 SUKE highway, Sg. Besi–Ulu Klang Elevated Expressway

views
     
TSpropusers
post Jun 9 2017, 10:52 AM, updated 7y ago

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
Sungai Besi – Ulu Kelang Expressway is a proposed urban expressway in Klang Valley, Kuala Lumpur, Malaysia.
It will link up Sungai Besi, Alam Damai, Ampang-Kuala Lumpur Elevated Highway and Kuala Lumpur Middle Ring Road 2.
The 31.8 km (19.8 mi) expressway will be built to reduce traffic jams along the Kuala Lumpur Middle Ring Road 2 (Federal Route 28) from Ampang to Bandar Tasik Selatan.
It will be mostly elevated. There will be 3 toll plaza in Alam Damai, Taman Bukit Teratai and Ampang Indah.
The construction of the project will begin in 2016 and be completed in 2020.

SUKE will be constructed for two main reasons:
- To link existing highways and expressways, specifically the areas of Sg Besi, Cheras, Pandan, Ampang and Ulu Klang, whilst providing an alternative for users of the MRR2. This linkage will allow for smoother traffic and reduced amount of commuting time. The projected reduction of traffic congestion on Jalan Ampang is expected to be reduced by 36%, by 24% on MRR2 and by 12% on Jalan Cheras.
- The construction of SUKE will also address the traffic needs of the future, with projections and analysis taking into account traffic volume up to the year 2027. At the same time, SUKE will also work in tandem with the changing needs of Malaysians for a better quality of life: reduced traffic congestion and less time spent on the road.

https://www.google.com/maps/d/viewer?mid=1v...5999999994&z=13


SUKE alignment (Video at 3:20)



This post has been edited by propusers: Jun 9 2017, 10:53 AM
TSpropusers
post Jul 31 2017, 02:57 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
deleted

This post has been edited by propusers: Jul 31 2017, 03:07 PM
TSpropusers
post Jul 31 2017, 05:40 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
already started...
TSpropusers
post Aug 1 2017, 10:34 AM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
QUOTE(jrshow @ Jul 31 2017, 06:06 PM)
got start mie?
i tot got people protest on this project?
*
already started along Jalan Ampang, and taman-taman area like taman dagang, taman putra, taman permai...



TSpropusers
post Aug 1 2017, 10:35 AM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
Attached Image
TSpropusers
post Aug 1 2017, 11:23 AM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
upper part, Cheras-Kajang highway interchange design.
lower part, Cheras Hartamas interchange design. Source from fb "Taman Bukit Segar Jaya 2 & 3" https://www.facebook.com/bsjra/


Attached Image


Sri Petaling Interchange design

Attached Image

This post has been edited by propusers: Aug 1 2017, 11:40 AM
TSpropusers
post Aug 8 2017, 02:33 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
progress of SUKE Cheras Kajang Interchange. Photo from skyscrapercity's Izzz.

Attached Image
TSpropusers
post Nov 20 2017, 03:34 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
Permai interchange

Attached Image

source: http://www.zelan.com/our-business/engineer...on/suke-highway


TSpropusers
post Nov 20 2017, 04:10 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
https://www.utusan.com.my/mobile/berita/wil...n-mrr2-1.553380

KUALA LUMPUR 15 NOV. - PROJEK Lebuhraya Sungai Besi-Ulu Kelang (Suke) yang dijangka siap dan dibuka pada Januari 2020 bakal memberi manfaat kepada kira-kira 176,568 pengguna kenderaan setiap hari.

Pengurus Besar Suke, Faizal Othman berkata, sambungan le-buh raya bertingkat tersebut bukan sahaja memendekkan jarak perjalanan, tetapi turut dapat mengatasi masalah kesesakan lalu lintas kritikal di Lembah Klang, terutama di Lebuh Raya Lingkaran Te­ngah Dua (MRR2).

Menurutnya, selain MRR2, Le­buhraya Suke turut menghubungkan beberapa lebuh raya lain antaranya Lebuhraya Duta-Ulu Kelang (Duke), Lebuhraya Bertingkat Am­pang-Kuala Lumpur (Akleh), Le­buhraya Sungai Besi (Besraya) dan Lebuhraya Cheras-Kajang.

Turut terlibat Lebuhraya Kuala Lumpur-Seremban dan Lebuh Ra­ya Shah Alam (Kesas) yang di­lihat se­bagai satu jaringan perhubu­ngan serba lengkap.

“Pada ketika ini projek berkenaan telah mencapai tahap kemajuan pembinaan sebanyak 11 peratus dan berjalan mengikut jadual.

“Ia melibatkan kerja-kerja ta-nah dan menanam cerucuk sejak 29 Ogos tahun lalu.

“Pembinaan sambungan lebuh raya sepanjang 24.4 kilometer ini menelan belanja kira-kira 5.2 bi­llion.

