Hi,
Rebuilding my recently purchased Semi-D to improve built up and rework the old piping etc. TOtal duration planned 6 months. here are some initial pics:
Before:
https://picasaweb.google.com/10342305762555...feat=directlink
Just started works, Progress 1:
https://picasaweb.google.com/10342305762555...feat=directlink
My biggest challenge thus far is to level the ground floor. Today, the entrance hall and dining are saparated by 2 feet elevation. As i have yound kids, i am not keen with the elevation, so i am levelling the floors. The only thing is, instead of loosing out ceiling height on the groun floor, we have taken the approach to bring entire house level 0.5 as low as the foundation allows to level 0 (hall). So far, manage the bring the ground floor down by 1 foot..so have to raise hall by 1 foot....still will have a ceiling height of 10 feet once we have plaster ceiling!
My Rebuilding Journey begins