Avenger_2012
post Dec 6 2022, 01:17 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(yuzulicious @ Dec 5 2022, 04:42 PM)
Wow this "new neighbor" must go thru squatter road to get in out everyday then, there's direct road to this parcel of land if they really build this inner land
*
This is actually the temporary hawker center.
Can refer to the latest post on Allevia.
Avenger_2012
post Mar 17 2023, 06:55 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
Along Jln Segambut Dalam - Jalan Kiara 3 we have:
- Miranda Hill
- Bon Kiara
- TWY2
- And not to forget Jalan Segambut Upgrade Master Plan is in progress, more specifically phase 2 which is connecting Jln Segambut directly to Petron North Kiara.
- The rumoured MRT Bukit Segambut

Busy years ahead!

This post has been edited by Avenger_2012: Mar 17 2023, 06:55 PM
Avenger_2012
post Mar 20 2023, 02:41 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(weezerd @ Mar 18 2023, 11:58 AM)
This is the Fasa 4
https://forum.lowyat.net/topic/4973987/+80

Duta Kiara Road, no idea about it. But the connection would be very helpful to traffic users if its connected.
*
Jalan Segambut Upgrade is divided into 4 phases.
Think of Phase 1 as starting from north, which is Jln Segambut whereas Phase 4 is from south , Mont Kiara.
Phase 1 - The main Jln Segambut, along the road we have Era Duta North, Riana Dutamas, SRJKC Khai Chee, etc, it ended at flyover near SPPK Segambut. Completed long time ago, a decade or so.
Phase 2 - Currently road construction in progress. It’s about 800 mtr stretch connecting the end of flyover (in phase 1) to Petron North Kiara. Expected to complete by June 2023.
Phase 3 - Not started yet, This is supposed to be a road from Petron North Kiara connecting to Jalan Kiara 4. I think this will start concurrently with MRT construction, as MRT Bkt Segambut will be along this road. Miranda Hill is along this road as well.
Phase 4 - It’s considered semi-complete. This is actually Jalan Kiara 4, and currently it is terminating at Inspirasi Mont Kiara. Allevia Mont Kiara which is currently under construction will further extend the road a little bit, and DBKL will then takeover and link it to Phase 3.

user posted image

This post has been edited by Avenger_2012: Mar 20 2023, 02:45 AM
Avenger_2012
post Jun 11 2023, 10:34 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(IronManz @ Jun 10 2023, 04:42 PM)
c'est bon, no plans for neighborhood upgrade?
*
It will be done eventually.
I think Jln Kiara 3 had slowly removed the surrounding squaters over the past decade.
With construction of Allevia, Bon & TWY2, the neighbourhood is indeed being upgraded.

But i think the most important upgrade is the Jalan Segambut Upgrade Phase 3, which will connect Jln Kiara 4 to Jln Segambut Dalam. This should alleviate the traffic in Jln Kiara 3 significantly.
Avenger_2012
post Jun 12 2023, 11:06 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(yuzulicious @ Jun 12 2023, 10:54 AM)
Negative, try look into DBKL construction notice board closely Jalan Kiara 4 will take a right turn connecting to Jalan Duta Kiara only
*
That’s because Phase 3 have not started. Phase 3 can only start once Allevia is completed, and DBKL has the budget to buyout the surrounding squatters area and build flyover and connect Jln Kiara 4 and Jln Segambut Dalam.

Phase 3 is part of Jln Segambut upgrade master plan, more reference as below:

user posted image
Avenger_2012
post Jun 13 2023, 11:39 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(Avenger_2012 @ Jun 13 2023, 11:35 PM)
As per PITKL-2040, these road constructions are identified as the missing links and are planned as follows:
Missing links of interest relevant to this area:
1. Connecting Jln Hj Hamzah to Jln Duta Kiara.
2. Connecting Jln Hj Hamzah to Jln Kiara 5,7 and Serene Mont kiara
3. And ultimately - road expansion from 6/38J (Petron North Kiara) to Jln Kiara 4 (Mont Kiara Int School) - i.e. Jln Segambut Upgrade Phase 3.

Sos: Page 38 - 40.
https://www.dbkl.gov.my/wp-content/uploads/...PITKL2040_c.pdf
*
user posted image
user posted image

This post has been edited by Avenger_2012: Jun 14 2023, 10:27 AM
Avenger_2012
post Jun 15 2023, 08:37 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(tanyauchuan @ Jun 15 2023, 06:45 PM)
actually phase 3 is done 90% only the linkage to jalan kiara 4 not do, the rest already done~ now the constructionis doing the phase 2 link phase 1 and phase 3
*
Nope, phase 3 is not considered started at all. Phase 3 includes the expansion of road from Petron North Kiara, all the way to Jalan Kiara 4 - where Allevia is.
Avenger_2012
post Jun 17 2023, 01:41 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(BigMan123 @ Jun 16 2023, 11:32 PM)
Congrats…50% sold upon launch today
*
Real or not? Possibly sticker game.
Avenger_2012
post Jun 19 2023, 03:29 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(genesis87 @ Jun 19 2023, 02:23 PM)
Apparently many of them were from earlier 'pre launch' booking, not from 1 day haha.

