https://www.facebook.com/mrtunderground
Lifting and lowering down of the TBM796 Cutter head at Pudu Launch Shaft.







Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Apr 15 2014, 01:53 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
MyMRT Underground
https://www.facebook.com/mrtunderground Lifting and lowering down of the TBM796 Cutter head at Pudu Launch Shaft. ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Apr 15 2014, 05:48 PM
|
![]() ![]()
Junior Member
114 posts Joined: Feb 2005 |
kampung, do you have an estimate how many cars going in KL will be reduced with the SBK completion?
|
|
|
Apr 15 2014, 05:50 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(kadiology @ Apr 15 2014, 05:48 PM) Not easy to estimate.This is because... 1) You need data on projected growth of vehicles entering KL 2) Having said that it is envisaged that the line may carry 400,000 a day in its initial operation in 2017. Although there is MRT, remember population still grows. |
|
|
Apr 19 2014, 02:32 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Apr 19 2014, 02:35 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Apr 19 2014, 02:36 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Apr 20 2014, 04:06 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SUNGAI BULOH KTM STATION Overall view of the Sungai Buloh Station Multistorey Park and Ride site. ![]() ![]() JALAN SUNGAI BULOH-SUBANG, KAMPUNG BARU SUNGAI BULOH MRT station and pier construction near Kampung Baru Sungai Buloh. ![]() MRT pier construction near Kampung Baru Sungai Buloh. ![]() |
|
|
Apr 20 2014, 04:07 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SUNGAI BULOH DEPOT Aerial view of the depot showing the rolling stock maintenance building (left) and the covered stabling yard (right). ![]() View of the rolling stock maintenance building (left), infrastructure workshop building (right back) and administration building cum operations control centre (right front). ![]() View of Pedestrian Bridge 3 and the direct current rectifier building behind it together with the temporary tracks which have been laid. ![]() Trackwork being carried out in the depot. ![]() View of the infrastructure workshop building. ![]() Construction of the roof for the covered stabling yard in progress. ![]() Staircases linking the covered stabling yard to the pedestrian bridge. ![]() Construction of the maintenance pit inside the rolling stock maintenance building in progress. ![]() |
|
|
Apr 20 2014, 04:17 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates JALAN SUNGAI BULOH-SUBANG The completed MRT guideway leading from the Sungai Buloh Depot while the launch gantry prepares to construct the guideway for the main line. ![]() The completed MRT guideway leading from the Sungai Buloh Depot while the launch gantry prepares to construct the guideway for the main line. ![]() Aerial view of the future MRT station site, now provisionally called the Kota Damansara Station. ![]() Construction in progress of the MRT guideway at the station provisionally called Kota Damansara. ![]() RUBBER RESEARCH INSTITUTE View of the completed MRT elevated guideway and construction work for the future MRT station, provisionally called Taman Industri Sungai Buloh. ![]() Construction workers doing regular physical exercise in the morning at the site of the future MRT station, provisionally called Taman Industri Sungai Buloh. ![]() View of the completed MRT guideway. ![]() View of the completed MRT guideway towards Kota Damansara. ![]() TAMAN INDUSTRI SUNGAI BULOH Row of completed piers awaiting the guideway to be erected. ![]() Row of completed piers next to industrial lots and the Pasar Muhibbah awaiting the guideway to be erected. ![]() |
|
|
Apr 20 2014, 04:28 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates PERSIARAN SURIAN, PJU 5 Construction of the special span near Persiaran Kenanga. ![]() Construction of the special span near Persiaran Kenanga. ![]() Pier construction along the median of Persiaran Surian. ![]() PERSIARAN SURIAN, DATARAN SUNWAY View of the road diversion over the covered monsoon drain near the Persiaran Mahogani Intersection. ![]() View of the road diversion over the covered monsoon drain near the Persiaran Mahogani Intersection. ![]() Aerial view of the site of the future station now with the provisional name Dataran Sunway. ![]() PERSIARAN SURIAN, PELANGI DAMANSARA Aerial view of MRT construction work along Persiaran Surian. ![]() MRT construction work along Persiaran Surian. ![]() Aerial view of MRT construction work along the median of Persiaran Surian. ![]() MRT construction work along the median of Persiaran Surian. ![]() |
