the piping got covered.....
This post has been edited by ahnicnic: Mar 18 2014, 12:49 PM
Casa green condo seri minang
|
|
Mar 18 2014, 12:43 PM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
|
|
|
|
|
|
Mar 19 2014, 05:04 PM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
|
|
|
Mar 19 2014, 06:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
dun worry on that..should be ok geh...
nic nic update us on the progress on tmr le..10 days once...wuahahahaha |
|
|
Mar 19 2014, 06:46 PM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
QUOTE(adrian0229 @ Mar 19 2014, 06:16 PM) dun worry on that..should be ok geh... yalo, now worry also no use... hehe....nic nic update us on the progress on tmr le..10 days once...wuahahahaha u already updated d progress pic 2 days ago mar..... i think d progress not much la weh... |
|
|
Mar 19 2014, 06:47 PM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
|
|
|
Mar 23 2014, 12:53 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
Talk bout white piping...I doubt it will b covered...
The previous project from amber,the one beside cheras lrt...also hv pretty similar design with the piping outside the balcony without any cover... But to clarify on this matter, someone need to ask developer to get 100% answer |
|
|
|
|
|
Mar 23 2014, 01:41 PM
|
![]() ![]() ![]() ![]()
Junior Member
527 posts Joined: Dec 2007 |
QUOTE(adrian0229 @ Mar 23 2014, 12:53 PM) Talk bout white piping...I doubt it will b covered... From the drawings, it is very obvious that it will be covered...The previous project from amber,the one beside cheras lrt...also hv pretty similar design with the piping outside the balcony without any cover... But to clarify on this matter, someone need to ask developer to get 100% answer by the way..the contractor for puteri project and this 1 is very different dude.. ur cant compare directly~~hopefully they are not lousy ones~~ on the contract side.... i do not have the S&P agreement with me now..cant make reference~~ but if it is included in the drawings of the S&P but they dun build it...i means we can take legal action against the developer~~for not fulfilling the contract~~simple as that... |
|
|
Mar 24 2014, 09:15 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
» Click to show Spoiler - click again to hide... « if casa become like this, i |
|
|
Mar 24 2014, 10:20 AM
|
![]() ![]()
Junior Member
76 posts Joined: Nov 2009 |
|
|
|
Mar 24 2014, 11:52 AM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
|
|
|
Mar 25 2014, 09:02 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
|
|
|
Mar 25 2014, 09:24 AM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
|
|
|
Mar 25 2014, 09:36 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
hopefully can reach 10 floor by end of the month...
|
|
|
|
|
|
Mar 29 2014, 09:35 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
10th floor now..
Today managed talk to contractor at there..according to him, the white piping will be covered..so nonid yo worry on it... Oh ya...they will concentrate on block A 1st...block B will start progress after block A completed |
|
|
Mar 30 2014, 09:08 AM
|
![]() ![]() ![]()
Junior Member
367 posts Joined: Dec 2010 |
QUOTE(adrian0229 @ Mar 29 2014, 09:35 PM) 10th floor now.. it seems like the progress is going well, tq adrian kor!!Today managed talk to contractor at there..according to him, the white piping will be covered..so nonid yo worry on it... Oh ya...they will concentrate on block A 1st...block B will start progress after block A completed but did u ask if there will be separate vp date? btw, juz noticed that the total post of this thread reduced from 930 to 845, what happened? even the last post from I Really Need Answer also cannot appear for read? |
|
|
Mar 30 2014, 11:27 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
He did mentioned supposed to be vp tgt on mid of 2015 around june n may...block a expected will reach top lvl on july while block b on feb 2015
|
|
|
Mar 30 2014, 09:29 PM
|
![]() ![]()
Junior Member
274 posts Joined: Apr 2008 |
» Click to show Spoiler - click again to hide... « as adrian kor mentioned, 10th floor now and the piping start covered...... This post has been edited by ahnicnic: Mar 30 2014, 09:29 PM |
|
|
Mar 30 2014, 10:31 PM
Show posts by this member only | IPv6 | Post
#838
|
![]() ![]() ![]()
Junior Member
367 posts Joined: Dec 2010 |
|
|
|
Mar 30 2014, 11:41 PM
|
![]() ![]() ![]()
Junior Member
486 posts Joined: Jun 2009 |
|
|
|
Mar 31 2014, 04:28 PM
|
![]() ![]() ![]()
Junior Member
367 posts Joined: Dec 2010 |
|
| Change to: | 0.0350sec
0.79
6 queries
GZIP Disabled
Time is now: 19th December 2025 - 12:55 AM |