Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

Investment SETIA ECOHILL (VERSION 13A) [Owner's Thread], An Inspiring Eco Township in Semenyih

views
     
darween13
post Jun 8 2015, 09:33 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(treehill @ Jun 4 2015, 06:52 PM)
Bro, 5-7K enough?
*
Just need design, not design and built. For kitchen and living that is pretty much it.

darween13
post Jun 8 2015, 09:34 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(lusiao123 @ Jun 4 2015, 07:08 PM)
Just ID for living room & kitchen, 5-7k shld b feasible for some  ID companies.

Yep. its abit expensive but understand why he asked for That range of price..I hv seen his works from my client that very beautifully done.
*
Hi Lusiao,

Any contact for ID?

Thanks.

darween13
post Jun 8 2015, 09:38 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 5 2015, 11:14 AM)
Darween, i m going to the reno expo this weekend to 66cc for ideas and quotes.
*
TKJ,

I went too. On Sunday. I found an attractive deal that is only available at Expo by Jomecowood.
They are selling solid wood furniture and kitchen counter top. I was quoted 500 per ft run for counter top by Rowenda kitchen as opposed to RM230 per ft run by Jomecowood. Secured the price by booking - RM500. The material is limited to Oak, American Walnut and Sapelli though. Planning for solid wood counter top for dry kitchen, bar counter. biggrin.gif

Homedec in October will be another hunting ground.


darween13
post Jun 8 2015, 09:40 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 5 2015, 11:16 AM)
Was in SEH over the weekend. Paid the deposit for TNB and Water. The fencing is not wooden - similar type but concrete slabs. About 4-5ft height. They already install for Stagnia.


darween13
post Jun 8 2015, 09:41 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(gtfan @ Jun 4 2015, 06:52 PM)
If want cheap id, try engaging those still studying interior. They charge few hundred per room. wink.gif
*
GTFAN,

Do you have any contact that you want to refer?
Would love to get some ideas.
smile.gif
darween13
post Jun 8 2015, 09:50 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


Dear All,
Primarily P3 buyers.
I was in SEH over the weekend to settle the TNB and Syabas deposit.
Found out that Tralas having about 8% (4%+4%) discount for existing buyers.
Grandlis about 10% (5%+1%+4%) - the 1% if booking is made on 14 June only.

Tralas is an awesome proposition! Pay only 30k+ DP and get to save about 18 months of interest given that Tralas wasnt under DIBS.

Also, I found out that P3 will also need to form RA. The management of security will be under RA. The landscape and park maintenance is under SEH. RA needs to be formed once VP because SEH is JV between SEH and RA unlike Setia Alam, where first 2 years managed by Setia. Dafuq!?

My understanding all along was P2 and P3 will be by SEH.
Anyone has any clues.
darween13
post Jun 8 2015, 11:32 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(robert82 @ Jun 8 2015, 11:22 AM)
That's not what they said earlier...
*
Thats my thoughts too. I thought fully managed by SPS - SEH.
Need to wait TKJ to see how to query on this.

Thanks.

darween13
post Jun 11 2015, 11:34 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 11 2015, 11:16 AM)
I got a question about the yard area. Since we are prohibited to conduct any exterior reno, then what are we suppose to do with the yard area? Wet ktichen cannot, laundry area pun macam cannot  sweat.gif  sweat.gif  sweat.gif
*
Checked with SEH team, back area can reno..

darween13
post Jun 12 2015, 10:35 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 11 2015, 12:41 PM)
Darween,

Meaning itu yard boleh convert into a wet kitchen/laundry area?
*
Yes TKJ.
According to SEH, the facade at the front untouchable.. But, Celeste i think, said that simple stuff upon approval by MPKJ and endorsement by SEH is allowed.
Back certainly can.

Am planning to make it laundry area.
smile.gif
darween13
post Jun 12 2015, 10:36 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(robert82 @ Jun 11 2015, 01:27 PM)
this is interesting, so the back part and the yard i can do full extension?
*
Dont think full extension is allowed.
Can cover yard area. I checked this recently last Sunday.

darween13
post Jun 17 2015, 11:14 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 15 2015, 12:44 PM)
Yes, kitchen cabinet is the most expensive carpentry work in the entire house.

I got a quote for this kitchen cabinet with an island, using solid plywood and acrylic 4G door. Length 23.5 ft for the kitchen cabinet and 3 ft by 5 ft for the island. Total RM21,500++ excluding hood, hob n oven.  sweat.gif  sweat.gif  sweat.gif
*
TKJ,

How much they charging per ft run for the solid wood?
And, I personally dont like acrylic 4G doors because even a wipe with cloth will cause swirls.. later on alot of scratch and it will lose its shine.

Pricing is somewhat market for such cabinet.
I can buy 3 pool tables or have a full home AV system !
darween13
post Jun 17 2015, 04:11 PM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(cheryee @ Jun 17 2015, 11:34 AM)
Dunno how much per foot run, didnt ask leh. So which type of door is better?