|
|
Apr 20 2014, 04:35 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates PERSIARAN SURIAN, MUTIARA DAMANSARA View of the MRT construction worksite near Surian Tower which required the closure of part of Persiaran Surian. ![]() DAMANSARA-PUCHONG HIGHWAY, DAMANSARA UTAMA AND TAMAN TUN DR ISMAIL MRT piers being constructed near Sri Pentas. ![]() MRT piers being constructed along the highway. ![]() MRT piers under construction along the highway at Taman Tun Dr Ismail. ![]() Hammerhead piers under construction. ![]() JALAN DAMANSARA, TAMAN TUN DR ISMAIL View of the completed portion of the MRT guideway. ![]() View of the completed portion of the MRT guideway. ![]() A launch gantry erecting the MRT guideway along the median of Jalan Damansara. ![]() View of completed piers along the median of Jalan Damansara. ![]() |
|
|
Apr 20 2014, 04:39 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SPRINT HIGHWAY, SECTION 16 View of a launch gantry constructing the MRT guideway at the site of the future MRT station, now provisionally known as Seksyen 16. ![]() View of a launch gantry constructing the MRT guideway at the site of the future MRT station, now provisionally known as Seksyen 16. ![]() SPRINT HIGHWAY, KELAB GOLF PERKHIDMATAN AWAM MRT pier construction along the highway. ![]() SPRINT HIGHWAY, MEDAN DAMANSARA AND BUKIT DAMANSARA Aerial view of the MRT project construction being carried out along the median of the SPRINT Highway. ![]() Aerial view of the MRT project construction being carried out along the SPRINT Highway. ![]() Piers by the side of the Sprint Highway being constructed. ![]() Portal pier being constructed over the monsoon drain by the Sprint Highway. ![]() |
|
|
Apr 20 2014, 04:44 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SPRINT HIGHWAY, MAAROF INTERCHANGE Aerial view of the erected beams for the concourse level of the future Pusat Bandar Damansara Station. ![]() Aerial view of the Pusat Bandar Damansara Station construction. ![]() Beams erected for the concourse level of the future Pusat Bandar Damansara MRT Station. ![]() View of the completed piers along the Sprint Highway. ![]() SPRINT HIGHWAY, PUSAT BANDAR DAMANSARA View of pier construction. ![]() Preparing the rebars for pier construction. ![]() JALAN SEMANTAN Aerial view of the site of the future station now provisionally named Semantan. ![]() Piers coming up at the site of the future station now provisionally named Semantan. ![]() JALAN SEMANTAN MRT construction works in progress opposite Wisma Damansara. ![]() |
|
|
Apr 22 2014, 12:02 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SEMANTAN PORTAL The completed tunnel between the Semantan Portal and KL Sentral MRT Station. ![]() View of the work area at the portal, with the stacked tunnel lining segments waiting to be transported into the tunnel by locomotives. ![]() KL SENTRAL MRT STATION Preparation work for the relaunch of the tunnel boring machine to excavate the tunnel to Pasar Seni. ![]() View of the screw conveyor of the tunnel boring machine as it is readied for relaunch. ![]() View of a completed tunnel opening at KL Sentral MRT Station. ![]() View of the roof slab and construction of a ventilation building (front) in progress. ![]() PASAR SENI MRT STATION Construction of the roof slab (back) at the former Klang Bus Stand site while excavation work of the station box continues beneath the struts at the UO Supermarket site (front). ![]() Aerial view of the Pasar Seni MRT station showing excavation work at the former Plaza Warisan site. ![]() Exacavation works at the former UO Supermarket site being carried out. ![]() Aerial view of the Pasar Seni MRT station with excavation of the former UO Supermarket site at the front of the picture. ![]() |
|
|
Apr 22 2014, 12:04 AM
|
![]() ![]() ![]()
Junior Member
368 posts Joined: Oct 2012 From: Penang |
Majulah Malaysia
|
|
|
