QUOTE(Icehart @ Jul 8 2012, 12:52 PM)
Actually why LDP want to extend the lane to 3 lanes for the bridge on the way to Sunway and then only contraction to 2 lanes in the middle of the bridge? What is the purpose?
there's no 3 lanes bridge to Sunway.The Proposal Under Package 5C
i. Separation of traffic between Petaling Jaya Toll Plaza (at Sunway) and Bandar Puchong Jaya over approximately 3 kilometers
- 2-dedicated and uninterrupted lanes to Putrajaya on the right[
- 2/3-dedicated lanes to other destinations on the left i.e Shah Alam Expressway, Jalan Klang Lama, Lebuhraya Bukit Jalil and Bandar Puchong Jaya
ii. Road in front of Bandar Puchong Jaya towards Putrajaya to be widened from 5-lanes to 8-lanes
iii. The existing bridge and slip road from Puchong to Sunway will also be widened over 500meters
iv. When completed the proposal will replace the existing ongoing contra flow system
source:
http://www.litrak.com.my/page.php?id=23
Jul 9 2012, 08:38 AM

Quote
0.0208sec
0.50
5 queries
GZIP Disabled