Hi GUys
Just came back from the phase 5 site, 1st floor and ground floor bed room tiles has been changed from porcelain (as what stated in the brochure) to cheap ceramic tiles size 1 x 1. WTF!! This is consider cheating d...

Can we do something about it, stop them from further installing? Meet with the developer? file a suit against them? Since this a a collaboration project between states agency ( setiausaha kerajaan negeri selangor), can we go and meet up with Sepang MP?

Shall we meet up and discuss about it?
Angry Owner 5
post Sep 12 2012, 10:38 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


Are u phase 5 owner also? Did the S&P stated it is porcelain tiles?


Added on September 12, 2012, 10:44 pm
QUOTE(snake4168 @ Sep 12 2012, 09:54 PM)
The brochure didn't state including bedroom. Must check S&P. Hardly we can see this brochure flaw when we bought the house.

But the S&P already stated clearly, then we can complain to tribunal.
*
Did the S&P stated that it come with porcelain tiles for all bedroom and first floor?


Added on September 12, 2012, 10:52 pm
QUOTE(Angry Owner 5 @ Sep 12 2012, 10:38 PM)
Are u phase 5 owner also? Did the S&P stated it is porcelain tiles?


Added on September 12, 2012, 10:44 pm
Did the S&P stated that it come with porcelain tiles for all bedroom and first floor?
*
but even the first floor living installed with the cheap 1x1 ceramic tiles and it is sticky type....sure out feet felt uncomfortable later on

This post has been edited by Angry Owner 5: Sep 12 2012, 10:52 PM
Angry Owner 5
post Sep 13 2012, 11:12 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 10:33 AM)
i'm a phase 5 owner.. let me go back and check it out from the s&p...
my wife's boss knows one of the MD from Acmar and she also bought a corner unit from phase 5... if something wrong with the unit from what it should be.. i'm sure she will complain 99 one.. she is those not easy going type of people...
*
But it is confirm first floor with ceramic tiles and size (1x1) can see it is a cheap material and plaster work bad, I can see many wall surface and finishing senget, pls ask ur wife's boss visit the site and starts complain before too late.
Angry Owner 5
post Sep 13 2012, 02:58 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 02:12 PM)
if my memory serve me right... 1st floor family hall should be using 1.5x1.5 tiles... really have to check the s&p...
how you manage to get in the site of phase 5 to view the house??
*
I go there at 6pm, just walk in and tell the guard and then they will let u in, our standard Malaysian body language, just tabit to them and all get thru. In the brochure says is porcelain tiles.
Angry Owner 5
post Sep 13 2012, 08:49 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 13 2012, 06:04 PM)
S&P stated 1st floor family hall  & 4 rooms also 1 x 1 porcelain tiles.

Ground floor living hall till dry kitchen 1.5 x 1.5
*
the actual is all 4 bed room and first floor with cheap material 1x1 ceramic tiles, white color, very slippery....can we do something about it?
what shld we do now before the contractor has finished install all the tiles....


Added on September 13, 2012, 8:52 pm
QUOTE(vsk @ Sep 13 2012, 07:26 PM)
Vendor Tipu Phase 5 Buyer,Family Hall&1,2,3,Guest Room Refer SPA 100% Comfirm Polished Porcelain Tiles,Vendor Change to Ceramic Tiles .          Refer GOV Rules Can't Get CF Approval 
                         
                                If Can Get:- MPK RASUAH         

*
apa kita boleh buat ya? sekarang kan musim pilihan raya , mungkin adun adun dapat tolong kita???

This post has been edited by Angry Owner 5: Sep 13 2012, 08:52 PM
Angry Owner 5
post Sep 13 2012, 09:18 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 08:58 PM)
just checked on my s&p.. living room, dining, dry kitchen, 4 bedrooms clearly stated "Polished porcelain tiles" but didn't stated what is the size of the tiles... feel cheated... sad.gif
*
but atleast it stated it is porcelain, but actual they put in cheap ceramic tiles.....totally unacceptable....


Added on September 13, 2012, 9:24 pm
QUOTE(Angry Owner 5 @ Sep 13 2012, 02:58 PM)
I go there at 6pm, just walk in and tell the guard and then they will let u in, our standard Malaysian body language, just tabit to them and all get thru. In the brochure says is porcelain tiles.
*
Edwin, we really need ur wife to complain to the Acmar MD, i can join also , not problem....

