Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
9 Pages « < 3 4 5 6 7 > » Bottom

Outline · [ Standard ] · Linear+

 Sg Long Property V3

views
     
samkps
post Jul 7 2015, 09:15 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 7 2015, 09:08 PM)
Should be MRT instead of LRT

EKVE end up at Ukay Perdana not sure it help for KL bound people compare to more direct CKE or Silk-Besraya.
*
As alternative I presume..

When come out from EKVE is already in Ampang Waterfront...

If SUKE is realized and connected to EKVE, then will be all the way highway till almost reaching klcc...
samkps
post Jul 7 2015, 09:22 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 7 2015, 09:19 PM)
Any news for SUKE?
*
SUKE so far still very quiet.... sweat.gif sweat.gif
samkps
post Jul 7 2015, 09:47 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 7 2015, 09:29 PM)
Without SUKE the benefit of EKVE will be reduced really not sure whether it is worth the risk of polluting our water source.
*
With more and more development at the southern part of KV, NS highway, CK, Silk-besraya is no more sufficient to accommodate the requirement... When all these highway already jammed up then only look for alternative is already too late...


samkps
post Jul 8 2015, 10:40 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 8 2015, 10:08 AM)
Not sure this alignment is final, which part is Phase 6?
*
If following the alignment in google, I think the square box is the most probable affected area..

Google map shows only the land clearing only.. Is it houses already being built? Perhaps EKVE should acquire this land from the developer...

Google street view at the entrance of Jalan DB6/2 shows it is a new housing, maybe already outdated..


Attached thumbnail(s)
Attached Image Attached Image Attached Image
samkps
post Jul 8 2015, 12:53 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(fahrur_07 @ Jul 8 2015, 12:30 PM)
possible sand mining area in blue circle
blue line = road use by the lorry
*
hmm... if from the google map, the one in red circle looks more like sand mine to me... hmm.gif hmm.gif

Not sure though..

This post has been edited by samkps: Jul 8 2015, 01:32 PM


Attached thumbnail(s)
Attached Image
samkps
post Jul 8 2015, 01:06 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(fahrur_07 @ Jul 8 2015, 12:10 PM)
Phase 6 in red circle
*
This is bad, it seems like they have drag the the route about 150 - 200m nearer to the DB phase 6 from the original plan...

Perhaps AZRB want to save cost so that the route no need to pass through the pond? doh.gif doh.gif

This post has been edited by samkps: Jul 8 2015, 01:31 PM


Attached thumbnail(s)
Attached Image
samkps
post Jul 8 2015, 02:14 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 8 2015, 02:07 PM)
Any idea where can get the latest alignment map? AZRB should not allowed to change to alignment without valid reason.
*
By right so... Because that the route they submit for Environmental impact assessment, cannot just simply change..

Perhaps bro Fahrur can share the layout plan AZRB provid to the developer, so that public aware about the changes..


samkps
post Jul 8 2015, 02:35 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 8 2015, 02:29 PM)
No only DU. Palm Walk 3, Admiral Park, Twin Palms may have highway at your back yard. hmm.gif
*
The highway should be mostly at the elevated hilly area, no?
samkps
post Jul 8 2015, 08:39 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 8 2015, 03:15 PM)
All these taman has hill at their back.

I think EKVE shoud be build at non rock site of Bukit Enggang, the rock hill part of Bkt Enggang at the back of Palm Walk 3 shall be untouched.
Otherwise rock blasting expenses will be enormous.
Behind Admiral Park and Twin Palms should be forest at hill side if not mistaken.
*
Presumably EKVE will avoid the rock blasting, as much as they can... Don't think EKVE will have a tunnel as well, so blasting activity should as minimize as possible..
samkps
post Jul 9 2015, 12:44 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 9 2015, 08:27 AM)
Talking about tunnel, it seem that those cars come from Kajang/Semenyih via Silk Highway seem need to u-turn at Twin Palms tunnel then only can connect to EKVE, I doubt this tunnel can cope.
*
This is a highway, presumebly should have flyover/interchange for cummuting on two sides.. Don't think need to U-turn though..


