Welcome Guest ( Log In | Register )

5 Pages « < 2 3 4 5 >Bottom

Outline · [ Standard ] · Linear+

 [WTS]Epoxy Flooring, PU flooring, Epoxy PU Coating, Seamless and hygine flooring system

views
     
wmwayne
post Nov 12 2014, 03:28 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2009


How much to do for house parking? About 400 sqft. Currently is tiles

This post has been edited by wmwayne: Nov 12 2014, 03:28 PM
TSerictoh
post Nov 17 2014, 09:11 PM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


QUOTE(wmwayne @ Nov 12 2014, 03:28 PM)
How much to do for house parking? About 400 sqft. Currently is tiles
*
You got pm
kitkat78_98
post Dec 11 2014, 12:22 PM

Getting Started
**
Junior Member
58 posts

Joined: Jun 2014


HI, can pm the pricing for epoxy? want to do for bathroom . Can show some picture lately for bathroom project that you do for residential bathroom ?
how is warranty period ? Estimation bathroom size around 40sqfeet
chlawcma
post Jan 13 2015, 04:55 PM

New Member
*
Newbie
1 posts

Joined: Jan 2015


May I have the price for epoxy flooring to the followings: -
1) Covered assembly area to school located at Kepong
2) Area to be applied approximately 1,200m2
3) After epoxy coating applied, can we draw court line on it?
4) Can you quote for drawing line to badminton court and basketball court?

alternative quoteation for PU flooring also needed.

please PM me.

thanks

fandi007
post Jan 19 2015, 04:56 PM

New Member
*
Junior Member
5 posts

Joined: Aug 2009
From: Bandar Baru Bangi


QUOTE(erictoh @ Jan 18 2013, 12:30 PM)
Need to have a site visit for more accurate quotation.
*
PM me if you need special material..., skill workers, lowest price material biggest coverage..
SUSDarrenTuTu
post Mar 9 2015, 06:18 PM

Getting Started
**
Junior Member
60 posts

Joined: Jul 2011


can pm me the price ?

need it for badminton flooring..
TSerictoh
post Apr 21 2015, 12:48 AM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


QUOTE(chlawcma @ Jan 13 2015, 04:55 PM)
May I have the price for epoxy flooring to the followings: -
1) Covered assembly area to school located at Kepong
2) Area to be applied approximately 1,200m2
3) After epoxy coating applied, can we draw court line on it?
4) Can you quote for drawing line to badminton court and basketball court?

alternative quoteation for PU flooring also needed.

please PM me.

thanks
*
Sorry for the late reply. You can PM me all the while to avoid any miss read to your reply.

Well, we do have PU Sport court system which is newly imported and recently we just done it at HUKM. It is polyurethane rubberise feels flooring system. Price is around R<15.50/ft2 for full system which is PU sport court top coated the moisture barrier system.

QUOTE(fandi007 @ Jan 19 2015, 04:56 PM)
PM me if you need special material..., skill workers, lowest price material biggest coverage..
*
We do have glossy type Epoxy System, Matte type PU system and rubberise type PU sport court. Also, the cheapest type will be the coating or painting 2 layers on primer layer.

QUOTE(DarrenTuTu @ Mar 9 2015, 06:18 PM)
can pm me the price ?

need it for badminton flooring..
*
Your answer is as above. Sport court system. Thanks.

This post has been edited by erictoh: Apr 21 2015, 01:03 AM


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image
MandyKJ
post Jun 21 2015, 10:43 PM

New Member
*
Junior Member
10 posts

Joined: Jun 2011


Hi,how much is it per sq foot? pm me the price pls.

And what is the different with our home tiles? Suitable for wet kitchen n car p?
subaiku
post Aug 11 2015, 03:00 PM

Casual
***
Junior Member
445 posts

Joined: Oct 2008
Hi Eric,

May I ask if you guys also do residential? Can you give me a quote for 1500sqft, indoor condo. Matt surface. Can you achieve something like this?

Attached Image
zenix
post Aug 12 2015, 11:21 AM

Pirate Captain
*******
Senior Member
6,249 posts

Joined: Jul 2006
i just notice something
the green stuff on my warehouse floor is also a type of epoxy flooring
how come it is sticky type but the ones inside buildings arent
TSerictoh
post Aug 12 2015, 03:10 PM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


QUOTE(subaiku @ Aug 11 2015, 03:00 PM)
Hi Eric,

May I ask if you guys also do residential? Can you give me a quote for 1500sqft, indoor condo. Matt surface. Can you achieve something like this?

