Investment DAMANSARA FORESTA, A new development near Desa ParkCity
|
GangHo
|
Apr 8 2013, 10:56 PM
|
|
reference from google earth
The highest peak for the mountain behind damansara foresta is about Elevation 320m
Let say we take elevation 180m as the starting ground for level 1.
The height difference between is about 140m
Let say we assume that per floor is 3.5m height.
it takes 140/3.5m = 40 storeys
Let say the construction starts at elevation 200m
the height difference would be 120m (320m-200m=120m)
It takes 120m/3.5m = 34 storeys
If we are talking about the highest peak, it could be the penthouse level.
If we are talking lower peaks, other floors still got chance.
This post has been edited by GangHo: Apr 8 2013, 10:58 PM
|
|
|
|
|
|
GangHo
|
Apr 29 2013, 12:12 PM
|
|
QUOTE(fongozic @ Apr 29 2013, 10:35 AM) no matter how the GE result. the house price wont drop right? just gov will build more "affordable house" anyone taking CIMB loan?with prime account to earn point from the loan? Government-linked development company - equity share price will be affected if existing government lose in GE but the property price. Do not think that property price will drop unless there is a worry about the country economic especially in the near future. Even if there is a drop, it would be temporary. If the new government is able to show good planning and leadership, property will rise further.
|
|
|
|
|
|
GangHo
|
May 19 2013, 12:09 AM
|
|
QUOTE(1282009 @ May 18 2013, 12:55 PM) Best Landscape Architect Referring to the podium design? I certainly like the podium design. Very creative and artistic.
|
|
|
|
|
|
GangHo
|
Jun 7 2013, 08:55 AM
|
|
QUOTE(fongozic @ Jun 3 2013, 10:17 AM) Thanks for the photo
|
|
|
|
|
|
GangHo
|
Jun 20 2013, 04:18 PM
|
|
G-pile is only the foundation contractor, refer: http://www.cschl.com.sg/images/stories/csc...eas/foresta.pdfThere should be another Civil contractor to complete the job from foundation onward.
|
|
|
|
|
|
GangHo
|
Jul 8 2013, 01:57 PM
|
|
QUOTE(CMW123 @ Jul 6 2013, 11:07 PM) Too many people, long long que for food, gallery too small to accommodate Cars park until the bridge over NKVE Block A & B left around 5 units Block C left mid high floors It should been better organised especially on the buffet dinner. There is not enough food for the turn ups and some people left empty stomach. They queue until they reach the counter/stall to know that food is already finished. And all those RSVP thing is thoroughly confusing.
|
|
|
|
|
|
GangHo
|
Jul 20 2013, 09:50 AM
|
|
I would look at it as a "chicken and egg" situation.
People like damansara area because it is convenience, modern and popular. It becomes the magnet that attract the high density development surrounding this golden piece of land.
The point is, when a land is designed to be high density, much more consideration has to be taken into account so that tenant living in the development will ENJOY and not SUFFER.
|
|
|
|
|
|
GangHo
|
Jan 7 2014, 01:00 PM
|
|
|
|
|
|
|
|
GangHo
|
Mar 14 2014, 02:22 PM
|
|
any latest progress photos?
|
|
|
|
|
|
GangHo
|
Mar 26 2014, 10:03 AM
|
|
QUOTE(Skyvi @ Mar 26 2014, 01:15 AM) if green colour glass is chosen, it would match the green surrounding perfectly.
|
|
|
|
|
|
GangHo
|
Mar 26 2014, 11:44 AM
|
|
QUOTE(killerfly @ Mar 26 2014, 12:31 PM) Block C seems like falling bhind.. It makes sense because block C is the last block to be launched. The hand over date to the buyer also later.
|
|
|
|
|
|
GangHo
|
Mar 26 2014, 03:52 PM
|
|
QUOTE(CMW123 @ Mar 26 2014, 04:08 PM) All 4 blocks should vp around the same time, right? Nope. There are time laps between the launching of the blocks. and hence the VP are also different.
|
|
|
|
|
|
GangHo
|
Mar 26 2014, 05:10 PM
|
|
that could be the case. I will confirm my VP date tomorrow since it is already stated in the S&P i remember. then others especially those from block A & B can let us know if it is the same.
|
|
|
|
|
|
GangHo
|
Apr 24 2014, 10:06 AM
|
|
Skyvi, you are not on DIBS scheme? or is this your third property?
This post has been edited by GangHo: Apr 24 2014, 10:07 AM
|
|
|
|
|
|
GangHo
|
May 5 2014, 04:17 PM
|
|
QUOTE(fongozic @ May 4 2014, 01:06 PM) In snp they mention that owner can request to some simple wall change during the constriction when need to your floor, mean certain wall we can amend abit ? Serious? Let me check. If you could specify which clause, that would be even better.
|
|
|
|
|
|
GangHo
|
May 6 2014, 09:37 AM
|
|
QUOTE(GangHo @ May 5 2014, 05:17 PM) Serious? Let me check. If you could specify which clause, that would be even better. Have a quick browsing yesterday night. The contract states that if you wish to make any amendment, you have to inform the developer and the developer will charge you according to what you need to change if there is any extra cost. However, it is subjected to the approved building plan. I have also checked my VP condition. Contract signed on Feb 2013. VP would be 42 months from the contract signing date which means the developer handing over date would be Aug 2016. This is according to Contract. However, I believe they should be able to handover earlier than this date. This post has been edited by GangHo: May 6 2014, 09:39 AM
|
|
|
|
|
|
GangHo
|
May 12 2014, 04:12 PM
|
|
QUOTE(cheahcw2003 @ May 11 2014, 09:54 PM) My SPA was signed on Jun 2012 (Block A). 42 months construction time means Block A should be VP by Dec 2015. If the developer deliver in 2016, means got LAD. All blocks should be Vp at the same time, because all sharing the same common facilities, entrance, car park, swimming pool, gym (which is in between Block B+C). Anybody signed the S&P earlier than June 2012?
|
|
|
|
|
|
GangHo
|
May 12 2014, 06:10 PM
|
|
QUOTE(CMW123 @ May 12 2014, 06:47 PM) From the first picture if block A has reach top floor, looks like no units will be higher than the hill...is that assumption correct? yes, it has been calculated last time. One member also did a wonderful simulation. Check back the old treads and you will be able to find it.
|
|
|
|
|
|
GangHo
|
May 14 2014, 12:46 PM
|
|
QUOTE(fongozic @ May 14 2014, 01:02 PM) mean block a will VP 1st ? block C still very low.. how about the comment area and pool famicilites? will follow block A or C? It all depending on the performance of the contractor. Based on the contract with the buyer, they need to put priority in all of the contractual items. The podium construction could be a critical item to be completed for block A and when it is completed it could be cordoned off so that works at block C could be continue. By that time, works at block C should be completed substantially leaving maybe the touching up, minor installation testing & commissioning and etc.
|
|
|
|
|
|
GangHo
|
May 15 2014, 11:19 AM
|
|
Looks higher than phase I which I believe it should not be the case.
And happy to know that they are launching in year 2014.
Let the heat continues.
|
|
|
|
|