Outline ·
[ Standard ] ·
Linear+
Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai
|
Jagalat
|
Jan 6 2016, 12:24 PM
|
|
Upon further inspection on the pictures, understand it is for artist impression or illustration purpose, the road ramps seem to be a bit cacat, as follow, 1) Is each ramp bidirectional? If so, then what is the purpose of having two ramps at the same side of MRR2? If not, then where is the entrance and exit from the other side of MRR2(ie from Billion/Bkt Tiara side)side? (Imagine l came from Pandan using MRR2 wishing to enter the site)
This post has been edited by Jagalat: Jan 6 2016, 12:25 PM
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 10:43 AM
|
|
QUOTE(CMW123 @ Jan 6 2016, 04:36 PM) 2a completion of piling billing issued for both Block J AND H? Any blockH buyer in the forum, pls advise. Thanks.
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 10:59 AM
|
|
QUOTE(lamode @ Jan 6 2016, 03:06 PM) Based on the pics, i think it's not b- directional, one for entry, one for exit. perhaps they expecting people to make a u turn near the BTS LRT?b Looks like it....inconvenience.... Those who wish to visit the Vmall, upon reaching at Tasik Selation Uturn, may have a second thought heading to BJ or Paradigm2, instead...
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 04:37 PM
|
|
QUOTE(gks @ Jan 7 2016, 11:45 AM) Regardless the differential progress between block J & H, both blocks have to be VP-ed and obtain CCC in the same time. Yes, same VP time. One benefit of updating the billing request is to reflect the progress performance of individual block and buyers are pre-alerted to allocate money (those 70% loan)
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:44 PM
|
|
Taken 3 hrs ago. BlkJ site
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:44 PM
|
|
BlkH...From this angle, can't see much significant progress... maybe need to find another angle
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:45 PM
|
|
BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do...
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 10:06 PM
|
|
QUOTE(zerohedge @ Jan 10 2016, 08:09 PM) Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched? I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. Haha...your other friend / identity didn't tell you? There are 3bedrooms units for Ekocheras but very limited units. The launching psf is approx RM700+(higher floor higher, lower floor lower) Typical launching price tag is shown in the first few posts below...Hunt for those bumi units(yellow stickers ) if you are interested.... https://forum.lowyat.net/topic/3235184
|
|
|
|
|
|
Jagalat
|
Jan 11 2016, 09:37 PM
|
|
Received angpau envelope from Ekovest..
|
|
|
|
|
|
Jagalat
|
Jan 13 2016, 11:07 AM
|
|
B3, B2, B1, LG, G, L1 and L2 floors are commonly connected across EKC.
For now BlkJ is heading to B1(floor not revealed per last Sunday). Other buildings will be slower.
Is there a time that all common floors needed to be connected horizontally then followed by vertical construction? If such time exists, then the waiting time of BlkJ depends on progress on other buildings. In other word, the next billing of BlkJ will also not that soon. Any insider or expert opinion?
|
|
|
|
|
|
Jagalat
|
Jan 17 2016, 09:33 PM
|
|
BlkJ, taken this afternoon before raining.
|
|
|
|
|
|
Jagalat
|
Jan 17 2016, 09:35 PM
|
|
BlkH, unobstructed view after the "soil island" being cleared...
|
|
|
|
|
|
Jagalat
|
Jan 17 2016, 09:36 PM
|
|
BlkN, more progress compared previous month.
|
|
|
|
|
|
Jagalat
|
Jan 19 2016, 10:44 PM
|
|
Greetings to buyers, after a discussion with Steven boss, we decided to start a whatsapp chat group for Ekocheras buyers.
Buyers verification is required to ensure only buyers to be added to the group.... Pls PM us your details (name, verification documents) (First verified, first served....for the remaining 98 members) Thanks
|
|
|
|
|
|
Jagalat
|
Jan 20 2016, 12:30 PM
|
|
QUOTE(guardize @ Jan 20 2016, 01:22 PM) PM here will do
|
|
|
|
|
|
Jagalat
|
Jan 20 2016, 03:29 PM
|
|
This is a list from my inventory. Not sure if their latest status. I may miss out someone.
mybenz TBK1123 mydrm12345 The Jedi Jasonmathew pepper99 cheong87 neonikson1 Ekorjiulai soon9913 maldiniho CMW123 ecin windz1984 TFCapital
Pardon if I overtyped... Pls PM your details for verification, should you are interested to join the EKC buyer's Whatapps group
This post has been edited by Jagalat: Jan 20 2016, 03:52 PM
|
|
|
|
|
|
Jagalat
|
Jan 21 2016, 10:35 PM
|
|
The above topic is also discussed in the chat group. Sounds like they are chasing multiple buyers too.
My plan is to submit this weekend should there is major concern.
Details can discussed in the whatsapp that contains buyers. Thanks
|
|
|
|
|
|
Jagalat
|
Jan 22 2016, 12:23 AM
|
|
QUOTE(cteh2 @ Jan 22 2016, 12:58 AM) Can pls add me to buyer whatapps group? Pls refer to my PM for details. Thx
|
|
|
|
|
|
Jagalat
|
Jan 22 2016, 07:23 PM
|
|
QUOTE(looktf @ Jan 22 2016, 07:17 PM) Dear brother, Wish to join your whatsapp group as a buyer of Ekocheras. My info as below: Hope above info are in order. Thanks, Look Bro, we don't need to type details publically. Pls refer to my whatsapp to you. Thx This post has been edited by Jagalat: Jan 22 2016, 07:31 PM
|
|
|
|
|
|
Jagalat
|
Jan 23 2016, 12:47 AM
|
|
To all buyers who wish to join the Whatsapp group, here are the items to prepare
1) Pls send a PM stating your name and hp number 2) Upon receiving a whatsapp msg from us, pls reply and provide one thing for buyer's verification, ie recent letter to you from the developer or SnP page. (If you own more than one unit, info of one unit is sufficient.) You may mask your name(partial), address and unit number, l just need to read the block and floor (eg E-08-**) and partial name(at least) from the document. We respect your privacy.
Engaging in a PM is to ensure one-to-one requestor and admin conversation. Verification is required to ensure true buyers onboarding. Thx for understanding. Hope this clarifies all doubts you may have. Cheers
|
|
|
|
|