BTW, fan gor's cabinet for 5.5k ok or not the price? https://forum.lowyat.net/index.php?showtopi...post&p=74911673
*
I am going to use glass or melamine.
Glass confirm will have aluminium edging.

darween13
post Jun 26 2015, 02:30 PM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(pingubabe @ Jun 25 2015, 04:59 PM)
if wanna do extension le? how long will that roughly take?
*
What kind of extension are we talking here?
If you want to fully extend your back portion both floors, then, I would think 2 weeks to get structural work done. Another 2 weeks for tiling, painting, installation of power points and electrical equipment.
If you gonna build your kitchen in concrete, then this can run parallel after the structural work.
Assumption based on 5 full time workers at your place. 9-6 everyday except Sunday and weather permits.



darween13
post Jun 29 2015, 09:59 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(pingubabe @ Jun 26 2015, 02:47 PM)
Planning to only extend 1 floor only.
I guess it will take at least 1 mth for the extension + another mth for kitchen cabinet and minor reno right?

hmm.gif  kinda rush if we r getting VP in sept and plan to move in by Dec'15 sweat.gif
Btw, my unit is Aquatilis
*
Then again, depends. If you are doing 1 floor extension and some minor reno, i trust it can be done in 6 weeks.
Nonetheless, during reno, you often will have new ideas which will prolong your reno process.
Kitchen cabinet depends on the contractor.
Am doing concrete bottom, so it will be part of all the wet work that am going to carry out.

However, its better not to rush and do it perfectly now than regret of defects later.
Also, dont know how much ratification work is required on defects and how fast can SPS complete.

December is quite a rush.


darween13
post Jun 29 2015, 10:03 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(d0j0b @ Jun 28 2015, 11:07 AM)
Tenby will be officially open at the end of 2016, and there will be fees discount about 30% (if I am not mistaken).
*
The fee presented in the brochure is however after the 30% discount and not a 30% on top of the figures stated.

darween13
post Jun 29 2015, 10:03 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(shawnk @ Jun 28 2015, 01:26 PM)
I understand that EcoHill link to Lekas will be available before VP. Anyone knows if that's still the case?
*
Ecohill Link is expected to open on 10 July 2015.


darween13
post Jun 29 2015, 10:07 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(samkps @ Jun 28 2015, 06:04 PM)
This is the fee structure for those who has interest in Tenby...

According to the principal, for the first batch, this is 30% fee reduction compare to Ecopark..  rclxms.gif  rclxms.gif
*
For a private school, the fee aint that steep.
About RM1k per month for a kid.

Mind you, the fee has incorporated the 30% discount.
Someone did raise a question if the first batch would receive further discount (early bird) or any scholarship.
The answer was vague-they will try but cannot say for certain.

But, the Jonathan guy who is going to be the Principal for SEH Tenby quoted this:
"In September 2016, when Tenby opens at SEH, my kids are going to be enrolled in and thus, you can be assured, I will be executing plans that will benefit my kids as much as it will for yours."


darween13
post Jun 29 2015, 10:11 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(LGThan @ Jun 28 2015, 10:51 PM)
Checked wt SA today....during VP we hv to pay quit rent, assessment fee and maintenance fee for few months only. I repeatedly ask whether the fee is for 1 year...sh reiterated that it is for few months. I believe we hv to form RA and manage it by ourself. Phase 2 & Phase 3 buyers ...fyi.
*
SEH management did indicate that there will be no RA / JMB at SEH.
They call it Homeowners Berhad - which is expected to form in 3-5 years time.
Unclear of the role of Homeowners Berhad.
Am writing an email to the Hanafiah guy to enquire further.

darween13
post Jun 29 2015, 10:12 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(samkps @ Jun 28 2015, 11:21 PM)
Bro, how you drive in? I thought they put a big pillar to block the access around 2-tier roundabout? Furthermore, it is not yet gone through final checking I presume. If I were you, I won't take risk.. really not sure what will happen since it is still not yet completed...

Yeah, last time we join the trip organized by the SEH. The bus taking less than 3 minutes to reach the flyover bridge. Therefore, when the road is completely done, I think from the 2 tier roundabout till Lekas Semenyih exit only merely 2 minutes...

Yeah, that's why I hope IJM can quickly upgrade the toll booths available in Lekas Semenyih..
*
Bro Sam,

Yesterday, i think they removed the barriers to allow vehicle through.
Saw some vehicles going in and out. To ease congestion and show owners the SEH Link.

darween13
post Jun 29 2015, 10:35 AM

Regular
******
Senior Member
1,427 posts

Joined: May 2012
From: Kuala Lumpur


QUOTE(treehill @ Jun 29 2015, 10:18 AM)
I thought is after Ecohill run?
*
I dont think it is going to be open for non SEH owners. The official date will be after the run.
10 July - expect completion and fully operational.

Maybe the barriers at the start near toll will be maintained still.


3 Pages < 1 2 3 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0466sec    0.68    7 queries    GZIP Disabled
Time is now: 21st December 2025 - 03:09 PM