Welcome Guest ( Log In | Register )

4 Pages < 1 2 3 4 >Bottom

Outline · [ Standard ] · Linear+

 Bandar Putera 2 , Klang, worth buying?

views
     
sikhwan3
post Sep 28 2013, 07:18 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 28 2013, 05:46 PM)
huh? our dura already installed. Your meter got stolen?
*
Not isntall yet.....jalan 4L infront padang permainan..i dont know why so late to install....all the hauses in this lane not yett install


This post has been edited by sikhwan3: Sep 28 2013, 07:19 PM
sikhwan3
post Sep 29 2013, 10:54 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Sep 28 2013, 09:47 PM)
Owh yeke? When actually they planning to install it? How bout tnb? Hv power already? Street lighting functioning at nite?
*
Suppose mmg dh pasang meter tu...tapi syabas lorong lain dulu kot...minggu ni maybe setat pasang area sini...tnb meter no problem...street light x perasan..sebab x penah g sana waktu mlm...
sikhwan3
post Sep 30 2013, 02:53 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 12:22 PM)
Siap sudah
*
nice..cantik table top.. drool.gif drool.gif
sikhwan3
post Sep 30 2013, 03:39 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 03:35 PM)
Hehee.tq
*
curve kat tepi mmg smart
sikhwan3
post Sep 30 2013, 05:25 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 04:39 PM)
Since 3rd bilik xda tingkap.after i extend.they put batu ni.nice right.
*
tiba2 rasa mcm nak tiru pulak design reno ni..haha

thumbup.gif thumbup.gif
sikhwan3
post Oct 2 2013, 08:26 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Oct 2 2013, 08:05 AM)
Yes. mine is dura. My side, the whole street on my house has ON the light. Why your side slow? by right, cadia should get the facilities first. Now it seem opposite
*
yes agreed...cadia so slow...maybe because cadia is cheaper than dura...so IOI pay less attention...haha

laugh.gif laugh.gif laugh.gif
sikhwan3
post Oct 3 2013, 08:08 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Oct 3 2013, 07:43 AM)
i will take my keys today...
*
congrats bro biggrin.gif biggrin.gif
sikhwan3
post Oct 9 2013, 09:22 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


error

This post has been edited by sikhwan3: Oct 9 2013, 09:26 AM
sikhwan3
post Oct 16 2013, 08:05 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(langsk @ Oct 15 2013, 11:14 PM)
It seem like there is people start stay already.... I saw one at 4L/ks8

My reno should be completed in 2week time..  Hehehe..
*
thats my jiran..haha..already meet them..really nice people... biggrin.gif biggrin.gif
sikhwan3
post Oct 16 2013, 04:21 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


guys...just asking...is anyone here have plan to install laminate floor??i'm wondering how much it will cost..emmm..if anyone here happens to know pls share..tq
sikhwan3
post Oct 17 2013, 02:09 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(langsk @ Oct 17 2013, 01:53 PM)
When...  We at same row loh....
*
every week i went there...check on my house under reno....u no berapa?mine number 11..

This post has been edited by sikhwan3: Oct 17 2013, 02:10 PM
sikhwan3
post Oct 17 2013, 02:13 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(langsk @ Oct 17 2013, 01:59 PM)
I want there just now...  Saw got 2 corner house hack all the side wall.... 

