Any guesstimate on when we can expect the 2b billing?
Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai
Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai
|
|
Jan 8 2016, 05:46 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
Any guesstimate on when we can expect the 2b billing?
|
|
|
|
|
|
Jan 8 2016, 10:27 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
11,943 posts Joined: Mar 2012 From: Kuala Lumpur |
very slow progress instead. maybe MRT work and traffic diversion affecting such
|
|
|
Jan 10 2016, 04:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
Taken 3 hrs ago. BlkJ site ![]() |
|
|
Jan 10 2016, 04:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
BlkH...From this angle, can't see much significant progress... maybe need to find another angle
![]() |
|
|
Jan 10 2016, 04:45 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do...
![]() |
|
|
Jan 10 2016, 07:09 PM
|
![]()
Junior Member
17 posts Joined: Sep 2015 |
QUOTE(Jagalat @ Jan 10 2016, 04:45 PM) BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do... Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched?![]() I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. |
|
|
|
|
|
Jan 10 2016, 10:06 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
QUOTE(zerohedge @ Jan 10 2016, 08:09 PM) Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched? Haha...your other friend / identity didn't tell you?I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. There are 3bedrooms units for Ekocheras but very limited units. The launching psf is approx RM700+(higher floor higher, lower floor lower) Typical launching price tag is shown in the first few posts below...Hunt for those bumi units(yellow stickers ) if you are interested.... https://forum.lowyat.net/topic/3235184 |
|
|
Jan 11 2016, 09:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
Received angpau envelope from Ekovest..
|
|
|
Jan 11 2016, 11:10 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
918 posts Joined: Jan 2012 |
|
|
|
Jan 12 2016, 05:32 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
|
|
|
Jan 12 2016, 07:39 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
855 posts Joined: May 2010 From: Petaling Jaya, Selangor |
read somewhere that ekovest is controlled by hishammuddin's brother, right?
|
|
|
Jan 13 2016, 12:04 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
918 posts Joined: Jan 2012 |
|
|
|
Jan 13 2016, 06:31 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
|
|
|
|
|
|
Jan 13 2016, 11:07 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
B3, B2, B1, LG, G, L1 and L2 floors are commonly connected across EKC.
For now BlkJ is heading to B1(floor not revealed per last Sunday). Other buildings will be slower. Is there a time that all common floors needed to be connected horizontally then followed by vertical construction? If such time exists, then the waiting time of BlkJ depends on progress on other buildings. In other word, the next billing of BlkJ will also not that soon. Any insider or expert opinion? |
|
|
Jan 17 2016, 09:33 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
BlkJ, taken this afternoon before raining. ![]() |
|
|
Jan 17 2016, 09:35 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
BlkH, unobstructed view after the "soil island" being cleared... ![]() |
|
|
Jan 17 2016, 09:36 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
BlkN, more progress compared previous month. ![]() |
|
|
Jan 19 2016, 10:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
Greetings to buyers, after a discussion with Steven boss, we decided to start a whatsapp chat group for Ekocheras buyers. Buyers verification is required to ensure only buyers to be added to the group.... Pls PM us your details (name, verification documents) (First verified, first served....for the remaining 98 members) Thanks |
|
|
Jan 20 2016, 12:22 PM
|
![]() ![]()
Junior Member
111 posts Joined: May 2009 |
QUOTE(Jagalat @ Jan 19 2016, 10:44 PM) Greetings to buyers, after a discussion with Steven boss, we decided to start a whatsapp chat group for Ekocheras buyers. Pm u here? Or fb?Buyers verification is required to ensure only buyers to be added to the group.... Pls PM us your details (name, verification documents) (First verified, first served....for the remaining 98 members) Thanks |
|
|
Jan 20 2016, 12:30 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,949 posts Joined: Oct 2013 |
|
| Change to: | 0.0226sec
0.56
6 queries
GZIP Disabled
Time is now: 14th December 2025 - 03:47 PM |