Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

Investment DAMANSARA FORESTA, A new development near Desa ParkCity

views
     
Skyvi
post Oct 29 2013, 03:32 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(stevecheahsw @ Oct 27 2013, 11:45 PM)
Look like very near Telco tower....
*
Not so near as view from these photos seems.
Will it be taller than the tower as some claim to be? I doubt it.

Attached Image
Attached Image

This post has been edited by Skyvi: Oct 29 2013, 03:42 AM
Skyvi
post Oct 30 2013, 10:30 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(1282009 @ Oct 30 2013, 02:01 AM)
I also doubt it now after seeing your photo.

I guess for those block A higher floor units facing the pool, we might be able to see over KD?

Is it only my perception? It looks like block A is built higher than the other block for the same floor from this photo?
*
Block B & C car park 6 storey could be seen while block A car park storey is block by the ramp...
Maybe you have some illusion..
Skyvi
post Oct 30 2013, 10:32 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(calvinyeap @ Oct 29 2013, 04:35 PM)
I did a crude projection and looks like you are right... Well, at least from this angle la...  hmm.gif

[attachmentid=3696925]
*
Wow...nice job..appreciate it
👍
Skyvi
post Nov 2 2013, 08:17 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(SEESEE1227 @ Nov 2 2013, 04:35 PM)
I bought a unit at BLOCK C.  I wonder if the project could be finished by December 2015 or even earlier.  I intend to register my kid to the SRJK © Desa Jaya 2, Sri Damasara which will commence schooling in year 2016.  I am in a dilemma.  How if my unit not ready yet by then?  I suppose I have to rent a place.
*
Welcome. Wow, so rushing...where you staying now?
Skyvi
post Nov 3 2013, 10:50 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(manapergi @ Nov 3 2013, 05:03 PM)
You won't get sd school without utilities bill/ snp at sd address.
*
How to show for those who rent a house in Sri damansara? Tenancy agreement will do?
Skyvi
post Nov 3 2013, 10:57 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(SEESEE1227 @ Nov 3 2013, 03:19 PM)
I am staying in Rawang now.  And my kid is being taken care of by my parents. My kid will turn 7 in year 2016. And next year I have to register my kid to the school.  My big dilemma, in Rawang, or in Sri Damansara cry.gif
*
I see...may need to travel back & forth from Rawang while wait for VP? blush.gif
Skyvi
post Nov 4 2013, 02:29 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(ceveori @ Nov 4 2013, 12:35 AM)
As I remember the TNB/ Water bill is enough. Stand to be corrected  sweat.gif
*
TNB & water bill is owner name instead of tenant, no?
Skyvi
post Nov 10 2013, 09:56 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(CMW123 @ Nov 10 2013, 05:26 PM)
Sunset view taken from DF facebook...beautiful or not?

[attachmentid=3714827]
*
This sunset view is view from Desa parkcity instead of Foresta right?
Skyvi
post Nov 20 2013, 12:00 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(lek_e30 @ Nov 19 2013, 02:40 PM)
mayland is very good in avoiding LAD... hopefully does not apply to L&G
bank will be in trouble too if no project to tie up.....
*
Whether got LAD or not but as long it's under DIBS, should consider safe right?? What I really wish for is quality, quality & quality (Q3) instead..
Skyvi
post Dec 20 2013, 10:34 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(fongozic @ Dec 20 2013, 12:33 AM)
Latest progress from DF's FB
*
Block A reach 21st floor? Block B & C seems on same pace is it?
Skyvi
post Dec 20 2013, 03:24 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(cheahcw2003 @ Dec 20 2013, 12:14 PM)
Block A's lower floor progressive claim > 45% already.
*
Only 35%....next 10% is for installation of door & window which still not yet
Skyvi
post Dec 20 2013, 11:30 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(patnam @ Dec 20 2013, 03:46 PM)
man must fast fast grab this...
*
Huh? What you mean??
Skyvi
post Jan 8 2014, 06:09 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(doomdoom @ Jan 8 2014, 10:45 AM)
the landslide is frm mahameru to PWTC, nearby bukit tunku...far away from foresta...
*
Any relation to Foresta?
Skyvi
post Jan 8 2014, 10:57 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(cheahcw2003 @ Jan 8 2014, 09:21 PM)
Just someone who trying to relate every landslide happened in Malaysia to this project.
*
Bingo sweat.gif
Skyvi
post Jan 14 2014, 04:29 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(cheahcw2003 @ Jan 14 2014, 04:01 PM)
I heard the phase 2 will be RM800psf not RM700psf. Size from 1200 sqft to 2000 sqft (Duplex + double volume).

I would prefer the Phase 2 to be launched in 2015. SO that there is an enough gap of Phase 1 and 2 supplies in the market. Otherwise, too many units available in the market, not good for rental and sub sales market.
*
But resident may need to bear with the construction noise much longer....especially during the foundation stage. sweat.gif
Skyvi
post Jan 14 2014, 04:32 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(cheahcw2003 @ Jan 14 2014, 02:50 PM)
Sales update: 65 units unsold for Phase 1 (mainly left Block C+D), of which 15 units purchasers trying on loan. So only left 50 units to choose from.

Phase 2, will postponed and launch next year.
The forest facilities such as Tea House, Flying Fox are under construction now.
*
Tea house... Flying fox.... Told by SA? Or you have enter the compound of the construction site? rolleyes.gif
Skyvi
post Feb 6 2014, 09:02 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(frankor @ Jan 22 2014, 11:00 AM)
The issue need to be addressed is why the current contractor will not be involved with the Phases 3 and 4 construction works.

Maybe the Developer thinks that the quality of works by the existing Contractor in Phases 1 and 2 is not up to the Developer's requirements therefore the Developer wish to appoint China contractor  or it was because the Developer was a bad paymaster therefore the existing Contractor refused to accept appointment for works in Phases 3 and 4.
*
Or maybe to avoid LAD, china contractor speed is extremely fast as compare to local.
Skyvi
post Feb 13 2014, 08:16 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(weiloong89 @ Feb 11 2014, 09:27 AM)
is there still any unit available for sale now?
*
Yes, around 50 units left informed by SA. kindly check at the sales gallery.
Skyvi
post Feb 13 2014, 05:11 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(eddychstu @ Feb 13 2014, 12:18 PM)
The left over units still can get DIBS?
*
Not sure, didn't confirm on that.
Skyvi
post Feb 26 2014, 07:32 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2012
QUOTE(CMW123 @ Feb 24 2014, 01:56 PM)
Picture of the tower up close and the transmission tower...

learning to live with the eyesore...depending from who's point of view  tongue.gif  tongue.gif  biggrin.gif  biggrin.gif

[attachmentid=3866526]

[attachmentid=3866528]
*
Is this the tower above Foresta? Did You climb up & snap those photos?? Thanks for the sharing btw!

3 Pages < 1 2 3 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0322sec    0.63    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 05:41 PM