It will link up Sungai Besi, Alam Damai, Ampang-Kuala Lumpur Elevated Highway and Kuala Lumpur Middle Ring Road 2.
The 31.8 km (19.8 mi) expressway will be built to reduce traffic jams along the Kuala Lumpur Middle Ring Road 2 (Federal Route 28) from Ampang to Bandar Tasik Selatan.
It will be mostly elevated. There will be 3 toll plaza in Alam Damai, Taman Bukit Teratai and Ampang Indah.
The construction of the project will begin in 2016 and be completed in 2020.
SUKE will be constructed for two main reasons:
- To link existing highways and expressways, specifically the areas of Sg Besi, Cheras, Pandan, Ampang and Ulu Klang, whilst providing an alternative for users of the MRR2. This linkage will allow for smoother traffic and reduced amount of commuting time. The projected reduction of traffic congestion on Jalan Ampang is expected to be reduced by 36%, by 24% on MRR2 and by 12% on Jalan Cheras.
- The construction of SUKE will also address the traffic needs of the future, with projections and analysis taking into account traffic volume up to the year 2027. At the same time, SUKE will also work in tandem with the changing needs of Malaysians for a better quality of life: reduced traffic congestion and less time spent on the road.
https://www.google.com/maps/d/viewer?mid=1v...5999999994&z=13
SUKE alignment (Video at 3:20)
This post has been edited by propusers: Jun 9 2017, 10:53 AM
Jun 9 2017, 10:52 AM, updated 7y ago
Quote
0.0218sec
0.37
6 queries
GZIP Disabled