Welcome Guest ( Log In | Register )

4 Pages < 1 2 3 4 >Bottom

Outline · [ Standard ] · Linear+

 Ken Rimba New Green Township, [Sponsored]

views
     
noproblem
post Aug 9 2013, 07:36 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(Jctan @ Aug 8 2013, 10:34 PM)
Which row your r in?
*
2. The renovation house is 1st row from guard house, turn left.
noproblem
post Aug 20 2013, 11:48 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(stevenkkt @ Aug 20 2013, 10:31 AM)
The last time I checked with them, one unit entitle to 8 access cards. One card is RM50 (or RM100 I forgot)... Not sure about stickers. I will go to verify defects that have been fixed this weekend. Maybe I will go ask about the stickers. smile.gif
*
One card is RM50 up to 4-5 cards. The remaining cards charge us RM125 per card. Total is 8 cards.
noproblem
post Aug 20 2013, 11:51 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(Vampyr3 @ Aug 20 2013, 11:36 AM)
Quick question yah, do they give us a few cards FOC and if we need more, we'll pay RM50 for each additional ones? Or is it rm50 per card right off the bat? Pretty expensive though.....

Mind sharing what are the defects you found in your house so we may pay more attention to it when it's our turn to check? I asked the SA on what will be included in the repairs but he just mentioned to write down any defect and they'll look at it. So if I write down minor stuff like paint not consistent, sink stains etc, will they look at it? hahaha

Thanks!
*
Yes we need to pay each card deposit fees (RM50, the fifth card or above will charge processing fees - RM75). If you don't need so many cards & return the card can get back your deposit (RM50).
noproblem
post Aug 20 2013, 02:15 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Aug 20 2013, 01:25 PM)
that mean....if i need 4 cards...i hv to pay rm200?
*
Yes exactly. smile.gif
noproblem
post Aug 22 2013, 01:29 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(forever1979 @ Aug 22 2013, 09:41 AM)
Then why from I Property, still some agents advertised for RM520K for Ken Rimba.
Maybe they just want to con (or convince) the owner to sell below market price.
*
Iproperty totally cannot trust. They advertise this price, when you call in the agent will say no more available. The adv will be there even IT IS SOLD or this is trick to get you call them.
noproblem
post Sep 2 2013, 04:36 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(forever1979 @ Sep 2 2013, 03:59 PM)
I think when first purchaser bought it, the price is near to RM900K for the corner unit.
*
I think he referring to end lot, not cornet lot with swimming pool.
noproblem
post Sep 3 2013, 01:22 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Sep 3 2013, 12:37 PM)
any1 here hv reno u kitchen? estimate range......how much.....normal design
*
Fully extend kitchen... concrete top... around 20k (not include tiles)...
noproblem
post Sep 3 2013, 04:59 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Sep 3 2013, 01:27 PM)
how about kitchen cabinet? no extend.....
*
kitchen cabinet depend on your material and accessories (soft close, etc). The price is variant.
noproblem
post Sep 4 2013, 01:48 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Sep 4 2013, 11:56 AM)
tq very much 4 u info.....just wanna to know if i do same.... like legian show house kitchen cabinet.....how much is it? between 7k to 10k?
*
Legian show house used solid surface, shinning cabinet doors (better than average quality), etc, the size is about 8 ft x 6 ft (not include island), my guess is about 10k+- not include hood & cookers.
noproblem
post Sep 6 2013, 10:46 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(yoong81 @ Sep 6 2013, 10:26 AM)
According to the star, federal highway near sg rasau toll was flooded yest.

http://www.thestar.com.my/News/Nation/2013...eaks-havoc.aspx

although ken rimba was not flooded, but maybe the access road was flooded.

anyone going in/out might experience jam.
can anyone confirm this?
*
Access road from Puspakom to Ken Rimba still ok, some shops got flooded but road still can drive through...
noproblem
post Sep 20 2013, 01:48 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
Anybody build balcony at their 2nd or 3rd room? What are procedures?
noproblem
post Sep 23 2013, 10:48 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(crazykiller @ Sep 22 2013, 12:58 PM)
Izit abit weird if build it at 2nd / 3rd room as its facing behind neighbor or kitchen .... hahaha...

Just curious only la.... ^^  tongue.gif
*
yeah but need to fully utilize the space. smile.gif
noproblem
post Oct 1 2013, 07:59 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
Can introduce what kind of grill iron your guys using for ken rimba? How many mm?

This post has been edited by noproblem: Oct 1 2013, 09:03 AM
noproblem
post Oct 7 2013, 12:33 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 5 2013, 11:02 PM)
I'm planning to extend my kitchen soon too.
Did anyone extend and use the 4 feet extra to be a wet kitchen? Or did u guys break the wall entirely and use as one big kitchen with wet/dry kitchen combined?
Just worried about the smoke going into living hall if I dun separate the wet from the dry.
Appreciate all advice, thanks!
*
Break it. Make wet kitchen 8 feet and dry kitchen 7 feet (use sliding door for partition). Install hob in wet kitchen.
noproblem
post Oct 8 2013, 11:39 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 7 2013, 07:17 PM)
It's a good idea. But just worried about the cost. Installing a glass sliding door that size should cost quite a bit.

Have u done urs already? Mind to share how much it costs u?
*
yes did it. Full extension about 20k, sliding door 2.6k++.
noproblem
post Oct 8 2013, 07:42 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(joeec @ Oct 8 2013, 06:03 PM)
Thank for info!
Wow that costs quite a bit. 20k is just to extend downstairs, or it includes upstairs as well?
*
Downstairs, not include tiles cost.
noproblem
post Oct 10 2013, 08:31 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(vivalegian @ Oct 10 2013, 03:28 PM)
hi friends....any1 here knows...how long the access card will be done after registered?
*
Usually 5 working days or 1 week.
noproblem
post Oct 22 2013, 01:46 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(max2k @ Oct 17 2013, 02:12 PM)
Is those students still renting the place there ?  Does flood still happen  at the junction ?
*
new vehicle policy implemented. each house only have max 3 cars and 2 motorcycles. you will know how much impact to student house cause most of them driving motor.
noproblem
post Oct 23 2013, 01:54 PM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(stevenkkt @ Oct 22 2013, 08:45 PM)
I think this is a good move... sooner or later these students will be fed up with these policies & will move away. I hope this happens sooner. smile.gif
*
Yeah but I think it should be flexible allow 5 vehicles (doesn't matter car/motor/van/etc).
noproblem
post Oct 30 2013, 11:08 AM

Getting Started
**
Junior Member
173 posts

Joined: Jun 2006
QUOTE(Jctan @ Oct 29 2013, 10:34 PM)
Hey guys, usually how long mgmt will take if just minor defect rectification? Today i went to mgmt office to submit form and ask for renovation procedure, the indian gal told me if extension kitchen till green fench no MBSA required. She say the mgmt gotten the approval dy and this is within their guideline also. Is it true? Anyone extend the kitchen without MBSA?
*
Kitchen extension need to apply permit from MBSA, it just few hours work if you know how to fill up.
I never saw Indian gal before. I think she just join.

4 Pages < 1 2 3 4 >Top
 

Change to:
| Lo-Fi Version
0.0456sec    0.50    7 queries    GZIP Disabled
Time is now: 15th December 2025 - 09:36 PM