Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 SETAPAK GREEN RESIDENCES by UOA v2, Greenery residential in the making...

views
     
SmallPotato2011
post Dec 30 2012, 02:23 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(ng168 @ Dec 30 2012, 02:14 PM)
Yup. I have bought 288R.
My bro is looking for a unit in setapak area too and preferable with sauna. I saw SG is with it, thus thinking of introduce to my bro.

Are they setting up any unit for show room or all already sold?
*
Unit 3-15 should be the show unit as it is will full air cons and curtains installed...
QUOTE(cybertechmkteo @ Dec 23 2012, 12:27 AM)

anyway fyi, i talked to one of the sales staff in Scenaria today and apparently the banner hang @ the car park plaza can be removed very soon. reason = the remaining units of SG (around 35) of them already fully booked by bulk purchase group. the RM/PSF is ranging from RM390 paling murah to RM510 paling mahal!! shocking.gif
But cyberteo was said it is fully sold for the remaining 35 units... Anyway, You may call UOA see see... wink.gif

This post has been edited by SmallPotato2011: Dec 30 2012, 03:31 PM
SmallPotato2011
post Dec 30 2012, 07:14 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(ecin @ Dec 30 2012, 07:02 PM)
I heard they'll have in-house contractor (but i'm afraid about their design idea ... Thinking should I get external one), probably the unit is the renovation contractor show room
*
I see...

I have my own idea and ask them to do the same... lol!

Get their quotation and compare with other company... If similar price or much lower, then only will take them..... In house contractor is good, as if anything not right can find them any time... They will try to build good good to avoid any troublesome follow up matter..

Hope My understanding is right for UOA in house contractor...
SmallPotato2011
post Dec 31 2012, 08:31 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(hidden830726 @ Dec 31 2012, 07:50 AM)
All wear green? Haha
*

I don't have green shirt... Haha... Or we create a standard and small invitation paper/card (self print required)?

smile.gif
SmallPotato2011
post Dec 31 2012, 06:10 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
I think you guys are looking for a fire door like below. Actually fire door are installed in the RED BOXes......

Special right? The fire door is not at the end of the unit but middle of the units.... May be they want to let the sun light to shine into the corridor.... To save energy; GREEN? blush.gif


Added on December 31, 2012, 6:13 pm
QUOTE(ZlcF @ Dec 31 2012, 06:06 PM)
Hi Hidden,

Well, i just wonder how they control the security of each floor if the fire exit staircase are left open, no door.
Before I buy the unit, the sales person was telling me not to worry about security since the fire exit door is open from 1-way.
Now that there is no door, is open-all-the-way, anyone can easily access other floors.
Not forgetting those families with young kids will have "great time" managing kids from running up and down the stairs.
*
Your concern is reasonable... blink.gif


Added on December 31, 2012, 6:16 pm
QUOTE(hidden830726 @ Dec 31 2012, 05:26 PM)
Me as someone who takeup photography as hobby,

definitely agreed that SP a much better photographer than Cyber hahahaaha.  rclxms.gif

Cyber: No hard feelings... hahahaahahahah
*
Pai seh pai seh.... I just use normal camera.... (Not DSLR)... blush.gif blush.gif blush.gif

This post has been edited by SmallPotato2011: Dec 31 2012, 06:16 PM


Attached thumbnail(s)
Attached Image Attached Image

Attached image(s)
Attached Image
SmallPotato2011
post Dec 31 2012, 07:02 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(ecin @ Dec 31 2012, 11:37 AM)
sounds good! just one thing though, green => Stop Lynas, I'm afraid that some car gets stopped in their journey .. haha tongue.gif I don't dare to ask them to wear it  laugh.gif

Added on

with clip one like those hiking events/seminars is very good I think:
http://www.liksoon.com/MyMall/index.php?do...D164%26page%3D1

Does anybody want to sponsor, and help out (say, giving it out on that day upon owner's arrival & attendance marked)?

