> Learn from costly mistakes of Sunway BRT, says Penang Institute News

views
     
DarkNite
post Mar 2 2016, 11:23 AM

ФĻĐ ИΞШB!Ξ
********
All Stars
11,058 posts

Joined: Jun 2008
QUOTE(huaweie5830 @ Mar 2 2016, 10:54 AM)
Tldr

Summary pls
*
songlap! jgn x songlap!
leftist
post Mar 2 2016, 11:25 AM

Enthusiast
*****
Senior Member
734 posts

Joined: Jan 2007
From: Sri Petaling


sunway BRT is good but poor poor execution..who the hell gave the idea for the fare???..moron!
arubin
post Mar 2 2016, 11:26 AM

Holy Pastafarian
****
Senior Member
670 posts

Joined: Oct 2007
From: Church of the Flying Spaghetti Monster


QUOTE(LivingActive @ Mar 2 2016, 11:06 AM)
project meant for poor rider

but

ticket for rich lol
*
Sunway got poor folks meh? Takde wang, mana boleh pindah masuk Sunway? sweat.gif
SUSVelocity
post Mar 2 2016, 11:29 AM

Look at all my stars!!
*******
Senior Member
3,188 posts

Joined: Nov 2007
QUOTE(s3iryu @ Mar 2 2016, 11:02 AM)
BRT is nice, comfy but fare is high as fuark which makes driving to those places seems almost cost the same
*
driving there is sure more cheaper.
leftist
post Mar 2 2016, 11:31 AM

Enthusiast
*****
Senior Member
734 posts

Joined: Jan 2007
From: Sri Petaling


QUOTE(arubin @ Mar 2 2016, 11:26 AM)
Sunway got poor folks meh? Takde wang, mana boleh pindah masuk Sunway? sweat.gif
*
mentari court there got low cost flat
NasiLemakMan
post Mar 2 2016, 11:31 AM

oh hai! wan naslemak?
*****
Senior Member
962 posts

Joined: Oct 2006
From: KL
QUOTE(tohff7 @ Mar 2 2016, 11:09 AM)
It means they never do a proper study before they approved the project.

Charging so high fare but expect ridership to be high as well?
*
Or a good smokescreen to clean dirty money
xpole
post Mar 2 2016, 11:46 AM

Rain on me baby
******
Senior Member
1,410 posts

Joined: Dec 2009
From: Everywhere



Who the heck want to use if they charge so high? Public Transportation is for public. So the price also need to be reasonable and benefit to the public.


kir
post Mar 2 2016, 11:47 AM

New Member
*
Junior Member
16 posts

Joined: Aug 2011
for a mere distance...it's indeed bapak mahaaaaaal...
but very time saving...

if only they could lower the fare to a reasonable amount, songlap culture is still strong nonetheless...
teehk_tee
post Mar 2 2016, 11:55 AM

ไม่เป็นไร
*******
Senior Member
5,363 posts

Joined: Apr 2005
From: กรุงเทพมหานคร BKK

Expensive dou hai
s3iryu
post Mar 2 2016, 12:03 PM

Getting Started
**
Junior Member
158 posts

Joined: Mar 2005


QUOTE(Hi! @ Mar 2 2016, 11:31 AM)
I think the biggest group that benefited from this are the residents of Mentari Court. 1 station reach Sunway Pyramid.
*
Sunway Lagoon station still need to walk 300 meters from station to Pyramid
JimbeamofNRT
post Mar 2 2016, 12:23 PM

the Original Lanji@_ Chicken Rice Shop Since 2002
******
Senior Member
1,902 posts

Joined: Sep 2012

QUOTE(joe_mamak @ Mar 2 2016, 10:50 AM)
Link has infographics

http://www.themalaysianoutsider.com/cityne...nstitute-report

Learn from costly mistakes of Sunway BRT, says Penang Institute

BY NOEL ACHARIAM

Published: 28 February 2016 7:01 AM

Penang Institute is questioning the manner in which the contract for the construction of the Sunway Bus Rapid Transit (BRT) project was awarded, and the way the system was designed, in a report entitled "The Sunway Bus Rapid Transit (BRT) Line: Lessons for The Future".

The report states that the choice of contractor had raised many questions in terms of conflict of interest and private sector "capture" of a public infrastructure project.

“The Sunway BRT line was officially launched by Prime Minister Najib Tun Razak on June 2, 2015. Costing a total of RM634 million – which averages out at RM117 million per km – the 5.4km elevated BRT line appears to be on the high end of the cost spectrum for BRT systems.