This post has been edited by Angry Owner 5: Sep 13 2012, 09:24 PM
Angry Owner 5
post Sep 13 2012, 10:42 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(woengx2 @ Sep 13 2012, 10:14 PM)
Unless there is clauses stating in PAM ( Pertubuhan Akitek Malaysia ) the different between "Procelain" & "Ceramis" otherwise at what "base" you go and argue with developer ?


Added on September 13, 2012, 10:15 pm=====> "Procelain" & "Ceramic"
*
shld be la, can not be Malaysia alreayd so 'fan shu' in everything, this architect asso. also so 'fan shu'
Angry Owner 5
post Sep 14 2012, 07:00 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(Bahkuteh @ Sep 14 2012, 12:33 AM)
As I know 1'by 1' are ceramic only. Porcelain for bigger tlles ie 2' by 2' onwards.
*
Phase 5 kena con d, 3rd and 4th row has toll install tiles yet, maybe can stop them from installing those cheap quality ceramic tiles? But how?
Angry Owner 5
post Sep 16 2012, 11:29 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 15 2012, 06:21 PM)
Anyone please try to post a picture of the problem instead. We can discuss about it.

I had log a official complian to Acmar. They say will talk to project manager.

I'm afraid that they ask me back where is the proof..
*
if the project manager / Acmar ask for proof, lets ask them to go visit the site with all of us, the first row, 25 houses has been installed with ceramic tiles on ground floor's bed room, and the whole first floor...only living & kichen with porcelain...
Angry Owner 5
post Sep 16 2012, 03:00 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(woengx2 @ Sep 16 2012, 12:40 PM)
I'm not a owner or buyer for this project but just give my 2cent, hope it helps any owner or buyer.  tongue.gif

It is no point going to the project manager, as a project manager, he has already knew it.
The construction drawing with architectural specification laid down everything of what materials, sizes, colors, etc etc BEFORE the contractor execute the work.

Ask yourself how does the contractor got approval on laying the cheap ceramic tiles instead of porcelain tiles ?
*
I see i see, then must be the developer give the greenlight to the contractor.


Added on September 19, 2012, 11:54 pm
QUOTE(Angry Owner 5 @ Sep 16 2012, 03:00 PM)
I see i see, then must be the developer give the greenlight to the contractor.
*

Added on September 20, 2012, 12:10 am
QUOTE(Angry Owner 5 @ Sep 16 2012, 03:00 PM)
I see i see, then must be the developer give the greenlight to the contractor.


Added on September 19, 2012, 11:54 pm
*
S&P really stated family hall, bedroom 1,2,3 & guest with porcelain tiles...is this enough to argue with the contractor or developer? bikin x serupa cakap?

This post has been edited by Angry Owner 5: Sep 20 2012, 12:10 AM
Angry Owner 5
post Sep 23 2012, 03:11 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 22 2012, 04:45 PM)
This is sample of the 1 x 1 tiles from the site.

It's confirmed they use ceramic tiles.

I had ask some shop. This tiles already ex stock selling at RM1.80 for clearance and the problem is if one of this tiles broken, you may face problem to replace it.
*
Do u think we can file a suit or complain to the tribunal base on our S&P stated it was polished porcelain tiles and claim for compensation?

This post has been edited by Angry Owner 5: Sep 24 2012, 12:16 AM
Angry Owner 5
post Oct 3 2012, 01:08 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 30 2012, 07:15 PM)
i just went to the site of phase5 this afternoon... all those 1x1 tiles is confirmed ceramic as i did took a look on the sample tiles there.... at the back of the tiles clearly stated ceramic... about the 2x2 living room tiles.. i don't know how to identify whether if it is ceramic or procelain tiles...

i met with the site supervisor... he told me that the developer wants them to complete the whole phase on end of Oct... but according to him, it is impossible... the fastest he said will be by year end... now the are working 7 days a week to rush it..

btw, i received sms from acmar that they require my details for applying the tnb and syabas service.... anyone of you receive the same??
*
living and kitchen is porcelain...only first floor install with the damn ceramic, totally different from S &P...


Added on October 3, 2012, 1:12 am
QUOTE(snake4168 @ Oct 1 2012, 12:15 AM)
Yes, I did receive SMS as well. I think any complain have to wait when we all get the key & get RA to go to tribunal.

I did complain to Acmar, but they always no feedback. Always say the management will have meeting with main contractor.

