 LRT 3 route agreed!, LRT 3

views
     
DS4
post Jul 15 2018, 08:15 AM

On my way
****
Senior Member
670 posts

Joined: Aug 2016


Lumi Tropicana station cancelled?
nexona88
post Jul 15 2018, 08:39 AM

The Royal Club Member
*********
All Stars
48,538 posts

Joined: Sep 2014
From: REality
QUOTE(DS4 @ Jul 15 2018, 08:15 AM)
Lumi Tropicana station cancelled?
*
Yup...
See the graphics above..
newsongfashion
post Jul 15 2018, 10:09 PM

Casual
***
Junior Member
315 posts

Joined: Aug 2012
QUOTE(JonathanIB @ Jul 15 2018, 12:42 AM)
U don’t get what I try to say
The station is opposite of dataran prima... across NKVE Highway
*
Yes, I know your question.
There will be a bridge at dataran prima across the highway to the station at Damansara Leganda
JonathanIB
post Jul 16 2018, 08:03 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(newsongfashion @ Jul 15 2018, 10:09 PM)
Yes, I know your question.
There will be a bridge at dataran prima across the highway to the station at Damansara Leganda
*
If still same
That will be great
Thanks
SUSNew Klang
post Jul 16 2018, 09:46 AM

Look at all my stars!!
*******
Senior Member
4,998 posts

Joined: Dec 2010
I just visited the LRT3 official website and saw that Lien Hoe station is between Triven and the highway.

Really?

The small Tropicana road is not designed for cars to drop off/ pick up commuters.
AskarPerang
post Jul 17 2018, 03:17 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



https://www.malaysiakini.com/news/434438

Worried about the LRT3? MOT gives a point-by-point response
Published: 16 Jul 2018, 4:33 pm | Modified: 16 Jul 2018, 5:17 pm


The Transport Ministry today addressed several concerns raised following the cost-cutting measures directed at the Bandar Utama-Klang LRT3 line.

Finance Minister Lim Guan Eng had last week announced that the LRT3 project would be scaled back, slashing the cost from RM31.65 billion to RM16.63 billion.

The Transport Ministry, in a statement today, stressed that the need to reduce the size of the stations and train capacity was due to Prasarana Malaysia's management ordering for specifications being "well above the necessary requirements".

This had resulted in Prasarana requesting for further RM20 billion in funding, up from the initially approved RM10 billion in 2015.

Below are a list of concerns and the Transport Ministry's responses.

Q: Isn't reducing from 42 six-car trains to 22 three-car trains unreasonable in a crowded place like Klang Valley?

The revised specification of 22 sets of three-car trains is more than sufficient to cater for the current ridership demand.

During peak hours the forecast maximum number of passengers per hour per direction is 6,185 in 2034.

This ridership can be accommodated by 22 three-car trains, which can carry 6,210 passengers per hour per direction.

Subsequently, additional three-car trains can be purchased to increase capacity to meet ridership beyond 2050. The stations can cater for up to four-car trains.

The LRT3 system’s design can be upgraded from the present interval of six minutes to the shortest interval of two minutes, and accommodate ridership of up to 18,630 passengers per hour per direction during peak hour, which is approximately 7,000 passengers higher than the projected demand of 11,584 passengers per hour per direction in 2050.

Q: Isn't a six-car train more comfortable compared to two-car trains along the Kelana Jaya LRT line?

International standards allow for between 6 and 8 passengers per meter square. At all times, the passenger loading will be below 6 passengers per meter square.

Q: Will there be enough trains on standby in the event of breakdowns?

The total number of 22 train-sets include provision for two train sets being under maintenance, and one train set on standby, which is in accordance with international standards.

Subsequent purchasing will include a similar provision.

Q: Are you just trying to save cost and ignoring future commuter growth?

The current stations will be built to cater for four-car train sets, which will be capable of catering for the ridership beyond 2050.

Similarly, the platform and concourse sizing will accommodate passenger flows beyond 2050.

The train stations should be designed to cater to the actual projected demand of passenger load, and not succumb to unrealistic demands that cause cost escalation.

Q: Why are you cutting the number of stations?

The provisional stations are Lien Hoe, Temasya, Persiaran Hishamuddin, Sirim, Bukit Raja and Bandar Botanic.

The projected ridership for all these stations is below 1,500 passengers per day per station in 2020.

