Welcome Guest ( Log In | Register )

133 Pages « < 31 32 33 34 35 > » Bottom

Outline · [ Standard ] · Linear+

Investment SUNWAY BELFIELD RESIDENCE KUALA LUMPUR, Sunway gearing up for 2020 New Launch

views
     
Hunakadoo
post Jan 16 2021, 05:19 PM

Call me Gold Man !
*******
Senior Member
2,494 posts

Joined: Feb 2009
From: Kuala Lumpur Dataran Merdeka



QUOTE(AskarPerang @ Jan 10 2021, 10:28 AM)

*
no more pnb 118 view
ZackQ
post Jan 16 2021, 06:43 PM

Casual
***
Junior Member
325 posts

Joined: Apr 2015
QUOTE(Hunakadoo @ Jan 16 2021, 05:19 PM)
no more pnb 118 view
*
Known unknown. I think most of the buyers are aware of the 118 view will be block in future if the front land plot develop with high-rise
DragonReine
post Jan 16 2021, 07:34 PM

just another dog on the Internet
*******
Senior Member
2,610 posts

Joined: Aug 2011
Saw an advert that this place fengshui very ong 😂 Is this true? any fengshui fans can comment

This post has been edited by DragonReine: Jan 16 2021, 07:35 PM
plouffle0789
post Jan 16 2021, 10:56 PM

Regular
******
Senior Member
1,833 posts

Joined: May 2010

QUOTE(VOLVOFORLIFE @ Sep 19 2020, 02:58 PM)
Yup with surrounding new project already above 1kpsf. Would PNb118 be the next KL icon? Yes for sure!
*
Why price so cheap?
propertyowner
post Jan 17 2021, 03:14 PM

Look at all my stars!!
*******
Senior Member
2,566 posts

Joined: Oct 2017
Attached Image

Attached Image

After revisit the site last week, found that:

1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance)
2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small
3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor)
4. Even phase 2 (Block 3) is in pilling stage now, which is good
5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet
6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment

This post has been edited by propertyowner: Jan 17 2021, 03:27 PM
propertyowner
post Jan 17 2021, 03:40 PM

Look at all my stars!!
*******
Senior Member
2,566 posts

Joined: Oct 2017
QUOTE(plouffle0789 @ Jan 16 2021, 10:56 PM)
Why price so cheap?
*
Will you consider to buy if someone sell you 788sqft, 1 cp at lvl 8, at 700k+ upon VP?
ZackQ
post Jan 17 2021, 05:09 PM

Casual
***
Junior Member
325 posts

Joined: Apr 2015
QUOTE(plouffle0789 @ Jan 16 2021, 10:56 PM)
Why price so cheap?
*
Something fishy lo
ryan@chua
post Jan 17 2021, 05:27 PM

Look at all my stars!!
*******
Senior Member
2,165 posts

Joined: Jul 2013
QUOTE(propertyowner @ Jan 17 2021, 04:40 PM)
Will you consider to buy if someone sell you 788sqft, 1 cp at lvl 8, at 700k+ upon VP?
*
Can buy opus already
Better location
VOLVOFORLIFE
post Jan 17 2021, 05:30 PM

Casual
***
Junior Member
358 posts

Joined: Nov 2013


2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo.

QUOTE(propertyowner @ Jan 17 2021, 03:14 PM)
Attached Image

Attached Image

After revisit the site last week, found that:

1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance)
2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small
3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor)
4. Even phase 2 (Block 3) is in pilling stage now, which is good
5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet
6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment
*
This post has been edited by VOLVOFORLIFE: Jan 17 2021, 05:33 PM
surf-it
post Jan 17 2021, 05:42 PM

Landlord
******
Senior Member
1,747 posts

Joined: May 2005
From: Malaysia
QUOTE(plouffle0789 @ Jan 16 2021, 10:56 PM)
Why price so cheap?
*
Because blocked view will be covering up to 270 degrees... especially this block
propertyowner
post Jan 17 2021, 05:43 PM

