Welcome Guest ( Log In | Register )

6 Pages  1 2 3 > » Bottom

Outline · [ Standard ] · Linear+

Investment ANJALI NORTH KIARA [OWNERS' THREAD], A Divine Sanctuary Ready to Rock

views
     
djvixx
post May 5 2016, 09:45 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(Sunflower901022 @ May 4 2016, 11:27 PM)
I'm interested in this project too...but all agents also told me already sold out...
*
I know someone inside. If you are seriously interested I can ask. Size?!
djvixx
post May 7 2016, 11:45 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Been noticed block A progress is quite slow. Hope that's not due to unsold units, should be no impact to overall progress of whole project.
djvixx
post May 20 2016, 09:51 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Already withdrawn more than 40% from the bank.
They would need another six month for partial furniture installation. Doubt it they can complete it by mid 2017.
djvixx
post May 21 2016, 10:46 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Does anyone know when the Jalan segambut will expand the roads and the new petrol station will complete?
djvixx
post May 31 2016, 10:18 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Now we have to depend on ABD selfie on the building progress rather than Tago's. No official May update yet.
djvixx
post Jun 15 2016, 05:48 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Anyone affected by recent BR rate review from PBB and HLB?
djvixx
post Jun 16 2016, 11:42 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(shioks @ Jun 16 2016, 11:16 AM)
Dropped by showroom.  Was told more than 90% sold.  Remaining units are the larger units.  Villa only 3 out of 26 units sold.

Completion to be mid 2017.
*
When I looked at it for the first time. Villa wouldn't be the popular choice. Could get better villa with that $$. Perhaps even scenaria super link.

This post has been edited by djvixx: Jun 16 2016, 11:44 PM
djvixx
post Jun 20 2016, 06:09 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Someone could ask the developer. 😬
djvixx
post Jul 16 2016, 08:13 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Could be bumi lots releasing. Visit the sales gallery or call developer to get more details.
djvixx
post Jul 18 2016, 06:04 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Last week. Attached Image Attached Image


Attached thumbnail(s)
Attached Image Attached Image
djvixx
post Jul 18 2016, 06:07 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(huzza @ Jul 18 2016, 11:19 AM)
When I was there last week, SA told me there are 2x 1306sqft units left...
*
Which blocks are they ?
djvixx
post Jul 19 2016, 08:04 AM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(Balaclava @ Jul 19 2016, 08:01 AM)
thanks fam. might just be putting down deposit this weekend.  rclxms.gif
*
Nice. Abs which floor of small units still available ? Bumi released units ?
djvixx
post Jul 24 2016, 12:58 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Anyone else got withdrawn for wiring, plumping and roofing ? And I don't see that happening to actual structure. 😑
djvixx
post Jul 24 2016, 10:20 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(A.B.D. @ Jul 24 2016, 05:49 PM)
Yes. Wiring can be seen, it is like example below. For plumbing can see pipes at the bathroom below your unit. Roofing should be your unit's ceiling. What i am scratching head is window and door frames, i cannot see any window frame installed at my unit, unless i got the definition wrong.

Example from May 2016, lower floor, can see wiring.
*
It also mentioned gas piping.
I am sure we are getting the gas piping as well.

djvixx
post Jul 24 2016, 10:22 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(shioks @ Jul 24 2016, 08:36 PM)
[attachmentid=7165506]
*
Nice one. Looking forward to the Petrol station.
djvixx
post Aug 1 2016, 10:21 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(Balaclava @ Aug 1 2016, 08:42 PM)
hello nigguhs. paid liao booking 5k last week. took the 1300 sqft unit heh.
*
Nice. Which block and floor ?
djvixx
post Aug 1 2016, 10:35 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Latest monthly updates should feature some internal proceedings. P
djvixx
post Aug 25 2016, 06:01 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
QUOTE(A.B.D. @ Aug 25 2016, 03:33 PM)
Progress photos @ 25 Aug 16. Block C & D being painted, window frames being installed, zoom in for details  smile.gif

[attachmentid=7388726][attachmentid=7388754][attachmentid=7389694]
[attachmentid=7389674][attachmentid=7389924]

I also saw activity at the Petron station site, the metal door was open and there's a van and digger inside. Hope construction start soon!

[attachmentid=7390047]
*

Nice pictures ABD.
Less than a year to go for VP.
djvixx
post Sep 20 2016, 06:13 PM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
I noticed sales gallery opening hour reviewed and closed on weekends.
Does that mean almost fully sold ?!
djvixx
post Oct 1 2016, 12:31 AM

Casual
***
Junior Member
393 posts

Joined: Dec 2015
Ten months to VP. Can't even recall they had billed me for the frames yet.

6 Pages  1 2 3 > » Top
 

Change to:
| Lo-Fi Version
0.0491sec    1.14    7 queries    GZIP Disabled
Time is now: 19th December 2025 - 01:11 AM