But seems to have quite decent interest? When I was there on Day 1, there were 5-6 other groups going at the same time in the morning.
*
Have you heard anything from sales agent regarding the road connectivity? Jln Kiara 3- Jln Segambut Dalam or connection to Jln Duta Kiara?
Just wondering whether they have insider news on when the road upgrade can commence.
Avenger_2012
post Jul 3 2023, 07:04 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(versace3325 @ Jul 2 2023, 10:09 PM)
Just wonder impian villa owners didn’t make noise? This high rise cover them and 0 distance
*
Given a choice, I think it’s better to suffer for a few years and be surrounded by Bon, rather than having squatters around.
Avenger_2012
post Jul 3 2023, 08:02 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(BigMan123 @ Jul 3 2023, 07:44 PM)
Not sure if this can ever be achieved. Pentamont has squatters on both sides and not sure if it’s big enough to build anything. Developers should not leave small plot of land. Slightly larger piece next to inspirasi but big enough to build anything?
*
If developer is capable to convert an “U” shape land plot surrounding an existing landed property to be Bon Kiara, rest assured that it’s only a matter of time before the surrounding squatters are cleared.
Avenger_2012
post Aug 30 2023, 08:50 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(Loreki @ Aug 30 2023, 07:37 PM)
They announced that they are connecting JK3 to Jalan Duta Kiara!
*
Source? Timeline?
Avenger_2012
post Sep 1 2023, 10:41 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(Avenger_2012 @ Jun 13 2023, 11:40 PM)
user posted image
user posted image
*
No. 34 - Finally gonna start.
Avenger_2012
post Sep 3 2023, 02:00 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(A.B.D. @ Sep 3 2023, 08:52 AM)
Someone said previously it will be linked and funded by DBKL, but as you can see DBKL managed to get a developer to do a section of it and will probably get another developer or a few to contribute for the remainder that BON is not doing
Link
*
After Allevia, there is no more land as it’s occupied by Richmond and Aston.
The developers will not contribute to it, unlike Allevia and Inspirasi due to their self-interest to have alternative entrance and commitment to DBKL also.

Most likely DBkL will fund the roads.
Avenger_2012
post Sep 3 2023, 03:01 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(Cavatzu @ Sep 3 2023, 02:42 PM)
They panai. Could sell their products without having to cough up more capital. Bon is left with the heavy bags so they have to open wallet.
*
I think the elevated road at Jln Kiara 4, connected by Inspirasi and Allevia are quite expensive either. DBKL is taking advantage of this, rather than forking out money for the road, let Inspirasi and Allevia do it.

So DBKL just need to build from Allevia until Petron North Kiara.
Avenger_2012
post Oct 8 2023, 09:22 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(tanyauchuan @ Oct 6 2023, 04:49 PM)
then JK4 become end road? JK3 win
*
JK4 will not be end road. JK4 is always planned to connect to Jln Segambut Dalam, this has always been the plan and part of Jalan Segambut Upgrade Master Plan and KL City Plan 2040.

If you notice, from Petron North Kiara - there are new roads being built and terminated due to hill side. The hill side needs to be flatten and new road construct to link all the way to Allevia @ Jln Kiara 4. Not to forget, Allevia side is elevated so the cost will be high.

So when will the government set aside the budget to construct this crucial link? MRT3 is the answer. MRT- Bukit Segambut and MRT - Mont Kiara will be connected by this road link, and the longer the project delays, the longer we have to wait.
Avenger_2012
post Oct 12 2023, 04:11 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(tanyauchuan @ Oct 12 2023, 12:58 PM)
the mrt3 segambut statiom land become hardware shop dy😅 mean in 3years also wont be station right?
*
Mrt corp is building a temporary accommodation for workers for construction.
Avenger_2012
post Jan 9 2024, 08:34 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
user posted image
Avenger_2012
post Jan 2 2025, 08:49 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
QUOTE(A.B.D. @ Nov 17 2024, 09:14 AM)
The developer of Bon Kiara is starting work on the road extension to join Jalan Duta Kiara with Jalan Kiara 3. They have put up the support frame for hoarding.

user posted image
*
Any idea how long is gonna take?

Avenger_2012
post Jan 17 2025, 09:32 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2012
The road connection is barricaded. No progress yet as of now.

user posted image
user posted image