The viaduct of KJ line looks taller than those of AG line.
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
|
Jul 16 2012, 09:25 PM
Return to original view | Post
#61
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Nice! Kelana Jaya line extension seems progressing good for now
The viaduct of KJ line looks taller than those of AG line. |
|
|
Aug 4 2012, 11:19 AM
Return to original view | Post
#62
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Aug 4 2012, 01:38 PM
Return to original view | Post
#63
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Aug 4 2012, 01:39 PM
Return to original view | Post
#64
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Aug 4 2012, 01:57 PM
Return to original view | Post
#65
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Construction and Completion of Facilities Works (Package A) for the Kelana Jaya (KLJ) Line Extension Project by TRC.
![]() http://www.trc.com.my/WebLITE/Applications...0and%20P250.jpg ![]() http://www.trc.com.my/WebLITE/Applications...20completed.jpg ![]() http://www.trc.com.my/WebLITE/Applications...20completed.jpg ![]() http://www.trc.com.my/WebLITE/Applications...%20progress.jpg ![]() http://www.trc.com.my/WebLITE/Applications...er%20column.jpg ![]() http://www.trc.com.my/WebLITE/Applications...20Completed.jpg ![]() http://www.trc.com.my/WebLITE/Applications...%20progress.jpg ![]() http://www.trc.com.my/WebLITE/Applications...U%20channel.jpg ![]() http://www.trc.com.my/WebLITE/Applications...%20progress.jpg |
|
|
Aug 10 2012, 11:21 AM
Return to original view | Post
#66
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Aug 12 2012, 08:30 PM
Return to original view | Post
#67
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(buzzfizz @ Aug 12 2012, 06:51 PM) A) Not easy, as Sri Petaling is just east of Kinrara and Puchong which has far higher population and more pressing transport needs.B) Low population in Putrajaya C) There is half-completed monorail in Putrajaya that can fill the purpose |
|
|
Aug 12 2012, 08:31 PM
Return to original view | Post
#68
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Aug 12 2012, 08:36 PM
Return to original view | Post
#69
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(patienceGNR @ Aug 12 2012, 08:33 PM) Hi Kampung, there is a construction going on in the middle of Federal Highway just at the Subang Airport Hwy interchange and the road between Subang Jaya SS15 and SS17. Are they LRT stops/stands? Yes.There will be long viaduct section of Kelana Jaya line extension across the highway. |
|
|
Aug 12 2012, 11:56 PM
Return to original view | Post
#70
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(ZeroSOFInfinity @ Aug 12 2012, 11:54 PM) Call me crazy or whatever, but Putra Heights doesnt seem to be doing well at the moment. Are they sure that they want to put such a sophisticated building over there? It is said Sime Darby planning to do township there.This station will be the interchange station of Ampang and Kelana Jaya lines. |
|
|
Aug 17 2012, 12:04 PM
Return to original view | Post
#71
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos are all taken by mrtfreak (Skyscrapercity)
http://www.skyscrapercity.com/showthread.php?t=772140 QUOTE On Tuesday I walked along the extension route for Kelana Jaya Line as far as I could (which is about to extension station 2) and got several photos of the line. Beyond station 2 there's not much going on apart from pier erection. Subang Jaya KTM has only preparatory works going on. At station 1, they seem to be building a new access to the ramp into the depot. Not entirely sure how they will connect to the existing line as there is no prior provision for it as seen through Google Earth. Guess they will have to do some modification works here. Anyway, they are connecting the extension via the turnout provision in the viaduct that was part of the original line. Shall let the photos do the talking. ![]() The existing guideway with extension works clear in the background. ![]() Extension works up close at Jalan Emas 2. ![]() An even closer view. ![]() How it looks from the other side. ![]() A new launcher being set up at the station 1 site. ![]() You can see the new access to the ramp into Lembah Subang depot. ![]() Prepping the launcher. ![]() This is on the other side of the depot. They are creating an entirely new access here, close to station 2. ![]() Pillars outside the RapidKL depot buildings. ![]() |
|
|
Aug 17 2012, 12:05 PM
Return to original view | Post
#72
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos are all taken by mrtfreak (Skyscrapercity)
http://www.skyscrapercity.com/showthread.php?t=772140 QUOTE Pillar being cast. ![]() Portal beam will go over the river beneath... ![]() ... like so. ![]() Divergence point for main line and depot reception tracks. ![]() Progress of the pre-cast segments being launched. ![]() Just to give a sense of height of the main line over the depot reception tracks. The main line will run through and cut across the depot near the sheltered stabling areas and workshop areas. ![]() What the site at the Federal Highway at Subang Jaya looks like. They just relocated the high power tension lines. |
|
|
Aug 31 2012, 09:19 PM
Return to original view | Post
#73
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Good to see the pillar is forming
|
|
|
Sep 7 2012, 08:39 PM
Return to original view | Post
#74
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Sep 19 2012, 12:21 PM
Return to original view | Post
#75
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Sep 19 2012, 09:05 PM
Return to original view | Post
#76
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(stimix @ Sep 19 2012, 08:58 PM) Simply bring the school issue.. No logic at all just because of the school the whole of Puchong after IOI Mall suffered! all stations after IOI Mall all status quo nia..damn sad when can see so much progress at USJ & kinrara sides No worries, at least IOI is Puchong |
|
|
Sep 19 2012, 09:25 PM
Return to original view | Post
#77
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(loui @ Sep 19 2012, 09:23 PM) moving to putra height soon http://forum.lowyat.net/index.php?showtopic=2514324saw kampung posted that one of the station will be build there driving around searching for the MRT building site, but found no sign of it padahal belum start lagi, no wonder laa any idea which part of putra height they going to build at? |
|
|
Sep 23 2012, 04:20 PM
Return to original view | Post
#78
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photo taken by sapphire_blue (SSC Malaysia)
USJ 19 QUOTE ![]() |
|
|
Sep 30 2012, 08:01 PM
Return to original view | Post
#79
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
25/9/2012
![]() |
|
|
Oct 2 2012, 08:55 AM
Return to original view | Post
#80
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(bereev @ Oct 2 2012, 08:14 AM) The school also take these opportunity to request a new bigger land thats why they also don't give way, anayway MRCB really should start others work like building the station, i don't know will it be affected if the track pillar build by not follow the sequence means skip the few pillar first build the others then only come back to complete the outstanding. Prasarana has already allocated new land for the school. |
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0210sec
0.38
7 queries
GZIP Disabled
Time is now: 8th December 2025 - 01:01 PM |