brightton Titiwangsa
Aug 17 2020, 08:45 AM
Quote

0.0250sec
0.72
7 queries
GZIP Disabled