QUOTE(samkps @ May 19 2014, 05:12 PM)
Yes, but heard will have 45 m buffer region. In between will be road and some trees..
From my observation, if STP really have problem, all DSL will be affected (even cluster/SemiD opposite the road), as they are not really far away.
I beg to differ again. I have seen many types of STP. I dont what type Ecoworld is putting in EM and where they are putting.From my observation, if STP really have problem, all DSL will be affected (even cluster/SemiD opposite the road), as they are not really far away.
Lets visit Setia Alam as an example. The STP is located at the most southern tip of Precinct 6. This STP probably serving several precints such as 6, 7 and 8. The seperation is about 60-80 meter (maybe more or less). What are there in the 60-80 meter...
1. there are 4 lanes tarmac road and divider,
2.follow by shoulder of the road,
3. a small stripe of water feature and green plus shoulder or road or
4. the road 2 lanes intenal road and then house...
So far, in the forum, none actually cowpeh about smell or anything from the STP in Setia Alam. I did a measurement in Wikimap for Setia Alam Precinct 8. It is about 80 meter from house to the boundary. THe oxidation ponds are sitting maybe another 30 mete deeper away from the boundary. See map below.....
Owing of all the above, I will think the planner and the masterplan dude would have considered the distance for EM. Perhaps we can expect a separation of 60-80 meter in EM too......If they fail to consider this, go find the fella and knock his damn head...until