I wondering....  If they hack all the side wall...  I think the money already enough them to buy a 2 story house already.....
*
i think its not about money...some people love to own single story rather the double story house...penat naik2 tangga ni...haha
sikhwan3
post Oct 19 2013, 03:01 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Oct 18 2013, 11:11 PM)
Hi neighbour..mine 21..we r in the same row..quite near also..i haritu ade jalan kaki from my house straight to the tnb substation n saw ur house being renovated..how is it? Almost done? Mine no progress yet, wait for defect rectificatiom works dome then only start..  icon_rolleyes.gif
*
Halloooo...may be 2 or 3 weeks lagi br siap....tomorrow im gonna check the progress again...hopefully everythings ok & follow schedule
sikhwan3
post Nov 18 2013, 02:15 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


just got back from ioi reporting my house defects...major defect detected such as roof leaking above the master bathroom ceiling and both of bathroom floor tiles not level thus resulting water stagnation...demmm!!
sikhwan3
post Nov 18 2013, 03:33 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Nov 18 2013, 03:09 PM)
mine also got roof leaking.. now my ceiling fan n 2 numbers of fluorescent light not functioning (suspect due to the leakage issue)..everyday call also said tomorrow will attend..but nothing is done..tile work i thing almost done..my tenant want to move in by this week..haiiyaaa...
*
now musim tengkujuh time... need to push ioi to solve roof leaking ASAP. sad.gif sad.gif

they are running out of tiles.... they only can start tile works for my house after they receive new tiles stock in two weeks vmad.gif vmad.gif vmad.gif
sikhwan3
post Nov 22 2013, 10:10 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


i just found one big problem...i suspect pipe inside 2nd bathroom wall leaking because my room #3 wall (sharing wall between bathroom# 2) leave water marks at the bottom of the wall and the wall also little bit wet..

sikhwan3
post Nov 25 2013, 08:24 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Nov 23 2013, 01:31 PM)
Any update?
reported your defect? So how long they they take to resolve your case. Sure need to hack wall for this case.
*
all the cracking wall, roof leaking and others minor issue has been solved on Thursday. i take one day leave since i already occupied the house... so i ask them to take one whole day to solve the minor defects...

for the tiles work will take another 2 or 3 weeks since different contractor will take charge on handling those things and their running out of tiles...lastly for the leaking pipe i will send the new defect form today and hopefully they will take action ASAP...

sad.gif sad.gif sad.gif
sikhwan3
post Nov 25 2013, 02:37 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Nov 25 2013, 02:07 PM)
so sikhwan3, your piping problem done? at my unit has 3 pcs tile they left infront of my gate after they replace my tiles in the toilet..tp not sure ade lg x..klu ade u amik je la..my unit no. 21..then u ask them to pasang immediately..haha
*
not yet bro...don't no what the problem really is..it might be pipe itself leaking inside the wall..or maybe poor water tap installation causing the water flow inside the wall...need to check first...


by da way...have anyone here notice that the water flows from the tank really slow?
sikhwan3
post Nov 26 2013, 08:19 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Nov 25 2013, 10:57 PM)
Anyone got contact for house tinted? What is the price range? But i've already install grill..huhuhu...
*
i already make appointment to tinted my house this saturday....the price also little bit cheap...rm800++ for the whole house.. smile.gif smile.gif
sikhwan3
post Nov 26 2013, 08:23 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Nov 25 2013, 10:58 PM)
Yup..very slow..air kencing pon laju..haha..is it ok if we just bypass and connect it direcy to syabas meter? Has anyone did that?

Myb ur pipe socket not connect properly..need to hack woo..are they using hdpe pipe or just pvc pipe je ey for our water supply pipe? If hdpe, then its ok coz very durable..but only issue on poor connection la..myb at the elbow or the connector..

myb u can check it by urself..try to close the main pipe to the toilet tonite n let the wall dry..then tomorrow nite u open back the valve n see if the wall is wet again ot not..if the wall wet again for sure something wrong with the concealed pipe..then call alex to send their guy to immediately hack n replace/reconnect back the pipe..
*
already done that...but the problem is..after 3 days...the wall still cold and lembap2...xtau dh nak wat camne....boleh bagi no alex...lupe nak mintak no dier haritu...

4 Pages < 1 2 3 4 >Top
 

Change to:
| Lo-Fi Version
0.0254sec    1.72    7 queries    GZIP Disabled
Time is now: 23rd December 2025 - 08:31 AM