anybody know how much is the quit rent estimate for this type of house?
need to allocate in yearly budget on that also...
Platinum Victory Lake View City Phase 3
Platinum Victory Lake View City Phase 3
|
|
May 30 2011, 11:43 AM
Return to original view | Post
#1
|
![]()
Junior Member
32 posts Joined: May 2011 |
anybody know how much is the quit rent estimate for this type of house?
need to allocate in yearly budget on that also... |
|
|
|
|
|
Jun 24 2011, 03:00 PM
Return to original view | Post
#2
|
![]()
Junior Member
32 posts Joined: May 2011 |
still not very good if got late payment issue... lol
|
|
|
Jun 26 2011, 10:48 PM
Return to original view | Post
#3
|
![]()
Junior Member
32 posts Joined: May 2011 |
quite worried with the depth of kitchen. 1.5 feet i assume. Can we fit a kitchen cabinet there? with sink & hob? whats the normal depth? can anyone share?
This post has been edited by hazwanh: Jun 26 2011, 10:49 PM |
|
|
Jun 26 2011, 11:09 PM
Return to original view | Post
#4
|
![]()
Junior Member
32 posts Joined: May 2011 |
I was just looking at the tiles beneath, 1.5 so i assume 1.5feet.
Definitely cannot be cabinet on both side. If the sink side is around 2 ft, thats quite ok. Coz most cabinet have around 2ft depth. The showhouse didnt have a full cabinet on the wall side also (if i can remember correctly) it just have a wall rack, and a bar counter which took some space of the dining area. Hope the yard outside is quite spacious, may need to use that space for cabinet. (Pecah pintu??) Added on June 26, 2011, 11:10 pmalmost forgot, thanks for the photos... its helpfull This post has been edited by hazwanh: Jun 26 2011, 11:10 PM |
|
|
Jun 30 2011, 10:43 AM
Return to original view | Post
#5
|
![]()
Junior Member
32 posts Joined: May 2011 |
Normally need to deposit some fee to management (rm 1k if im not mistaken, plus few hundreds for cleaning fee), fill up some forms,
for security guard purposes, cleaning after renovation, garbage disposal and also some rules need to be followed, such as working period, lift management, parking area for the lorries, the reason is that not to disturb other tenant, (if renovate early then no much tenant yet, then can be quite lenient) For their in-house contractors, some of these fees/deposits are waived I am not sure in details. |
|
|
Jul 5 2011, 11:37 AM
Return to original view | Post
#6
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(Odinn @ Jul 5 2011, 10:51 AM) Just want to ask,How do you know can get compensation for delay? any date we can refer? in SPA? Added on July 5, 2011, 11:39 am QUOTE(Odinn @ Jul 5 2011, 11:26 AM) Yup, the weird wall partition doesn't make sense to me, what is anyone going to put there or do with a small space like that..put flower pot also pointless wasted space, if fat guy like me, for sure cannot go through that, lolmaybe can use that space for hydrophonic vege, This post has been edited by hazwanh: Jul 5 2011, 11:39 AM |
|
|
|
|
|
Jul 13 2011, 03:40 PM
Return to original view | Post
#7
|
![]()
Junior Member
32 posts Joined: May 2011 |
they should be ready before september, bcoz most SPA was signed to complete in september, some in october, some later,
so if they cannot meet september, those batch can claim la, i think, is my understanding on the SPA issue correct or not? no experience... |
|
|
Jul 14 2011, 01:17 AM
Return to original view | Post
#8
|
![]()
Junior Member
32 posts Joined: May 2011 |
lol, BERSIH PV13 rally would be good to, help them bersih2 faster, then we can get key faster.
for interest payment, we actually can request to bank to start the full monthly payment earlier, even before we got key, just fill up some forms, and later they will process and start the full monthly at the month we stated in the form. |
|
|
Jul 14 2011, 02:35 AM
Return to original view | Post
#9
|
![]()
Junior Member
32 posts Joined: May 2011 |
If im not mistaken,
The shoplots have different parking areas outside, not sharing with visitors parking, the apmt got different entrance than the commercials, so it have clear barrier between both, separated by wall or smth (pls correct me if im wrg coz i havent seen the actual, this only by my understanding on their layout drwg last time) my worry is some may come inside apmt visitor parking claiming as visitor, but act going to the shops, For that the security guard have to be detail in verifying, this may hassle to our visitors, but what else can we do |
|
|
Jul 15 2011, 11:07 AM
Return to original view | Post
#10
|
![]()
Junior Member
32 posts Joined: May 2011 |
initially i also thought they are giving the same tiles to us, 2x2 design,
but looking at one of our friends post on actual unit, quite sad, its not he same is it? feel want to hack the floor, but that will cost a lot, cannot afford it. want to ask u guys opinion, the yard is normally used for kitchen extension, or for storage & cleaning (washing machine, hanging clothes, storage of utilities) the kitchen is quite tight so may need to use this extra space. but then where else to dry clothes? balcony? plan to plant some flowers there at balcony |
|
|
Jul 17 2011, 05:09 AM
Return to original view | Post
#11
|
![]()
Junior Member
32 posts Joined: May 2011 |
thanks, great suggestion,
i am thinking the same as your answer c: also, that study area may got a lot of space inside, can even make a smaller store room inside (if want to look separated from the study room itself), the 3-room house type will be much easier to work with on this, will check on item b:, that would be good suggestion too. i prefer not to put wet kitchen outside, i dont know, insects from outside/dust maybe, anyway, will check the suitability... |
|
|
Jul 18 2011, 11:18 AM
Return to original view | Post
#12
|
![]()
Junior Member
32 posts Joined: May 2011 |
Timewise, i believe we have flexible time, if we got the key as expected (end of the month.)