However, these stations will be built up progressively as ridership and demand increases.

In addition, the station redesign and facilities to be provided are benchmarked against existing LRT stations for the Kelana Jaya line and is more than sufficient to cater to the projected ridership.
peri peri
post Jul 17 2018, 04:01 PM

10k nonsense talkative club
********
All Stars
11,943 posts

Joined: Mar 2012
From: Kuala Lumpur



» Click to show Spoiler - click again to hide... «


Very rational response from our MOF. Our beloved Malaysia got hope

nexona88
post Aug 7 2018, 06:50 PM

The Royal Club Member
*********
All Stars
48,538 posts

Joined: Sep 2014
From: REality
Govt to continue LRT3 and won’t retender...

Terminating MRCB-George Kent as LRT3 PDP would have cost govt RM4.2b, says LGE

http://www.theedgemarkets.com/article/term...-rm42b-says-lim
tikusniaga
post Aug 8 2018, 02:37 AM

Look at all my stars!!
*******
Senior Member
2,020 posts

Joined: Oct 2006
Clever MRCB and George Kent, they hooked LRT3 and now is secure.
BEANCOUNTER
post Aug 8 2018, 10:00 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(tikusniaga @ Aug 8 2018, 02:37 AM)
Clever MRCB and George Kent, they hooked LRT3 and now is secure.
*
no leh…

when you need to pay big bag of brown envelope, of course you need a water tight contract.
nexona88
post Nov 5 2018, 05:04 PM

The Royal Club Member
*********
All Stars
48,538 posts

Joined: Sep 2014
From: REality
https://www.malaymail.com/s/1690217/mrcb-ge...d-price-of-rm11

Confirmed.. LRT 3 project goes on as usual with lower cost..
mangoproperty
post Nov 5 2018, 05:54 PM

Enthusiast
*****
Senior Member
797 posts

Joined: Oct 2015
QUOTE(nexona88 @ Nov 5 2018, 05:04 PM)
https://www.malaymail.com/s/1690217/mrcb-ge...d-price-of-rm11

Confirmed.. LRT 3 project goes on as usual with lower cost..
*
The initial 5 stations that was cancelled are returned ?
nexona88
post Nov 5 2018, 06:02 PM

The Royal Club Member
*********
All Stars
48,538 posts

Joined: Sep 2014
From: REality
QUOTE(mangoproperty @ Nov 5 2018, 05:54 PM)
The initial 5 stations that was cancelled are returned ?
*
Nope..
If maintained.. Cost sure more than 16bil 😈
adren1
post Nov 5 2018, 06:19 PM

Getting Started
**
Junior Member
137 posts

Joined: Nov 2008
so now can travel to dataran prima lrt instead of that stupid kelana jaya lrt station biggrin.gif
BEANCOUNTER
post Nov 5 2018, 07:11 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(adren1 @ Nov 5 2018, 06:19 PM)
so now can travel to dataran prima lrt instead of that stupid kelana jaya lrt station biggrin.gif
*
Why kj station stupid?

Where is the connecting from lrt3 to lrt1?
Babizz
post Nov 5 2018, 07:39 PM

10k Club
********
All Stars
12,528 posts

Joined: Feb 2013
glenmarie is the connection station. takes 5 years still to complete.
mangoproperty
post Nov 5 2018, 09:44 PM

Enthusiast
*****
Senior Member
797 posts

Joined: Oct 2015
QUOTE(nexona88 @ Nov 5 2018, 06:02 PM)
Nope..
If maintained.. Cost sure more than 16bil 😈
*
How much does it cost to build one station?
BEANCOUNTER
post Nov 5 2018, 09:52 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(Babizz @ Nov 5 2018, 07:39 PM)
glenmarie is the connection station. takes 5 years still to complete.
*
Tqtq.....

Panorama hoisei jor...
nexona88
post Nov 5 2018, 10:24 PM

The Royal Club Member
*********
All Stars
48,538 posts

Joined: Sep 2014
From: REality
QUOTE(mangoproperty @ Nov 5 2018, 09:44 PM)
How much does it cost to build one station?
*
how do I know blink.gif
not I'm getting the contract to build it brows.gif
p90
post Nov 5 2018, 10:51 PM

New Member
*
Newbie
11 posts

Joined: Nov 2018
So which is the station plan?