“Selain menyuraikan trafik, le­buh raya ini dapat menjimatkan petrol dan memendekkan jarak perjalanan pengguna contohnya daripada 75 minit kepada 25 minit,” katanya kepada Utusan Malaysia di sini.

Menerangkan lebih lanjut, Fai­­zal berkata, Lebuhraya Suke mempunyai 14 persimpangan bermu­la di Sri Peta­ling dan berakhir di Bu­kit Antarabangsa.

Menurutnya, jajaran turut me-libatkan Sungai Besi, Alam Damai, Cheras-Kajang, Cheras Hartamas, Bukit Teratai, Tasik Tambahan, Permai, Kosas, pekan Ampang, pu­sat beli-belah Ampang Point, Hulu Kelang dan Taman Hillview.

“Persimpangan di Alam Damai, Cheras akan menjadi laluan dua tingkat berikutan faktor kawasan padat dan mempunyai sebuah plaza tol setinggi 40 meter iaitu yang pertama di Malaysia.

“Sebaik tiba di Taman Len Seng dan Le­buh­raya Cheras-Kajang pengguna akan melalui laluan setingkat semula me­rentasi MRR2,” katanya.

Katanya, selaku syarikat konsesi, Projek Lintasan Kota Holdings Sdn. Bhd. (Prolintas) kerjasama se­mua pihak amat diperlukan ba­gi memastikan projek itu berjalan lancar. Tambahnya, Prolintas turut melancarkan kempen #contactlahkami yang menawarkan pelbagai saluran komunikasi bagi penduduk untuk mendapatkan maklumat berkenaan lebuh raya terbabit.

Beliau berkata, sempena pembukaan lebuh raya itu juga, pengguna akan dikecua-likan daripada bayaran tol selama sebulan.

“Terima kasih kepada kerajaan dan orang ramai yang menyokong penuh projek ini demi manfaat dan keselesaan pada masa hadapan,” katanya.
TSpropusers
post Nov 20 2017, 04:11 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
Progress pic.
Source https://www.utusan.com.my/mobile/berita/wil...n-mrr2-1.553380

Kerja pembinaan di tapak Plaza Tol Alam Damai Lebuhraya Suke.
Attached Image

Kerja pembinaan Lebuhraya Suke giat dijalankan di Lebuhraya MRR2 di Bandar Tasik Selatan, Kuala Lumpur.
Attached Image

Attached Image



This post has been edited by propusers: Nov 20 2017, 04:14 PM
TSpropusers
post Feb 9 2018, 04:09 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011

TSpropusers
post Sep 17 2018, 01:31 AM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
https://www.bharian.com.my/berita/wilayah/2...uke-dash-lancar

SHAH ALAM: Projek Lebuhraya Bertingkat Sungai Besi-Ulu Kelang (SUKE) dan Lebuhraya Bertingkat Damansara-Shah Alam (DASH) kini sudah memasuki 30 peratus proses pembinaan.

Ketua Pegawai Eksekutif Kumpulan PROLINTAS, Datuk Mohammad Azlan Abdullah, berkata pembinaan kedua-dua lebuh raya itu berjalan lancar seperti yang dijadualkan pihaknya.

“Kita setakat ini sudah melengkapkan kira-kira 30 peratus projek pembinaan yang dijalankan sejak 2016 berkenaan.

Pembinaan dua lebuh raya itu dijangka menepati tempoh untuk disiapkan iaitu pada 2020 nanti,” katanya ketika ditemui selepas majlis perasmian acara duathlon pertama di Malaysia membabitkan laluan lebuh raya yang ditutup sepenuhnya di Lebuhraya Guthrie di sini, hari ini.

Program itu dirasmikan oleh Pengerusi Kumpulan PROLINTAS, Datin Paduka Jamiah Abdul Hamid.

SUKE dan DASH masing-masing membabitkan kos pembinaan RM4.6 bilion dan RM4.1 bilion itu dijangka dapat mengurangkan kesesakan lalu lintas di kawasan ibu kota, Jalan Sungai Buloh dan Damansara.

Laluan SUKE sepanjang 24.4 kilometer dengan 14 persimpangan dan DASH sepanjang 20.1 kilometer dengan 13 persimpangan bermula dari Puncak Perdana, Seksyen U10 Shah Alam dan berakhir di Persimpangan Penchala.

Kedua-dua lebuh raya itu akan menggunakan konsep ‘elevated highway’ iaitu 90 peratus laluan tidak berada atas permukaan tanah namun dibina atas laluan jalan sedia ada dengan tiga lorong setiap arah.
TSpropusers
post Mar 5 2019, 03:27 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
QUOTE(propusers @ Sep 17 2018, 01:31 AM)
https://www.bharian.com.my/berita/wilayah/2...uke-dash-lancar

SHAH ALAM: Projek Lebuhraya Bertingkat Sungai Besi-Ulu Kelang (SUKE) dan Lebuhraya Bertingkat Damansara-Shah Alam (DASH) kini sudah memasuki 30 peratus proses pembinaan.