Look at all my stars!!
*******
Senior Member
2,566 posts

Joined: Oct 2017
QUOTE(VOLVOFORLIFE @ Jan 17 2021, 05:30 PM)
2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo.
*
Yes you're right. 2a for groundwork & 2b on the structural As believe most investors were quoted 30% DP and that will all happen in this same year (lower floors). Suncon as maincon is always fast, they can complete tall buildings in just 3 years. Cheers

This post has been edited by propertyowner: Jan 17 2021, 07:24 PM
Babizz
post Jan 17 2021, 06:50 PM

10k Club
********
All Stars
12,528 posts

Joined: Feb 2013
QUOTE(propertyowner @ Jan 17 2021, 01:14 AM)
After revisit the site last week, found that:

1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance)
2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small
3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor)
4. Even phase 2 (Block 3) is in pilling stage now, which is good
5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet
6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment
*
Thanks for the pics. Anyone purchasing facing the Istana have to do some level of soundproofing themselves.

Can share more the tunnel being walkable to MRT station?? Heavy supply is expected here but no news from the other developers yet. A lot of the development order is approved sometime back but no progress.
gks
post Jan 17 2021, 07:06 PM

Look at all my stars!!
*******
Senior Member
3,834 posts

Joined: May 2008
QUOTE(propertyowner @ Jan 17 2021, 03:14 PM)
Attached Image

Attached Image

After revisit the site last week, found that:

1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance)
2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small
3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor)
4. Even phase 2 (Block 3) is in pilling stage now, which is good
5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet
6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment
*
For item 5, u mean the Belfield tunnel? I asked for the detail but Sunway SA couldn't provide the detail. The question is not only where it ends but where does it starts? And whether resident of Sunway Belfields have direct access on the tunnel?

ZackQ
post Jan 18 2021, 09:38 AM

Casual
***
Junior Member
325 posts

Joined: Apr 2015
come on guys, even the walkway to monorail station is not covered, why blow until the tunnel is "walkable" to MRT station?
ZackQ
post Jan 18 2021, 09:41 AM

Casual
***
Junior Member
325 posts

Joined: Apr 2015
QUOTE(VOLVOFORLIFE @ Jan 17 2021, 05:30 PM)
2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo.
*
Well, if the students in KC1 have no complaints and KC1 considered one of the "top" primary SJKC in KV, noise/air pollution still at acceptable level perhaps?
Lucky_Wishes
post Jan 18 2021, 10:08 AM

Getting Started
**
Junior Member
102 posts

Joined: Feb 2011


Yes, SA told me no direct access to the Belfield tunnel.
Lucky_Wishes
post Jan 18 2021, 10:15 AM

Getting Started
**
Junior Member
102 posts

Joined: Feb 2011


i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me.
gks
post Jan 18 2021, 10:16 AM

Look at all my stars!!
*******
Senior Member
3,834 posts

Joined: May 2008
QUOTE(Lucky_Wishes @ Jan 18 2021, 10:08 AM)
Yes, SA told me no direct access to the Belfield tunnel.
*
+1

Fat3Twister
post Jan 18 2021, 10:19 AM

Regular
******
Senior Member
1,559 posts

Joined: Apr 2007


QUOTE(Lucky_Wishes @ Jan 18 2021, 10:15 AM)
i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me.
*
Agree, definitely walkable. walkable distance depends on individual. Those who stay in PPR, flats even walk 1-2km to the station, but i don't see people staying in 700-800k condo or paying 3-4k rental see 1km as a walkable distance on a daily basis.
gks
post Jan 18 2021, 10:22 AM

Look at all my stars!!
*******
Senior Member
3,834 posts

Joined: May 2008
QUOTE(Lucky_Wishes @ Jan 18 2021, 10:15 AM)
i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me.
*
From investment POV, the distance and walking condition depends on the rental demanded and budget. If the rental rm1500+/-, tenants are ok to walk. However if min rental in Belfield is Rm2500 where tenants will have min salary rm15k onwards, 900m current walking condition wouldnt be selling point for them.

133 Pages « < 31 32 33 34 35 > » Top
 

Change to:
| Lo-Fi Version
0.0377sec    0.51    6 queries    GZIP Disabled
Time is now: 13th December 2025 - 04:05 AM