 Ask me anything abt Construction Industry!, Q&A

views
     
jolipoli81
post Jan 7 2016, 12:49 PM

Look at all my blinks
******
Senior Member
1,256 posts

Joined: Mar 2007



Yes, the problem now is I would love to work out the conversion of the kg/m2 to Gauge.
de_ghost
post Jan 10 2016, 08:51 PM

Casual
***
Junior Member
424 posts

Joined: Jul 2011
for new ceiling, do we need to apply sealer or just straight matex can already?
jack3218
post Jan 13 2016, 04:50 PM

Getting Started
**
Junior Member
119 posts

Joined: Nov 2011


Sir, i am curious about my current situation. During Tender my Tender team give a two brand under the schedule of particular and submit the quotaion base on the brand and lastly we manage to get the project and sign LA. But during the brand approval stage, consultant reject the brand that I listed on SOP and ask for etc brand not listed in the SOP during Tender stage. Can a consultant change the brand after award to us and sign LA ?
TSiwubpreve
post Jan 13 2016, 06:04 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(jack3218 @ Jan 13 2016, 04:50 PM)
Sir, i am curious about my current situation. During Tender my Tender team give a two brand under the schedule of particular and submit the quotaion base on the brand and lastly we manage to get the project and sign LA. But during the brand approval stage, consultant reject the brand that I listed on SOP and ask for etc brand not listed in the SOP during Tender stage. Can a consultant change the brand after award to us and sign LA ?
*
they can change the brand and u entitle the variation for that changes.
TSiwubpreve
post Jan 13 2016, 06:08 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(de_ghost @ Jan 10 2016, 08:51 PM)
for new ceiling, do we need to apply sealer or just straight matex can already?
*
sealer require but for ur own home and cost saving, white color emulsion paint straight away la biggrin.gif

like maxlite so cheap.
TSiwubpreve
post Jan 13 2016, 06:09 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(jolipoli81 @ Jan 7 2016, 12:49 PM)
Yes, the problem now is I would love to work out the conversion of the kg/m2 to Gauge.
*
the data spec of that exmet should stated ba
Eng_Tat
post Jan 14 2016, 12:48 AM

Look at all my stars!!
*******
Senior Member
2,215 posts

Joined: Nov 2007
From: Cheras, KL.


hi, what can we do without involving unit upstairs for leaking issue? mould/plastic injection to seal the ceiling? thanks
TSiwubpreve
post Jan 14 2016, 07:41 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Eng_Tat @ Jan 14 2016, 12:48 AM)
hi, what can we do without involving unit upstairs for leaking issue? mould/plastic injection to seal the ceiling? thanks
*
pu grouting injection from downstairs ceiling leaking area
plain21
post Jan 14 2016, 02:01 PM

Getting Started
**
Junior Member
126 posts

Joined: Oct 2012
im a fresh site engineer, how can i establish some kind of connection to make konsikong listen to me? usually they listen, but sometimes got refusal i dono how to react. the reason is they are most of the time older than me, so i dont want to be rude
TSiwubpreve
post Jan 14 2016, 02:38 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(plain21 @ Jan 14 2016, 02:01 PM)
im a fresh site engineer, how can i establish some kind of connection to make konsikong listen to me? usually they listen, but sometimes got refusal i dono how to react. the reason is they are most of the time older than me, so i dont want to be rude
*
u don't have威严
plain21
post Jan 14 2016, 02:50 PM

Getting Started
**
Junior Member
126 posts

Joined: Oct 2012
QUOTE(iwubpreve @ Jan 14 2016, 02:38 PM)
u don't have威严
*
Haha whats that? Google translate as majesty. I dont have leadership isit? Please advise how i can improve

This post has been edited by plain21: Jan 14 2016, 02:51 PM
Perbaman
post Jan 14 2016, 02:59 PM

Getting Started
**
Junior Member
63 posts

Joined: Nov 2011


what's a konsikong? hmm.gif sorry not in construction line
plain21
post Jan 14 2016, 03:06 PM

Getting Started
**
Junior Member
126 posts

Joined: Oct 2012
QUOTE(Perbaman @ Jan 14 2016, 02:59 PM)
what's a konsikong? hmm.gif sorry not in construction line
*
Site workers bro

