Lifting and lowering down of the TBM796 Cutter head at Pudu Launch Shaft.

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
kadiology
post Apr 15 2014, 05:48 PM

Getting Started
**
Junior Member
114 posts

Joined: Feb 2005


kampung, do you have an estimate how many cars going in KL will be reduced with the SBK completion?
TSKampung2005
post Apr 15 2014, 05:50 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(kadiology @ Apr 15 2014, 05:48 PM)
kampung, do you have an estimate how many cars going in KL will be reduced with the SBK completion?
*
Not easy to estimate.

This is because...

1) You need data on projected growth of vehicles entering KL

2) Having said that it is envisaged that the line may carry 400,000 a day in its initial operation in 2017.

Although there is MRT, remember population still grows.
TSKampung2005
post Apr 19 2014, 02:32 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
MyMRT Underground

Link : https://www.facebook.com/mrtunderground

user posted image
user posted image
user posted image

user posted image
user posted image

user posted image
user posted image

user posted image
user posted image
TSKampung2005
post Apr 19 2014, 02:35 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
MyMRT Underground

Link : https://www.facebook.com/mrtunderground

user posted image
user posted image

user posted image
user posted image

user posted image
user posted image

user posted image
user posted image

user posted image
user posted image
TSKampung2005
post Apr 19 2014, 02:36 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
MyMRT Underground

Link : https://www.facebook.com/mrtunderground

user posted image
user posted image
TSKampung2005
post Apr 20 2014, 04:06 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SUNGAI BULOH KTM STATION

Overall view of the Sungai Buloh Station Multistorey Park and Ride site.
user posted image
user posted image

JALAN SUNGAI BULOH-SUBANG, KAMPUNG BARU SUNGAI BULOH

MRT station and pier construction near Kampung Baru Sungai Buloh.
user posted image

MRT pier construction near Kampung Baru Sungai Buloh.
user posted image

TSKampung2005
post Apr 20 2014, 04:07 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SUNGAI BULOH DEPOT

Aerial view of the depot showing the rolling stock maintenance building (left) and the covered stabling yard (right).
user posted image

View of the rolling stock maintenance building (left), infrastructure workshop building (right back) and administration building cum operations control centre (right front).
user posted image

View of Pedestrian Bridge 3 and the direct current rectifier building behind it together with the temporary tracks which have been laid.
user posted image

Trackwork being carried out in the depot.
user posted image

View of the infrastructure workshop building.
user posted image

Construction of the roof for the covered stabling yard in progress.
user posted image

Staircases linking the covered stabling yard to the pedestrian bridge.
user posted image

Construction of the maintenance pit inside the rolling stock maintenance building in progress.
user posted image
TSKampung2005
post Apr 20 2014, 04:17 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

JALAN SUNGAI BULOH-SUBANG

The completed MRT guideway leading from the Sungai Buloh Depot while the launch gantry prepares to construct the guideway for the main line.
user posted image

The completed MRT guideway leading from the Sungai Buloh Depot while the launch gantry prepares to construct the guideway for the main line.
user posted image

Aerial view of the future MRT station site, now provisionally called the Kota Damansara Station.
user posted image

Construction in progress of the MRT guideway at the station provisionally called Kota Damansara.
user posted image

RUBBER RESEARCH INSTITUTE

View of the completed MRT elevated guideway and construction work for the future MRT station, provisionally called Taman Industri Sungai Buloh.
user posted image

Construction workers doing regular physical exercise in the morning at the site of the future MRT station, provisionally called Taman Industri Sungai Buloh.
user posted image

View of the completed MRT guideway.
user posted image

View of the completed MRT guideway towards Kota Damansara.
user posted image

TAMAN INDUSTRI SUNGAI BULOH

Row of completed piers awaiting the guideway to be erected.
user posted image

Row of completed piers next to industrial lots and the Pasar Muhibbah awaiting the guideway to be erected.
user posted image
TSKampung2005
post Apr 20 2014, 04:28 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

PERSIARAN SURIAN, PJU 5

Construction of the special span near Persiaran Kenanga.
user posted image

Construction of the special span near Persiaran Kenanga.
user posted image

Pier construction along the median of Persiaran Surian.
user posted image

PERSIARAN SURIAN, DATARAN SUNWAY

View of the road diversion over the covered monsoon drain near the Persiaran Mahogani Intersection.
user posted image

View of the road diversion over the covered monsoon drain near the Persiaran Mahogani Intersection.
user posted image

Aerial view of the site of the future station now with the provisional name Dataran Sunway.
user posted image