Ketua Pegawai Eksekutif Kumpulan PROLINTAS, Datuk Mohammad Azlan Abdullah, berkata pembinaan kedua-dua lebuh raya itu berjalan lancar seperti yang dijadualkan pihaknya.

“Kita setakat ini sudah melengkapkan kira-kira 30 peratus projek pembinaan yang dijalankan sejak 2016 berkenaan.

Pembinaan dua lebuh raya itu dijangka menepati tempoh untuk disiapkan iaitu pada 2020 nanti,” katanya ketika ditemui selepas majlis perasmian acara duathlon pertama di Malaysia membabitkan laluan lebuh raya yang ditutup sepenuhnya di Lebuhraya Guthrie di sini, hari ini.

Program itu dirasmikan oleh Pengerusi Kumpulan PROLINTAS, Datin Paduka Jamiah Abdul Hamid.

SUKE dan DASH masing-masing membabitkan kos pembinaan RM4.6 bilion dan RM4.1 bilion itu dijangka dapat mengurangkan kesesakan lalu lintas di kawasan ibu kota, Jalan Sungai Buloh dan Damansara.

Laluan SUKE sepanjang 24.4 kilometer dengan 14 persimpangan dan DASH sepanjang 20.1 kilometer dengan 13 persimpangan bermula dari Puncak Perdana, Seksyen U10 Shah Alam dan berakhir di Persimpangan Penchala.

Kedua-dua lebuh raya itu akan menggunakan konsep ‘elevated highway’ iaitu 90 peratus laluan tidak berada atas permukaan tanah namun dibina atas laluan jalan sedia ada dengan tiga lorong setiap arah.
*
https://www.thestar.com.my/metro/metro-news...nd-of-the-year/

Two major highway projects costing billions of ringgit are expected to be completed by the end of 2019, benefiting real estate developments within their vicinity.

These consists of the 20.1km-long Damansara-Shah Alam Highway (DASH) and Sungai Besi-Ulu Kelang Expressway (SUKE), which spans 24.4 kilometres. The former costs RM4.1 billion to construct, while expenses for the latter amounts to RM4.6 billion.

At present, both major roads are 52 percent complete and they are anticipated to open by mid-2020, said Datuk Mohammad Azlan Abdullah, Group CEO of Projek Lintasan Kota Holdings (Prolintas).

“Once operational, the highways will ease traffic congestion in the area. Indirectly, it would also help to stimulate the economy along the highway corridor,” he told The Star on Friday (22 Feb).

Notably, DASH will interconnect major roads – the Penchala Link, Damansara Puchong Highway (LDP) and New Klang Valley Expressway (NKVE) – with the Guthrie Corridor Expressway (GCE).

Consequently, DASH is anticipated to reduce traffic jams in Sg Buloh, Shah Alam, Damansara, Bandar Utama and Kota Damansara.

On the other hand, the three-lane SUKE extends from Sri Petaling and runs through Kajang, Cheras, Alam Damai, and Sungai Besi until Ulu Kelang.

This post has been edited by propusers: Mar 5 2019, 03:28 PM
TSpropusers
post Jul 16 2019, 08:53 AM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
QUOTE(sin2010 @ Jul 14 2019, 04:15 PM)
Is SUKE able to be finished at Jan 2020 ( as reported in news)? it seem not able to be finished at 2020, and it make the traffic become more worse  (especially during raining) along MRR2. what happen if they cannot finished on time? will they get fined by govt or just nothing happen and only the MRR2 users suffer every day?
*
don't think can complete in Jan 2020.

2nd half of 2020 mayb possible...

latest updated opening date is 28 August 2020
http://www.llm.gov.my/awam/highway_constr

get fined by govt or not has to depend on contract signed... and also whether govt wan execute or not...





This post has been edited by propusers: Jul 16 2019, 08:54 AM
TSpropusers
post Sep 29 2019, 07:29 PM

Look at all my stars!!
*******
Senior Member
2,007 posts

Joined: May 2011
https://www.thestar.com.my/metro/metro-news...le-of-next-year

METRO NEWS
Wednesday, 25 Sep 2019

THE Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) is expected to be opened to motorists in July next year.

Projek Lintasan Kota Holdings Sdn Bhd (Prolintas) chief executive Datuk Mohammad Azlan Abdullah said the project was currently 63% complete.

He expected the expressway to accommodate between 100,000 and 120,000 vehicles a day.

The 24.4km expressway with three lanes will comprise three toll plazas and 14 interchanges. “This project presents some technical challenges due to its height and location.

Read more at https://www.thestar.com.my/metro/metro-news...eM9tj3WYsA2V.99

This post has been edited by propusers: Sep 29 2019, 07:29 PM

 