“The manner in which the design and contract of this BRT system was decided upon – via a direct negotiation public private partnership (PPP) contract – raises many questions in terms of conflict of interest and private sector ‘capture’ of a public infrastructure project," said the report.

The contract to build the elevated BRT line was awarded to Sunway Construction, a subsidiary of Sunway Bhd, which is the biggest beneficiary of the Sunway BRT line, which has many properties (already built and in the process of being built), businesses and educational institutions that is served by the Sunway BRT line”.


“The inclusion of Sunway Bhd as one of the stakeholders in this PPP  project via its Corporate Social Responsibility contribution (15%), the partial funding of this PPP project via the Facilitation Fund (15%), which comes under the Public Private Partnership agency in the Prime Minister’s Department (otherwise known as UKAS), all point towards possible explanations for the decision to build the elevated BRT line at what seems to be a high cost.

“The private sector ‘capture’ of this PPP project is reflected in the naming of the BRT stations, whereby four out of the seven stations have  ‘Sunway’, or an abbreviation of Sunway, in their names, and one station called 'South Quay' takes the name of one Sunway’s property developments.”

The report said the Sunway BRT had also set a poor precedent with its exorbitant fare structure averaging RM1 per km.


“According to the structure guidelines issued by the Land Public Transport Commission (SPAD), to travel the equivalent of 24km on a BRT line in Malaysia, one would have to pay RM10.

"For the proposed KL-Klang BRT line, a one-way journey of 34km would cost RM12.10.  Do the math and the monthly expenditure on BRT fares will come up to RM484. This represents almost 54% of Malaysia’s legislated minimum wage figure of RM900, and will be a very significant expenditure indeed.”

The institute said the ludicrously high fee structure also calls into question the decision to build an elevated BRT and the process by which the contract was awarded.

“Were there any studies done by either UKAS, SPAD or Prasarana on the possible fare structure of the Sunway BRT Line? Did Prasarana have to finance the RM444 million of its share in the construction costs of the Sunway BRT, given that it was already in debt to the tune of RM13.91 billion at year end 2014?

“A one-way ticket from Sunway-Setia Jaya to USJ7 will cost RM5.40. By comparison, even after its fare revision in December 2015, it would only cost RM4 to travel from the Kelana Jaya LRT station to the KLCC LRT station. Taking the BRT costs significantly more than the toll rates on highways leading to KL, and will form a significant financial burden on those who rely heavily on public transport, such as the lower income group.”

The institute said students will also be among those affected, as they do not have an income.

“These exorbitant fares definitely have an impact on ridership, and have already contributed to low ridership figures compared with during the period of free rides, where it was normal for stations and buses to be packed.

"This does not bode well for the route’s original aim of reducing congestion in the Bandar Sunway area, as given the comparatively cheaper toll rates, people may choose to drive to and from Bandar Sunway instead.”

The institute said the decision to build the costly elevated BRT line, funded primarily by an already heavily indebted Prasarana (70%), could explain the decision to structure the fares of the BRT line at the exorbitant rate of RM1 per km.

“After a trial period of two months, in which the rides on the BRT Line were offered for free, the exorbitant fare structure caused a 63% drop in the average daily ridership when it was implemented in August 2015.

"The ridership recorded in August 2015 – 4,616 per day or 256 per hour – is approximately 11% of the initial projected ridership of 2,400 per hour."

The institute said Prasarana’s rationale for the fare structure, that it was impossible to cover the Sunway BRT operational cost at the current ridership rate, begs the question of how that would work out,  given that ridership has drastically fallen since the introduction of the fares.

“Again, detailed breakdowns of the operational cost are unavailable, although we can speculate that the additional cost comes from the maintenance of the elevated bus lanes, lifts and escalators in all the elevated stations. One might also argue that the signalling system may be a substantial cost, but that is in fact a common feature in all BRT systems in the world. Therefore, the spotlight would mostly shine on the maintenance of the elevated infrastructures.”

The institute said attention now needed to be focused on the upcoming KL-Klang BRT line.

"The many lessons learnt from the Sunway BRT line need to be incorporated into future BRT lines in the country, starting with the approved but yet to be implemented 34km KL-Klang BRT line.

“A sum of RM1 billion was initially announced for this project in the 2016 budget. But up till now, there has been little additional information regarding the estimated cost for this project, the exact location of the 25 stations along the 34km line, the overall design and route alignment of the line, and the tender process to parcel out these contracts, just to name a few of the more crucial elements.

"And this is a project that is supposed to begin construction in the third quarter of the year and be completed by 2018!

