Have a few questions regarding the house meter (pic below - sorry, don't know how to rotate the pic):
1) Can you please advice whether below meter is 1-phase or 3-phase? Location is Puncak Jalil.
2) Can I relocate this meter to column next to the front gate? If 'yes', may I know roughly how much (like deposit with TNB, relocation fee, etc)? I feel that the workmanship is really poor...so many exposed wires running directly above the main door, so ugly and scary at the same time, like anytime the whole thing will catch fire or something.
3) What are the 1 black and 2 grey things besides and above the meter? (Sorry, I am really poor with technical things).
Thank you.