QUOTE(sovietmah @ Oct 2 2012, 03:02 PM)
one question, the Kelana Jaya LRT line is it will pass thru the middle road between SS18 and SS14 housing area?
If you mean Jalan Jengka, then yes.
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
|
Oct 2 2012, 03:06 PM
Return to original view | Post
#81
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 2 2012, 03:15 PM
Return to original view | Post
#82
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 10 2012, 11:54 AM
Return to original view | Post
#83
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 12 2012, 08:30 PM
Return to original view | Post
#84
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 12 2012, 08:35 PM
Return to original view | Post
#85
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 12 2012, 08:37 PM
Return to original view | Post
#86
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Oct 13 2012, 05:51 PM
Return to original view | Post
#87
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(stimix @ Oct 13 2012, 05:07 PM) The only problem facing MRCB in Puchong is just that Indian School beside the U-Turn flyover & Indian temple. Otherwise elsewhere there are no excuse for them to delay the construction. The school problem is not whole of Puchong I hope MRCB should at least start building STN 6 first. |
|
|
Oct 14 2012, 04:14 PM
Return to original view | Post
#88
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Kelana Jaya line extension update!
Along Persiaran Kewajipan Date : 14/10/2012 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Oct 14 2012, 04:20 PM
Return to original view | Post
#89
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Ampang line extension update
Date : 14/10/2012 Kinrara (further than Giant, towards Puchong) ![]() ![]() Station 6 (Puchong, right side of IOI Mall) ![]() Station 7 (near Tesco Extra) ![]() |
|
|
Oct 25 2012, 05:51 PM
Return to original view | Post
#90
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(ANNIYAN_X @ Oct 25 2012, 05:47 PM) yup i too think should 2013..as maybe thy complete sri petaling --> kinnrara first..... then start ioi-puchong prima... if dua dua jalan sekali..i think the road will jam/headache for road user goin towards bukit jalil from puchong... so thy complete one stretch first... Different contractor.The construction meant to run concurrently, so that's why it is divided into different contractors. The reason of lack of progress in Puchong is because of the issue of a school. |
|
|
Oct 29 2012, 09:42 PM
Return to original view | Post
#91
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos taken by sapphire blue (SSC Malaysia)
QUOTE |
|
|
Oct 29 2012, 09:59 PM
Return to original view | Post
#92
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(Shiroi @ Oct 29 2012, 09:49 PM) I am not sure, though it is around Station 1 of the LRT extension project, plus there is a new switching area to the depot.There was a rumour that there is one part of the area that has the capability to support future LRT line to Klang. |
|
|
Oct 29 2012, 11:41 PM
Return to original view | Post
#93
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jonc88 @ Oct 29 2012, 11:37 PM) Hi Kampung, I believe that is actually station 2. The KLJ extension station 1 is at the opposite end of the depot I believe, near where it separates from the existing depot ramp. Thanks for the insight and welcome to this forum.Also, that should be the deck for the tracks. Not sure if there will be a cross-over there or a cripple siding (track for spare trains). The platform should be of island type further down where the tracks will flank the platform. In the early segment launching pictures you can see the rebar stubs for where the station will be constructed between the elevated viaduct. mrtfreak from skyscrapercity here by the way. I am sure you know who am i in SSC |
|
|
Nov 18 2012, 02:59 AM
Return to original view | Post
#94
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Ampang Line extension (Bukit OUG)
Photo are all taken by / belongs to sapphire blue (SSC MY) QUOTE |
|
|
Nov 18 2012, 03:45 AM
Return to original view | Post
#95
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jazzkobis @ Nov 18 2012, 03:42 AM) a question, the lrt extension to subang jaya, where will be the location of the station? near subang parade? http://www.lrtextension.com/sites/default/...tn_location.jpg |
|
|
Nov 23 2012, 03:32 PM
Return to original view | Post
#96
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Subang Jaya station, near to KTM station
23/11/2012 ![]() ![]() ![]() |
|
|
Nov 24 2012, 10:11 AM
Return to original view | Post
#97
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jonc88 @ Nov 24 2012, 10:08 AM) Progress of the Kelana Jaya line is very good indeed. The A package by TRC is quite ahead, and the B package of Sunway are also moving fast.Ampang line extension is slower, but good to see the Puchong section finally gaining momentum, with the pier beginning to appear near IOI Mall. It would be interesting to see the design of the USJ6 LRT station as it will incorporate the Sunway BRT. |
|
|
Nov 24 2012, 10:24 AM
Return to original view | Post
#98
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Nov 24 2012, 10:26 AM
Return to original view | Post
#99
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(jonc88 @ Nov 24 2012, 10:22 AM) That one would be messy for sure. Can imagine Ampang Line progress is slower as seen from the photos here. That section (NKVE) I haven't check anything since 2 months ago.Shall see whether I can drop by in mid-December and take a look around the areas as well. Have they started launching the segments that will join the existing line to the new extension track near Lembah Subang depot for Kelana Jaya Line? Its at the portion near the NKVE. QUOTE(thexs @ Nov 24 2012, 10:23 AM) Attended a meeting with Prasarana and MPSJ discussing how work would be done and to minimise the negative effects on residents of USJ. Interesting.USJ 6 station would be a huge one. Now they're digging further down the drains at USJ 6 and placing cement tubes to replace the traditional open drains. There would be a separate session for the Sunway BRT. |
|
|
Nov 25 2012, 09:25 PM
Return to original view | Post
#100
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Jalan Jengka, Subang Jaya
Date : 25/11/2012 ![]() ![]() |
| Bump Topic Add ReplyOptions New Topic |