samkps
post Jul 9 2015, 12:52 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(fahrur_07 @ Jul 9 2015, 09:13 AM)
i"ll try to get the layout if possible
*
Thanks bro.
samkps
post Jul 10 2015, 01:29 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 9 2015, 08:27 AM)
Talking about tunnel, it seem that those cars come from Kajang/Semenyih via Silk Highway seem need to u-turn at Twin Palms tunnel then only can connect to EKVE, I doubt this tunnel can cope.
*
I think the compensation is already factored into the construction cost. Presumebly, highway operator fond to have another highway connecting to them, since it can divert more traffic to them. Next time perhaps twin palm / bukit sungai long residents will use EKVE towards KL as well.

This interchange can serve as the U-turn for Sungai Long folks towards balakong direction as well..
samkps
post Jul 10 2015, 02:07 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(fahrur_07 @ Jul 9 2015, 02:48 PM)
its too far from the access road if the lorry get their sand from red circle
every morning they are using Desa Budiman trunk road to their sand mine site
*
Erm, then not too sure, the distance just merely 1-2km.. looks to me feasible though..
samkps
post Jul 10 2015, 02:51 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 10 2015, 02:34 PM)
Need to pay 2 tolls? one at Mahkota Cheras interchange another at Twin Palms.
*
Sungai Long folks can opt for Mahkota Cheras or Sungai Long interchange, if using sungai long interchange will be highway road.. If using the Mahkota Cheras may need to pass through the taman roads.. Have choice though..


samkps
post Jul 10 2015, 02:51 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 10 2015, 02:37 PM)
Look more like quarry woh, below is the BMC quarry look similar.
*
Quarry only produce stone but no sand? hmm.gif
samkps
post Jul 10 2015, 03:15 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 10 2015, 03:01 PM)
This look like more sand mining than Desa Budiman site.
*
Hmm.. maybe, then why the lorry need to go to desa budiman 6th phase?

When I zoom into the google map, what has been told by bro fahrur before got truth as well, coz already can see a few lories (circled in red) passby that area.. Of course not sure if it used for sand mining or construction..

This post has been edited by samkps: Jul 10 2015, 03:25 PM


Attached thumbnail(s)
Attached Image
samkps
post Jul 10 2015, 10:27 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(danielisme @ Jul 10 2015, 04:51 PM)
Ekve toll booth for sg long look like not located in bandar sg long . Maybe they will place the ekve interchange after silk sg long toll.
*
Yeah, from KL direction, the toll booth should be located after twin palm and before goodview height...
samkps
post Jul 11 2015, 10:15 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(danielisme @ Jul 11 2015, 09:59 AM)
Persiaran Mahkota 1 traffic Jam till jusco now
*
Due to UTARIAN? sweat.gif sweat.gif
samkps
post Jul 12 2015, 11:44 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 11 2015, 05:04 PM)
Langat 2 has started since 2014?
*
Langat 2 already completed 15% as at Nov 2014.. After that due to benefit conflict, should stop already..

http://english.astroawani.com/malaysia-new...completed-49076
samkps
post Jul 12 2015, 12:07 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Jul 12 2015, 11:14 AM)
I saw this signboard at the access road of Vintage seem that Langat 2 is nearer for Vintage than Series Budiman, but I didn't continue to see the progress as the road condition is terrible, wonder if HTC site also there.

BTW is BMC really in Mukim Hulu Langat as per your S&P?
*
If following to the grant of the land in this advertisment, part of the Mahkota cheras land is in Mukim Ulu Langat...

http://www.propertyguru.com.my/property-li...s-south-6316445

9 Pages « < 3 4 5 6 7 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0279sec    1.09    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 01:27 PM