QUOTE(xxxdhonamaria @ Mar 10 2021, 04:31 PM)
Heard M also in waiting for shwe HHi jacket 12mton award soon. Massive jacket for phase 3 offshore myanmar
*12k mtonOil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
|
Mar 10 2021, 04:32 PM
Return to original view | Post
#61
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(xxxdhonamaria @ Mar 10 2021, 04:31 PM) Heard M also in waiting for shwe HHi jacket 12mton award soon. Massive jacket for phase 3 offshore myanmar *12k mton mohdyakup liked this post
|
|
|
|
|
|
Mar 10 2021, 06:17 PM
Return to original view | Post
#62
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(Stamp @ Mar 10 2021, 05:58 PM) Heard EPCIC, for jacket only. Topside by KSOE/HHI. mohdyakup liked this post
|
|
|
Mar 10 2021, 06:19 PM
Return to original view | Post
#63
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(xxxdhonamaria @ Mar 10 2021, 06:17 PM) In other words, subcon for jacket mohdyakup liked this post
|
|
|
Mar 10 2021, 08:29 PM
Return to original view | Post
#64
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
Serba Dinamik will be opening a consultant firm in kl and start to collect cv for E&I and Structural in LI, anyone here know the scope of the new consultancy by Serba Dinamik? Is it OnG/renewable energy etc etc mohdyakup liked this post
|
|
|
Mar 17 2021, 04:30 PM
Return to original view | Post
#65
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Mar 20 2021, 09:33 AM
Return to original view | Post
#66
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
|
|
|
Mar 21 2021, 08:13 PM
Return to original view | Post
#67
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Apr 12 2021, 06:05 PM
Return to original view | Post
#68
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Apr 18 2021, 11:17 AM
Return to original view | Post
#69
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
May 16 2021, 05:25 PM
Return to original view | Post
#70
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
My bet limbayong will goes to MTC 😬
|
|
|
Jun 22 2021, 09:35 PM
Return to original view | Post
#71
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Jun 23 2021, 11:14 PM
Return to original view | Post
#72
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
Sapura lumut is hiring, for what project? Hess phase 4? Saudi aramco?
|
|
|
Jul 9 2021, 04:34 PM
Return to original view | Post
#73
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
Hi,
Anyone here got experience interview with subsea7 KL? Is it easy interview or very high technical interview. Help |
|
|
|
|
|
Jul 17 2021, 10:19 PM
Return to original view | Post
#74
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
|
|
|
Aug 2 2021, 09:36 PM
Return to original view | Post
#75
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
Hi otai², might want to know u guys opinion which one have better prospects in subsea installaton? McDermott, Subsea 7 or Technip? Or our local heartthrob sapura?
This post has been edited by xxxdhonamaria: Aug 2 2021, 09:38 PM |
|
|
Sep 5 2021, 12:14 AM
Return to original view | Post
#76
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(ZZMsia @ Sep 2 2021, 09:30 PM) Yes, I have heard that their major structures project awarded at this point of time is HESS. Really? I thought there are other project too such as wellhead for pegaga, jacket from saudi Aramco and dorado wellheadAt the moment Pegaga has sailaway and completed installation. They are also bidding on an overseas project but construction wont be until 2023 or so. This post has been edited by xxxdhonamaria: Sep 5 2021, 12:14 AM ZZMsia liked this post
|
|
|
Sep 6 2021, 11:42 AM
Return to original view | Post
#77
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
ZZMsia liked this post
|
|
|
Oct 17 2021, 11:54 PM
Return to original view | Post
#78
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(ZZMsia @ Oct 8 2021, 10:50 AM) MALAYSIAN national oil company Petronas has suffered a setback on its first deep-water oilfield development in Malaysia, and in the process has unsettled the contracting sector. As expected, when the UM** got their power backFour Malaysian bidding groups are competing forthe contract to provide a floating production, storage and offloading vessel for Limbayong, as the development is known. The four are Yinson Holdings, MISC, Sabah International Petroleum (SIP) and Bumi Armada — the latter acting in partnership with compatriot MTC and India's Shapoorji Pallonji. A lucrative lease and operate contract is up for grabs with a firm 12-year period, plus a pair of options each for three years and another for two years. Sabah International was said to be in a favourable position to land the contract even though the other contenders were still in the race. However, according to multiple market sources in Kuala Lumpur, the bidding exercise has been suspended. Most of these sources expected a completely new invitation to tender to be issued soon, although some suggested that the suspension was more of a delay than a re-bid, allowing Petronas to address procedural issues. Petronas did not respond to a request from Upstream for an update on the Limbayong project, which the corporation thrust into the spotlight in June this year when it held a ceremony to mark a significant subsea equipment contract to TechnipFMC. With TechnipFMC already working on its contract, and Petronas having previously extended the validity of the FPSO bids to the end of October, there were few suggestions that the project has actually been cancelled. However, high-ranking Kuala Lumpur-based sources suggested a political clash of heads with the state of Sabah is having a direct impact on the FPSO contest. Sabah state government has been pushing for greater participation and local content in projects in its own waters. Issuing a new tender will require urgent discussions to take place on how to move forward, said sources. One unexpected solution that sources raised was that the nearby Bestari oil discovery, which was earmarked as a tie-in field to Limbayong, might host the FPSO instead of Limbayong. The final investment decision for Bestari is due soon, and sources suggested that developing Bestari first could deliver a better economic outcome. The Limbayong FPSO — as per the original tender specifications — was to offer production capacity of 60,000 barrels per day of liquids, including 40,000 bpd of oil, plus about 180 million cubic feet per day of associated gas. Water injection facilities for up to 75,000 bpd would also be included. The floater was expected to have nameplate storage capacity of 600,000 barrels of oil. Meanwhile, contenders to supply the external turret for the Limbayong FPSO included Bluewater, SOFEC, National Oilwell Varco and London Marine Consultants. |
|
|
Nov 26 2021, 07:03 PM
Return to original view | Post
#79
|
![]() ![]()
Junior Member
80 posts Joined: Oct 2020 |
QUOTE(ZZMsia @ Nov 18 2021, 06:01 PM) Agreed. Subsea 7 5k if I'm not mistakenOther MNCs in O&G is around 3500-5000. Some consultant is 2800 (RNZ) MMC is 3200 Aker if not mistaken is 3500 Not sure on MISC and SBM Drilling/Subsurface side varies between 3,000-above This post has been edited by xxxdhonamaria: Nov 26 2021, 07:04 PM |
|
Topic ClosedOptions
|
| Change to: | 0.1273sec
0.47
7 queries
GZIP Disabled
Time is now: 11th December 2025 - 05:30 PM |