"The lessons learnt from the Sunway BRT line must be incorporated into all aspects of the KL-Klang BRT system, including but not limited to the following, such as proper costing that is transparent for different BRT models; a BRT masterplan which integrates the planned stations with other public transport hubs and stations; open and competitive tender process for construction of various parcels of the BRT line;  financing structure of the construction contract for the BRT line, including ownership of the physical infrastructure post construction; operation and management of the BRT line, including proposed fare structure based on financing and operational costs;  and, inclusion of the local authorities of Selangor and KL among the stakeholders in planning for an integrated public transport network that is linked to the BRT line.”

The institute wished to know why the Subang Jaya Municipal Council was not given much say in the design and route alignment of the Sunway BRT line, which is in an area within its jurisdiction.

“We have to demand that our local authorities play a bigger role in the proposal of local transit solutions, because ultimately, they are more familiar with the locality than a federal agency. Certainly, it is easier to hold them accountable should they bow to corporate pressure on issues that concern public welfare, instead of the relatively distant federal agencies.

"The mistakes associated with the Sunway BRT line need to be avoided to enable the KL-Klang BRT line to be accessible, affordable, efficient and cost effective,” the report concluded.

The Sunway BRT line was built to relieve traffic congestion in Bandar Sunway and Subang Jaya, as well as to link the Sunway area to the KTM Komuter line via the Setia Jaya KTM station, and to the Kelana Jaya Line extension via the USJ 7 LRT station. – February 28, 2016.
*
user posted image

it is expensive. and most of the time kosong.



JimbeamofNRT
post Mar 2 2016, 12:24 PM

the Original Lanji@_ Chicken Rice Shop Since 2002
******
Senior Member
1,902 posts

Joined: Sep 2012

QUOTE(Hi! @ Mar 2 2016, 11:27 AM)
Problem is all about connectivity and current infra. If BRT can connect with Kelana Jaya LRT, conlanfirm good business.
*
+1.

Connectivity failed.

FMHO if connect directly to Puchong should be good.
arif85124
post Mar 2 2016, 12:34 PM

New Member
*
Junior Member
43 posts

Joined: Mar 2009
From: inside Marisa hat


QUOTE(Hi! @ Mar 2 2016, 11:27 AM)
Problem is all about connectivity and current infra. If BRT can connect with Kelana Jaya LRT, conlanfirm good business.
*
brt will connect with kelana jaya line at ss7 once it finish.
ZeroSOFInfinity
post Mar 2 2016, 02:15 PM

Look at all my stars!!
*******
Senior Member
3,703 posts

Joined: Oct 2005


QUOTE(Hi! @ Mar 2 2016, 11:31 AM)
I think the biggest group that benefited from this are the residents of Mentari Court. 1 station reach Sunway Pyramid.
*
Actually no. The one most beneficial is the students going to Monash or Sunway University. Because that's the place I see most people get up and down.


juicyliana
post Mar 2 2016, 02:18 PM

when u think juicy, think liana
*****
Senior Member
746 posts

Joined: Aug 2011
From: Lowyat.net
brt is a stupid project... the LRT line can actually serve that area to save cost.
ZeroSOFInfinity
post Mar 2 2016, 02:18 PM

Look at all my stars!!
*******
Senior Member
3,703 posts

Joined: Oct 2005


QUOTE(JimbeamofNRT @ Mar 2 2016, 12:24 PM)
+1.

Connectivity failed.

FMHO if connect directly to Puchong should be good.
*
Unfortunately they can't. That's because the bus lane will have to go through open tin mine lands before reaching Puchong station. Not a very safe option.
ZeroSOFInfinity
post Mar 2 2016, 02:26 PM

Look at all my stars!!
*******
Senior Member
3,703 posts

Joined: Oct 2005


QUOTE(juicyliana @ Mar 2 2016, 02:18 PM)
brt is a stupid project... the LRT line can actually serve that area to save cost.
*
The story I heard was there will be only one LRT station at Bandar Sunway (most likely beside Sunway Pyramid). Therefore Jeffery Cheah decided to build BRT instead.
Jamesmeepok
post Mar 2 2016, 02:29 PM

New Member
*
Newbie
2 posts

Joined: Nov 2015
The sole purpose is to songlap

Money already in pocket

Who cares about ridership
Wassupman
post Mar 2 2016, 02:30 PM

Enthusiast
*****
Senior Member
722 posts

Joined: Mar 2013
if they let the lrt to pass from puchong to sunway, there are much more benefits... jam can be reduced, the money for brt can be used for something else... oh wai..


gjohn
post Mar 2 2016, 02:47 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
idea good..
but fare structure not very good..
i live in pjs 10 which is in Bandar Sunway..
never had a chance to take BRT