Did you guys log a complain?!
*
do u think we shld go to their HQ in Klang and make hell of noise? cos i think once they put up the tiles...gone case lioa...

This post has been edited by Angry Owner 5: Oct 3 2012, 01:12 AM
Angry Owner 5
post Oct 4 2012, 10:54 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Oct 4 2012, 10:07 PM)
Is it government agency?
*
Tribunal Tuntutan Pembeli Rumah, agency who will and can help us...
Angry Owner 5
post Dec 5 2012, 12:21 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(boxbox8855 @ Dec 4 2012, 11:08 AM)
Tqvm Audrey.

But since their DLP is not over yet i"ll let them do their work first. If they can't do their job then i"ll do it myself and send the bill to them later.

TQ.
*
hopefully phase 5 and phase 6 wont be that bad la....phase 6 is consider luxury type...buyer all loaded ppl, if they delivered a cock up house, think those loaded guys wont simply let they go just like that...
Angry Owner 5
post Dec 12 2012, 12:03 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(yunalesca @ Dec 10 2012, 10:51 PM)
[attachmentid=3199362][attachmentid=3199364][attachmentid=3199365]
*
this page ppl talk bad about acmar, u dare to post phase 6 here? phase 4 and even phase 5 the workmanship really like shit, wall senget like hell, u can see from the floor skirting, ppl are losing confident towards acmar,....

This post has been edited by Angry Owner 5: Dec 13 2012, 11:01 PM
Angry Owner 5
post Dec 16 2012, 11:30 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 14 2012, 07:02 PM)
frankly speaking, buying from this developer is like buying proton car. definately will find many lemon here n there. This developer has same reputation, so dont expect high 'quality'.

But reputable developer or not, nowdays everywhere also the same. U go other developer projects, they too have their own issues. As long as your house doesnt leak, crack, flood, or worse, abandoned like the klang ones, count your blessing. This is unfortunately the reality.

Press the project ppl hard to fix any defects. It is their job and responsibility.

And never regret your decision. It may not be a good one but certainly not the worst. Impiana has a good location, and you cant easily find one in puchong with the same specifications at the same price.
*
did u own a unit @ impiana too?
Angry Owner 5
post Dec 17 2012, 10:45 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Dec 17 2012, 12:09 PM)
yes.. they didn't touch up the crack at the wall where the pillar is... i could see it in my house... will ask them to touch it up when got the key...
*
but in SnP it stated first floor fitted with percelain tiles, but in actual it is with ceramic tiles, how do we claim on this? and also, in future, anyone interested to set up a RA to take care of our community?

the current security is not function at all.
Angry Owner 5
post Dec 20 2012, 12:54 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 18 2012, 11:26 AM)
Agreed. RA is badly needed, current security is laughable for a taman this size. but heard that developer will construct brick fence (same to current brick fence) to enclave the whole taman c/w new guard house once phase 5 and 6 completed. Then we can have something like next door Meranti Jaya security, quite impressive. But that maybe another 3 or 4 years down the road.
*
if depends on this developer, then maybe no hope. they like to talk for 'song'
Angry Owner 5
post Dec 28 2012, 12:33 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 20 2012, 12:55 PM)
This is where RA comes in. It needs to stand and voice up for the residents. Afterall, RA is THE residents.

If RA is inactive, then there is really no hope.


Added on December 27, 2012, 6:06 pmacmar website got putra homes 7 already. 2 1/2 storey size 40x80. this one is where? i tot phase 6 is last phase cause really no more land already? isnt the empty land beside meranti factory belongs to meranti?

putra impiana seems very aggresive nowdays. phase 5 finishing and phase 6 piling already started. dont think they will abandon our taman.... good, at least we will have high class residential area within.
*
phase 7 is the empty opp. near to the lake / pylon.
Angry Owner 5
post Jan 9 2013, 12:13 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(zomba @ Jan 8 2013, 01:22 AM)
Guys - The house in phase 5 are purchased with a high price RM450K to RM680K and we all do expect good workmanship, good landscape and good guard house.

Can we all bring this up to acmar so that they can provide good landscape around our houses? At least our house will look more exclusive. I have the head of the project telephone number in which you can make suggestion to make our Taman look good as corresponding with the price purchased.

Site Manager - Kevin (016 661 1529)
*
when look at the phase 5 workmanship already damn 'dulan', like low cost flat finishing.....Fxxx them