PERSIARAN SURIAN, PELANGI DAMANSARA

Aerial view of MRT construction work along Persiaran Surian.
user posted image

MRT construction work along Persiaran Surian.
user posted image

Aerial view of MRT construction work along the median of Persiaran Surian.
user posted image

MRT construction work along the median of Persiaran Surian.
user posted image
TSKampung2005
post Apr 20 2014, 04:35 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

PERSIARAN SURIAN, MUTIARA DAMANSARA

View of the MRT construction worksite near Surian Tower which required the closure of part of Persiaran Surian.
user posted image

DAMANSARA-PUCHONG HIGHWAY, DAMANSARA UTAMA AND TAMAN TUN DR ISMAIL

MRT piers being constructed near Sri Pentas.
user posted image

MRT piers being constructed along the highway.
user posted image

MRT piers under construction along the highway at Taman Tun Dr Ismail.
user posted image

Hammerhead piers under construction.
user posted image

JALAN DAMANSARA, TAMAN TUN DR ISMAIL

View of the completed portion of the MRT guideway.
user posted image

View of the completed portion of the MRT guideway.
user posted image

A launch gantry erecting the MRT guideway along the median of Jalan Damansara.
user posted image

View of completed piers along the median of Jalan Damansara.
user posted image
TSKampung2005
post Apr 20 2014, 04:39 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SPRINT HIGHWAY, SECTION 16

View of a launch gantry constructing the MRT guideway at the site of the future MRT station, now provisionally known as Seksyen 16.
user posted image

View of a launch gantry constructing the MRT guideway at the site of the future MRT station, now provisionally known as Seksyen 16.
user posted image

SPRINT HIGHWAY, KELAB GOLF PERKHIDMATAN AWAM

MRT pier construction along the highway.
user posted image

SPRINT HIGHWAY, MEDAN DAMANSARA AND BUKIT DAMANSARA

Aerial view of the MRT project construction being carried out along the median of the SPRINT Highway.
user posted image

Aerial view of the MRT project construction being carried out along the SPRINT Highway.
user posted image

Piers by the side of the Sprint Highway being constructed.
user posted image

Portal pier being constructed over the monsoon drain by the Sprint Highway.
user posted image
TSKampung2005
post Apr 20 2014, 04:44 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SPRINT HIGHWAY, MAAROF INTERCHANGE

Aerial view of the erected beams for the concourse level of the future Pusat Bandar Damansara Station.
user posted image

Aerial view of the Pusat Bandar Damansara Station construction.
user posted image

Beams erected for the concourse level of the future Pusat Bandar Damansara MRT Station.
user posted image

View of the completed piers along the Sprint Highway.
user posted image

SPRINT HIGHWAY, PUSAT BANDAR DAMANSARA

View of pier construction.
user posted image

Preparing the rebars for pier construction.
user posted image

JALAN SEMANTAN

Aerial view of the site of the future station now provisionally named Semantan.
user posted image

Piers coming up at the site of the future station now provisionally named Semantan.
user posted image

JALAN SEMANTAN

MRT construction works in progress opposite Wisma Damansara.
user posted image
TSKampung2005
post Apr 22 2014, 12:02 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SEMANTAN PORTAL

The completed tunnel between the Semantan Portal and KL Sentral MRT Station.
user posted image

View of the work area at the portal, with the stacked tunnel lining segments waiting to be transported into the tunnel by locomotives.
user posted image

KL SENTRAL MRT STATION

Preparation work for the relaunch of the tunnel boring machine to excavate the tunnel to Pasar Seni.
user posted image

View of the screw conveyor of the tunnel boring machine as it is readied for relaunch.
user posted image

View of a completed tunnel opening at KL Sentral MRT Station.
user posted image

View of the roof slab and construction of a ventilation building (front) in progress.
user posted image

PASAR SENI MRT STATION

Construction of the roof slab (back) at the former Klang Bus Stand site while excavation work of the station box continues beneath the struts at the UO Supermarket site (front).
user posted image

Aerial view of the Pasar Seni MRT station showing excavation work at the former Plaza Warisan site.
user posted image

Exacavation works at the former UO Supermarket site being carried out.
user posted image

Aerial view of the Pasar Seni MRT station with excavation of the former UO Supermarket site at the front of the picture.
user posted image
SUSAxeFire
post Apr 22 2014, 12:04 AM

Casual
***
Junior Member
368 posts

Joined: Oct 2012
From: Penang
Majulah Malaysia
TSKampung2005
post Apr 22 2014, 12:05 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

MERDEKA STATION

Rebar installation for the construction of the station base slab.
user posted image

Rebar installation for the construction of the station base slab.
user posted image