next month gonna be fasting season, so i think malays wont be moving that month, even in september (raya season) even for rent, ppl probably want to go in on october. and yes if they already know the house layout, that will be faster (coordication & installation wise) whatever it is, need to ask their manpower load outside contractor also i dont think there much problem. (if only 1 con, if multiple, a bit headache) agree with dkcc for me, built-ins will be priority, so may go to in-house contractor, some other things that is movable, may source out or done in phases. depends. just my 2cents Added on July 18, 2011, 11:23 am QUOTE(Ricky300 @ Jul 18 2011, 11:10 AM) 15k isnt it?all covered parking. plus additional fee for the agreement, about rm500 roughly This post has been edited by hazwanh: Jul 18 2011, 11:23 AM |
|
|
Jul 18 2011, 11:34 AM
Return to original view | Post
#13
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(Ricky300 @ Jul 18 2011, 11:25 AM) still need agreement, this will be addition to the SPA,so later if you sell the house, you have to sell both parking together. last time it was 12k. but after complete, it will be 15k. maybe you can ask what is the price now (considering it is about to complete already) if lucky you can get 12k, i dunno. |
|
|
|
|
|
Jul 19 2011, 12:26 PM
Return to original view | Post
#14
|
![]()
Junior Member
32 posts Joined: May 2011 |
i thought the 'member card' is the security level we are having in other PV as well? or is it not materialised?
later have to voice out to the joint management maybe, but we have to bear in mind not everything we suggest will be accepted, they will have to review, discuss, feedback from various parties, there may be various way to mitigate a problem, so hopefully we all can live in harmony later and respect each other. i also dont want the enviroment where tenant & management fighting always, yes, i am expecting 'member card' type of security as well when i chose this apmt before, (if not, what else the function of that member card? lol) regular security walkaround, cctv, is good also. |
|
|
Jul 19 2011, 04:51 PM
Return to original view | Post
#15
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(Ricky300 @ Jul 19 2011, 04:46 PM) Want to ask. i think it is possible, Is that possible to build a wall at Type Bx study area in becoming a room like Bb1 ? Any implication? How much is the cost of building the wall including wiring and fan? no need for brick wall, normal wooden/good quality plywood wall also can, that is cheaper. Added on July 19, 2011, 4:56 pm QUOTE(nakashimakazuma @ Jul 19 2011, 02:39 PM) Hi peter, how much will it cost to change the tiles to 2x2?am plan to do a raise platform at study area with laminated flooring (will use this area as dining area later) mean this area's tile remain, just add the raise platform & flooring for other area like living, kitchen and all bedroom i plan to change to those 2ft x 2ft tiles toilet, balcony, yard remain (save money too) im interested on that also... Added on July 19, 2011, 5:04 pm QUOTE(sony_user999 @ Jul 19 2011, 04:40 PM) so, who's in? im in,maybe we made a listing first. haha. start with me: sony_user999 - Block B Level 9 owner - - - - Odinn, facing at the pool is nice. hahaha... can do a part time job as guard already. XD hazwanh Block B level 13a need 1 place where we can interact online, share discussions, improvements, or maybe share unifi hotspot with neighbours downstairs, lol This post has been edited by hazwanh: Jul 19 2011, 05:04 PM |
|
|
Jul 19 2011, 05:25 PM
Return to original view | Post
#16
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(sony_user999 @ Jul 19 2011, 05:16 PM) Brother Ricky300. raised floor is interesting, add uniqueness to the house, not the lame boring feeling like living in a square box,nonid block it with wall of concrete. it's special to leave it just as a study room. unless u want to rent out9more room, more income ma).hahaha i like an idea of bro nakashimakazuma. raise up the floor of this study room. then, u might add a sliding door for this room. it will be another type of feel in ur stay area....speciaL.... Added on July 19, 2011, 5:17 pmi think doing a list in this forum wont help a thing. i had created a group in FB. browse "Platinum Victory PV13 Community" in FB. then join it. its a freely open group. i wish to create few more topics in it. so tat we can discuss bout different issue regarding PV13 things. too bad mine is 4 rooms, else i might do the same... |
|
|
Jul 19 2011, 05:30 PM
Return to original view | Post
#17
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(sony_user999 @ Jul 19 2011, 05:25 PM) hope this will helps in forming a group of PV13. i just want it coz its facing the swimming pool, lolAdded on July 19, 2011, 5:26 pmhazwan. agreed wit u. mine is also 4room. for rentout is good. but for own stay, lack of specialty. so i can jump right from my balcony into the pool la |
|
|
Jul 21 2011, 05:26 PM
Return to original view | Post
#18
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(Ricky300 @ Jul 21 2011, 04:33 PM) Overtime open there? sorry, what is Overtime?Fantastic...lol But I don't think it will be possible, Imagine what if those outside following you at the back and come inside the Condo. We won't know unless there is a guard. Having say that, i don't think management will allocate a guard there. (Cost) More so, nowadays guard simply open the door for outsider. |
|
|
Jul 21 2011, 05:29 PM
Return to original view | Post
#19
|
![]()
Junior Member
32 posts Joined: May 2011 |
QUOTE(Ricky300 @ Jul 21 2011, 05:27 PM) wow, i like...but.... lol... bulan puasa coming... cannot naughty2 |
|
|
Jul 21 2011, 09:30 PM
Return to original view | Post
#20
|
![]()
Junior Member
32 posts Joined: May 2011 |
|
| Change to: | 0.0341sec
0.42
7 queries
GZIP Disabled
Time is now: 21st December 2025 - 02:52 AM |