Apr 22 2014, 12:05 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates MERDEKA STATION Rebar installation for the construction of the station base slab. ![]() Rebar installation for the construction of the station base slab. ![]() Workers preparing to install the subsoil drain piping as part the construction of the station base slab. ![]() View of the top side of the station box. ![]() PUDU LAUNCH SHAFT Aerial view of the Pudu Launch Shaft. The closed section of Jalan Bukit Bintang is not related to the project. The cylindrical items are parts of the tunnel boring machine. ![]() Cranes at the site which will be used to lower tunnel lining segments into the shaft and transported to the tunnel boring machine. ![]() Cranes at the site which will be used to lower tunnel lining segments into the shaft and transported to the tunnel boring machine. ![]() View of the southbound tunnel slab. ![]() |
|
|
Apr 22 2014, 12:09 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates BUKIT BINTANG MRT STATION Aerial view of the Bukit Bintang MRT Station worksite. ![]() Construction activity at the worksite. ![]() Trench excavation for the construction of the diaphragm walls in progress. ![]() View of works at the Yayasan Selangor basement portion which will be used for the construction of the station. ![]() PASAR RAKYAT STATION Excavation work being carried out at the northern end of the station box. ![]() Close-up view of excavation work progressing inside the station box. ![]() View of the southern end of the station box with the partially covered south-bound tunnel opening (back, right). ![]() Struts holding apart the retaining wall at the northern end of the station box. ![]() This post has been edited by Kampung2005: Apr 22 2014, 12:31 AM |
|
|
Apr 22 2014, 12:13 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates COCHRANE LAUNCH SHAFT AND STATION View of the completed tunnel at the Cochrane Launch Shaft. ![]() View of the south-bound tunnel to Maluri Portal with the multi-service vehicle transporting tunnel lining segments at the front. ![]() View of the two openings of the tunnels towards Maluri Portal. ![]() Work in progress to construct the concourse slab above the platform slab of the station inside the station box. ![]() MALURI MRT STATION View of metro decking over the station box area (light coloured road surface), where excavation works continue beneath. ![]() View of metro decking (right) above the station box. ![]() MALURI PORTAL Excavation in progress at the tunnel boring machine retrieval area. ![]() Excavation in progress at the tunnel boring machine retrieval area. ![]() Struts holding apart the retaining wall at the cut-and-cover section of the portal. ![]() Aerial view of the abutment where the underground alignment will continue on elevated viaduct. ![]() This post has been edited by Kampung2005: Apr 22 2014, 12:30 AM |
|
|
Apr 22 2014, 12:30 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates SRI SABAH FLATS, CHERAS View of the beginning of the MRT southern elevated section. The alignment emerges from underground at the Maluri Portal at the back of the picture. ![]() View of the completed MRT guideway beside Jalan Loke Yew. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5. ![]() View of the completed MRT guideway beside Jalan Loke Yew. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5. ![]() View of the completed MRT guideway beside Sekolah Kebangsaan Seri Cheras. ![]() TAMAN PERTAMA, CHERAS Completed piers along Jalan Cheras between Taman Pertama and Taman Midah. ![]() Launch Gantry 2 being assembled. Behind it is the Cheras Christian Cementary. ![]() |
|
|
Apr 22 2014, 12:33 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
March 2014 update by MRT Corp
Source/link : http://mymrt.com.my/en/project-updates TAMAN MIDAH, CHERAS Segment lifter being prepared for the construction of the special span over Jalan Cheras. ![]() Construction of the future station now provisionally named Taman Bukit Mewah being carried out. ![]() Close-up of construction work for the future station now provisionally named Taman Bukit Mewah being carried out. ![]() Launch Gantry 1 constructing the MRT guideway in front of row of shops. ![]() View of completed portion of the MRT guideway in front of Tesco Taman Midah. As at the end of March, a total of 32 spans of the guideway had been completed in Package V5. ![]() View of completed MRT guideway in front of Tesco Taman Midah. As at the end of March a total of 32 spans of the guideway had been completed in Package V5. ![]() TAMAN MUTIARA BARAT MRT construction in front of Cheras Leisure Mall. ![]() CHERAS SENTRAL (PLAZA PHOENIX) MRT construction in progress along Jalan Cheras. ![]() TAMAN SUNTEX Construction in progress for the Taman Suntex Station. ![]() Piers being construction along the highway. ![]() |