QUOTE(AskarPerang @ Jan 10 2021, 10:28 AM)
no more pnb 118 viewInvestment SUNWAY BELFIELD RESIDENCE KUALA LUMPUR, Sunway gearing up for 2020 New Launch
Investment SUNWAY BELFIELD RESIDENCE KUALA LUMPUR, Sunway gearing up for 2020 New Launch
|
|
Jan 16 2021, 05:19 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,494 posts Joined: Feb 2009 From: Kuala Lumpur Dataran Merdeka |
|
|
|
|
|
|
Jan 16 2021, 06:43 PM
Show posts by this member only | IPv6 | Post
#642
|
![]() ![]() ![]()
Junior Member
325 posts Joined: Apr 2015 |
|
|
|
Jan 16 2021, 07:34 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,610 posts Joined: Aug 2011 |
Saw an advert that this place fengshui very ong 😂 Is this true? any fengshui fans can comment
This post has been edited by DragonReine: Jan 16 2021, 07:35 PM |
|
|
Jan 16 2021, 10:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,833 posts Joined: May 2010 |
|
|
|
Jan 17 2021, 03:14 PM
Show posts by this member only | IPv6 | Post
#645
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,566 posts Joined: Oct 2017 |
After revisit the site last week, found that: 1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance) 2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small 3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor) 4. Even phase 2 (Block 3) is in pilling stage now, which is good 5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet 6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment This post has been edited by propertyowner: Jan 17 2021, 03:27 PM |
|
|
Jan 17 2021, 03:40 PM
Show posts by this member only | IPv6 | Post
#646
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,566 posts Joined: Oct 2017 |
|
|
|
|
|
|
Jan 17 2021, 05:09 PM
Show posts by this member only | IPv6 | Post
#647
|
![]() ![]() ![]()
Junior Member
325 posts Joined: Apr 2015 |
|
|
|
Jan 17 2021, 05:27 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,165 posts Joined: Jul 2013 |
|
|
|
Jan 17 2021, 05:30 PM
Show posts by this member only | IPv6 | Post
#649
|
![]() ![]() ![]()
Junior Member
358 posts Joined: Nov 2013 |
2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo.
QUOTE(propertyowner @ Jan 17 2021, 03:14 PM) After revisit the site last week, found that: 1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance) 2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small 3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor) 4. Even phase 2 (Block 3) is in pilling stage now, which is good 5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet 6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment |
|
|
Jan 17 2021, 05:42 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,747 posts Joined: May 2005 From: Malaysia |
|
|
|
Jan 17 2021, 05:43 PM
Show posts by this member only | IPv6 | Post
#651
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,566 posts Joined: Oct 2017 |
QUOTE(VOLVOFORLIFE @ Jan 17 2021, 05:30 PM) 2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo. Yes you're right. 2a for groundwork & 2b on the structural As believe most investors were quoted 30% DP and that will all happen in this same year (lower floors). Suncon as maincon is always fast, they can complete tall buildings in just 3 years. CheersThis post has been edited by propertyowner: Jan 17 2021, 07:24 PM VOLVOFORLIFE liked this post
|
|
|
Jan 17 2021, 06:50 PM
Show posts by this member only | IPv6 | Post
#652
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,528 posts Joined: Feb 2013 |
QUOTE(propertyowner @ Jan 17 2021, 01:14 AM) After revisit the site last week, found that: Thanks for the pics. Anyone purchasing facing the Istana have to do some level of soundproofing themselves. 1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance) 2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small 3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor) 4. Even phase 2 (Block 3) is in pilling stage now, which is good 5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet 6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment Can share more the tunnel being walkable to MRT station?? Heavy supply is expected here but no news from the other developers yet. A lot of the development order is approved sometime back but no progress. |
|
|
Jan 17 2021, 07:06 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,834 posts Joined: May 2008 |
QUOTE(propertyowner @ Jan 17 2021, 03:14 PM) After revisit the site last week, found that: 1. Inevitable noise/air pollution as istana facing the 24/7 busy main roads (judge from the distance) 2. Block 1 & 2 are quite close to each others, which also mean the facilities podium is quite small 3. Progress seems fast for the pocket development, will draw down 2(A) pretty soon somewhere in Q2 2021 (on lower floor) 4. Even phase 2 (Block 3) is in pilling stage now, which is good 5. Hearsay the tunnel is "walkable" to MRT station, which I can't imagine how yet 6. Things might turn out abit "congested" for sharing the same access. As there will be 8 blocks altogether by just adding Salcon alone, hopefully it doesn't turn out like the case for jln ampang, whereby the density ruins the investment |
|
|
|
|
|
Jan 18 2021, 09:38 AM
|
![]() ![]() ![]()
Junior Member
325 posts Joined: Apr 2015 |
come on guys, even the walkway to monorail station is not covered, why blow until the tunnel is "walkable" to MRT station?
|
|
|
Jan 18 2021, 09:41 AM
|
![]() ![]() ![]()
Junior Member
325 posts Joined: Apr 2015 |
QUOTE(VOLVOFORLIFE @ Jan 17 2021, 05:30 PM) 2a should relates to all ground works that include the building foundation. Hence, the billing should apply to all regardless of level? Probably referring to 2b then, where lower flor unit will have earlier billing. Nevertheless, this is super fast. Thanks for sharing the progress photo. Well, if the students in KC1 have no complaints and KC1 considered one of the "top" primary SJKC in KV, noise/air pollution still at acceptable level perhaps? |
|
|
Jan 18 2021, 10:08 AM
|
![]() ![]()
Junior Member
102 posts Joined: Feb 2011 |
Yes, SA told me no direct access to the Belfield tunnel.
|
|
|
Jan 18 2021, 10:15 AM
|
![]() ![]()
Junior Member
102 posts Joined: Feb 2011 |
i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me.
|
|
|
Jan 18 2021, 10:16 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,834 posts Joined: May 2008 |
|
|
|
Jan 18 2021, 10:19 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,559 posts Joined: Apr 2007 |
QUOTE(Lucky_Wishes @ Jan 18 2021, 10:15 AM) i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me. Agree, definitely walkable. walkable distance depends on individual. Those who stay in PPR, flats even walk 1-2km to the station, but i don't see people staying in 700-800k condo or paying 3-4k rental see 1km as a walkable distance on a daily basis. |
|
|
Jan 18 2021, 10:22 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,834 posts Joined: May 2008 |
QUOTE(Lucky_Wishes @ Jan 18 2021, 10:15 AM) i tried to walk from the construction site to Pasar Seni MRT, around 900meters, think is a walkable distance for me. From investment POV, the distance and walking condition depends on the rental demanded and budget. If the rental rm1500+/-, tenants are ok to walk. However if min rental in Belfield is Rm2500 where tenants will have min salary rm15k onwards, 900m current walking condition wouldnt be selling point for them. |
| Change to: | 0.0377sec
0.51
6 queries
GZIP Disabled
Time is now: 13th December 2025 - 04:05 AM |