Workers preparing to install the subsoil drain piping as part the construction of the station base slab.
user posted image

View of the top side of the station box.
user posted image

PUDU LAUNCH SHAFT

Aerial view of the Pudu Launch Shaft. The closed section of Jalan Bukit Bintang is not related to the project. The cylindrical items are parts of the tunnel boring machine.
user posted image

Cranes at the site which will be used to lower tunnel lining segments into the shaft and transported to the tunnel boring machine.
user posted image

Cranes at the site which will be used to lower tunnel lining segments into the shaft and transported to the tunnel boring machine.
user posted image

View of the southbound tunnel slab.
user posted image
TSKampung2005
post Apr 22 2014, 12:09 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

BUKIT BINTANG MRT STATION

Aerial view of the Bukit Bintang MRT Station worksite.
user posted image

Construction activity at the worksite.
user posted image

Trench excavation for the construction of the diaphragm walls in progress.
user posted image

View of works at the Yayasan Selangor basement portion which will be used for the construction of the station.
user posted image

PASAR RAKYAT STATION

Excavation work being carried out at the northern end of the station box.
user posted image

Close-up view of excavation work progressing inside the station box.
user posted image

View of the southern end of the station box with the partially covered south-bound tunnel opening (back, right).
user posted image

Struts holding apart the retaining wall at the northern end of the station box.
user posted image

This post has been edited by Kampung2005: Apr 22 2014, 12:31 AM
TSKampung2005
post Apr 22 2014, 12:13 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

COCHRANE LAUNCH SHAFT AND STATION

View of the completed tunnel at the Cochrane Launch Shaft.
user posted image

View of the south-bound tunnel to Maluri Portal with the multi-service vehicle transporting tunnel lining segments at the front.
user posted image

View of the two openings of the tunnels towards Maluri Portal.
user posted image

Work in progress to construct the concourse slab above the platform slab of the station inside the station box.
user posted image

MALURI MRT STATION

View of metro decking over the station box area (light coloured road surface), where excavation works continue beneath.
user posted image

View of metro decking (right) above the station box.
user posted image

MALURI PORTAL

Excavation in progress at the tunnel boring machine retrieval area.
user posted image

Excavation in progress at the tunnel boring machine retrieval area.
user posted image

Struts holding apart the retaining wall at the cut-and-cover section of the portal.
user posted image

Aerial view of the abutment where the underground alignment will continue on elevated viaduct.
user posted image

This post has been edited by Kampung2005: Apr 22 2014, 12:30 AM
TSKampung2005
post Apr 22 2014, 12:30 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

SRI SABAH FLATS, CHERAS

View of the beginning of the MRT southern elevated section. The alignment emerges from underground at the Maluri Portal at the back of the picture.
user posted image

View of the completed MRT guideway beside Jalan Loke Yew. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5.
user posted image

View of the completed MRT guideway beside Jalan Loke Yew. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5.
user posted image

View of the completed MRT guideway beside Sekolah Kebangsaan Seri Cheras.
user posted image

TAMAN PERTAMA, CHERAS

Completed piers along Jalan Cheras between Taman Pertama and Taman Midah.
user posted image

Launch Gantry 2 being assembled. Behind it is the Cheras Christian Cementary.
user posted image
TSKampung2005
post Apr 22 2014, 12:33 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
March 2014 update by MRT Corp

Source/link :
http://mymrt.com.my/en/project-updates

TAMAN MIDAH, CHERAS

Segment lifter being prepared for the construction of the special span over Jalan Cheras.
user posted image

Construction of the future station now provisionally named Taman Bukit Mewah being carried out.
user posted image

Close-up of construction work for the future station now provisionally named Taman Bukit Mewah being carried out.
user posted image

Launch Gantry 1 constructing the MRT guideway in front of row of shops.
user posted image

View of completed portion of the MRT guideway in front of Tesco Taman Midah. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5.
user posted image

View of completed MRT guideway in front of Tesco Taman Midah. As at the end of March a total of 32 spans of the guideway had been completed in Package V5.
user posted image

TAMAN MUTIARA BARAT

MRT construction in front of Cheras Leisure Mall.
user posted image

CHERAS SENTRAL (PLAZA PHOENIX)

MRT construction in progress along Jalan Cheras.
user posted image

TAMAN SUNTEX

Construction in progress for the Taman Suntex Station.
user posted image

Piers being construction along the highway.
user posted image

45 Pages « < 36 37 38 39 40 > » 
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0317sec    1.09    6 queries    GZIP Disabled
Time is now: 20th December 2025 - 04:44 PM