Added on

we'll see what we (including you, every owners) can do best on that day, tq
*
Just an invitation card.... Look ok? blush.gif


Attached thumbnail(s)
Attached Image
SmallPotato2011
post Dec 31 2012, 07:05 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(hidden830726 @ Dec 31 2012, 07:01 PM)
Wait, meaning that if my hse on fire, I have to go to the other side of the building to run? What if both side fire? center got staircase too right... Hmm should b good enough
*
Yes. Total got 3 staircase.... No worry....

Bridge entrance (Near type D) x 1 staircase
Lift entrance (Near type C) x 1 staircase
At the end (Near type A) x 1 staircase smile.gif
SmallPotato2011
post Jan 9 2013, 12:02 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(Lewing @ Jan 8 2013, 05:47 PM)
I was a bit surprised too. If UOA build brick wall fencing covering the entire compound, then they definitely rocks! Right now, i need to see it for myself first.
*
Agree. Hopefully it is entire compound with brick wall la....
SmallPotato2011
post Jan 9 2013, 12:03 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(ecin @ Jan 8 2013, 08:16 PM)


I may shoot some photo if I go tomorrow daytime if there's something new to see already
*
Thanks first, Ecin dai kor..
SmallPotato2011
post Jan 9 2013, 10:23 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(jackoz @ Jan 9 2013, 08:55 PM)
I can't make it this Friday. Whoever going pls update in the forum. Thx!
*
It is 18th Jan, next Friday la...
SmallPotato2011
post Jan 9 2013, 10:23 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(Lewing @ Jan 9 2013, 08:25 PM)
I can live with VP postponed. Good news so far!
*
Good to hear this too... At least not totally ignore us... smile.gif

Got hope...
SmallPotato2011
post Jan 9 2013, 10:26 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(ecin @ Jan 9 2013, 07:47 PM)
Open feedback/complaint discussion.
Whoever sent in feedback/complaint letter to uoacare email got the call.

Added on
It is said boss visited to the site 2 days ago.
It is said VP postponed.
It is said a lot of bricks sent in today.
*
I am totally fine the VP be delay one or two months as long as they make it nicer.. smile.gif

Btw, assume UOA need to pay 1K interest per month for each unit under DIBS, they need to pay about 400K per month... This is not a small amount, believe they will "fast hand fast leg" settle any outstanding issue and VP it for us...
SmallPotato2011
post Jan 11 2013, 12:24 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(hidden830726 @ Jan 10 2013, 10:39 PM)
Wei, dont kor kor like that, the most important is Cyber kor and Ecin, the rest all small potato only.
*
Yayaya... I am smallpotato sahaja...
SmallPotato2011
post Jan 11 2013, 12:26 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
That day I also not confirm can go or not... Put 11am, not up not down la... Take half day leave seem not enough... One day leave... A bit hard to take as got work to do on that day... sad.gif
SmallPotato2011
post Jan 14 2013, 10:04 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(hidden830726 @ Jan 14 2013, 09:54 PM)
Me <---waiting patiently for the key
*
Seem like cant move in before CNY liao, I am fine to get key after CNY la... Waiting patiently too... smile.gif
SmallPotato2011
post Jan 18 2013, 12:51 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
Too high workload... "Lim Beh" still working.... Don't see any chance to go tomorrow... :'(
SmallPotato2011
post Jan 18 2013, 12:51 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
Hope those going can bring us some good news!!! Amat terima kasih!
SmallPotato2011
post Feb 15 2013, 03:50 PM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
QUOTE(hidden830726 @ Feb 15 2013, 08:52 AM)
Any of u Received letter on VP and full disbursement?
*
Yes, hidden gor. Actually we are discussing this in FB too... smile.gif
SmallPotato2011
post Feb 20 2013, 07:17 AM

Regular
******
Senior Member
1,248 posts

Joined: May 2011
Today VP!!! smile.gif Can't await.....

17 Pages « < 15 16 17Top
 

Change to:
| Lo-Fi Version
0.0426sec    1.08    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 08:52 AM