TSiwubpreve
post Jan 14 2016, 04:22 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Perbaman @ Jan 14 2016, 02:59 PM)
what's a konsikong? hmm.gif sorry not in construction line
*
general worker
TSiwubpreve
post Jan 14 2016, 04:23 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(plain21 @ Jan 14 2016, 02:50 PM)
Haha whats that? Google translate as majesty. I dont have leadership isit? Please advise how i can improve
*
u must confident. and fierce. don't ever belanja them etc.
plain21
post Jan 14 2016, 04:27 PM

Getting Started
**
Junior Member
126 posts

Joined: Oct 2012
QUOTE(iwubpreve @ Jan 14 2016, 04:23 PM)
u must confident. and fierce. don't ever belanja them etc.
*
I see, dont try to be friends.. thank you sir!
TSiwubpreve
post Jan 16 2016, 10:05 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Toyoi @ Jan 15 2016, 01:23 PM)
lots of Ali Baba subcon forced to register with GST n some simply close shop to avoid expose cable

is that good or bad ?
*
bro, what is ur profession? QS, engineer?

well, GST is in fact make the account more transparent no doubt. alibaba meaning middle man that not carry out reall 0 work. example government award to Rashid (who own a company have less than 5 staff), and Rashid award to IJM (main contractor). so IJM will help Rashid do all the job. IJM even use Rashid company cover letter to write letter on behalf of Rashid. this is alibaba. whatever money IJM claim on behalf of Rashid, Rashid take a cut. this is the meaning of alibaba.

of course there are lot of contractor decide to close shop, some is due to complication of GST, some of course yes, it will reveal more thing. other reason is also because of the payment of GST, the time gap hardly meet. cashflow is very important for contractor. so sometimes u have to pay the GST in advance even though u haven't claim back. those are also risk.
TSiwubpreve
post Jan 16 2016, 10:21 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Toyoi @ Jan 15 2016, 01:29 PM)
the tender clause "we have the right not to accept lowest bidder" is a bit funny

it defeat the purpose of open tender n implying the lowest bidder maybe a dupe/not serious

even during post tender result, all the pricing submitted are revealed but not the current financial status of the successful bidder

if the winning bid given to the higher bidder but pokai account, what is the reason he was awarded ?

surely he will subcontract ali baba the project later on right ?
*
I assume u refer to public project. for public project, in term of morality it should be award to lowest bidder because it's people money. this clause "we have the right not to accept lowest bidder" doesn't mean u can award to higher bidder. this clause merely enable u to award to higher bidder with reason. when u award to higher bidder, u have to give the rigid answer to public.

but if u ask my personal opinion, I think no matter what government also should award to lowest bidder. because prior a contractor able to enter the tendering work, they have to pre-qualify themselves that they had meet criteria to tender this project, eg. like they have satisfied the financial capacity required, they have sufficient manpower, they have XX years of experience of etc. once those criteria met, I think there are no much reason not to award to lowest bidder among all qualified contractor.

but of course still got exception, eg. some contractor they bidder slightly higher, but they propose a even shorter duration of project, so why not? eg. a contractor propose 6 months earlier than the lowest bidder at 10 million cost expensive, so this 6 months can generate more than 10million for LRT project, why not? good reason.

to current government, all these clause simply abused by them. not a shocking thing they twist this and that and claimed they comply to contract and done nothing wrong ohmy.gif
TSiwubpreve
post Jan 16 2016, 10:33 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Toyoi @ Jan 15 2016, 01:35 PM)
there should be a limit for one company to given projects

it cannot be only one same company always sapu big projeks with long-term tenure

preferably a company should only be allowed to undertake new project once current project almost completed

imagine one company have 2-3 billions order book and still waiting for another 1-2 billion projects to be awarded

are they really good or simply have an army of Ali baba subcons help them complete the projects?

its time JKR/CIDB should create law anti-monopoly for projects

let us wait how iwubpreve reply to those questions  icon_rolleyes.gif
*
if the open and transparent tender is truly adopted, those company that are fully occupied won't even qualified to tender the work. in fact on paper alibaba is now allow. because u can't sublet the entire project to other contractor in most of the standard form of contract we commonly used. well written in the contract subletting entire project is prohibited.
Perbaman
post Jan 18 2016, 09:24 AM

Getting Started
**
Junior Member
63 posts

Joined: Nov 2011


eh anyone know the lightweight precast concrete one ar?
mostly i see is used as coping at windows, with cantilevered about 150-200mm
is there any such product that is similar, but can cantilever up to 3-4 ft?
i need to put overhang on window, but i really dislike to put the polycarbonate awning bekos it looks awful.
so im thinking to use lightweight concrete instead.. idea bernas or not?
cost-wise, izit expense? any rough figure per foot run?