Attached Image
*
From the picture it's looked like glossy type Epoxy Self levelling Flooring system. For SL itself the cost will be around RM6.50 to 8/ft2 depend on existing floor condition.

QUOTE(zenix @ Aug 12 2015, 11:21 AM)
i just notice something
the green stuff on my warehouse floor is also a type of epoxy flooring
how come it is sticky type but the ones inside buildings arent
*
Can you snap a picture and show me? Let me see what i can assist u.
zenix
post Aug 12 2015, 03:19 PM

Pirate Captain
*******
Senior Member
6,249 posts

Joined: Jul 2006
sort of like the picture above in green fllooorr
TSerictoh
post Sep 1 2015, 04:50 PM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


If you found your coating is forever in sticky condition, it may due to the wrong ratio mixing between the epoxy and hardener.
sahrulz2558
post Sep 16 2015, 08:33 PM

New Member
*
Newbie
1 posts

Joined: May 2008
From: kuantan


hi,

Can you provide me the quotation Metallic Epoxy Floor for 20 x 70 floor space. It will be use for retail shop.

Thanks.
TSerictoh
post Sep 27 2015, 12:00 AM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


Metallic epoxy with moisture barrier system is charging at RM25/ft2
Mob and demob RM800
cwongqf
post Oct 13 2015, 09:02 AM

New Member
*
Junior Member
30 posts

Joined: May 2011
Hi, i'l looking to coat a patch of my warehouse with expoxy.

Dimensions:
35m x 3.5m

Area to withstand movement of 1.5 ton forklift truck carrying 1 ton of weight.

Similarly, do you do expoxy for warehouse walkways?

My contact: [Mr. Wong: 012-509 2166]
bobowyc
post Nov 11 2015, 05:58 PM

You are who you are.
******
Senior Member
1,921 posts

Joined: Apr 2013
From: Petaling Jaya


Hi, can you quote me for car park with size 22ft x 35ft, roughly 770sqft. Does the concrete floor have to be smooth? Or do i do a smooth layer before applying the epoxy? Thanks.

This post has been edited by bobowyc: Nov 11 2015, 05:59 PM
TSerictoh
post Nov 11 2015, 08:16 PM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


QUOTE(cwongqf @ Oct 13 2015, 09:02 AM)
Hi, i'l looking to coat a patch of my warehouse with expoxy.

Dimensions:
35m x 3.5m

Area to withstand movement of 1.5 ton forklift truck carrying 1 ton of weight.

Similarly, do you do expoxy for warehouse walkways?

My contact: [Mr. Wong: 012-509 2166]
*
Hi Mr. Wong,
122.5m2 of warehouse flooring you can do either epoxy SL topciated moisture barrier system at RM9.50/ft2 or Epoxy Coating Top coated moisture barrier system at RM7/ft2. Both charge RM800 mobilization cost at RM800 for local job.

Thanks.

QUOTE(bobowyc @ Nov 11 2015, 05:58 PM)
Hi, can you quote me for car park with size 22ft x 35ft, roughly 770sqft. Does the concrete floor have to be smooth? Or do i do a smooth layer before applying the epoxy?  Thanks.
*
You can do our Epoxy Car Park system with moisture barrier system at RM8/ft2 with mobilization cost RM800
bobowyc
post Nov 12 2015, 07:19 PM

You are who you are.
******
Senior Member
1,921 posts

Joined: Apr 2013
From: Petaling Jaya


Hi, may I know what do you mean by "moisture barrier system"? Can you explain further? Thanks.
TSerictoh
post Nov 17 2015, 01:57 AM

Getting Started
**
Junior Member
138 posts

Joined: Sep 2006


QUOTE(bobowyc @ Nov 12 2015, 07:19 PM)
Hi, may I know what do you mean by "moisture barrier system"? Can you explain further? Thanks.
*
Ok, fine. Epoxy coating or Epoxy Self-levelling top coat is formed by a very tight polymer cross-linking fiber like and therefore it is very good for water and oil resistance. Yet, by the mean while the under ground pressure may causing the moisture below raise up eventually and cause the coating or SL "pop' up and broken or peeling off easily. That's the reason why you can alway see those people who simple buy few pails of epoxy paint and paint themselves at their ship floor and end up peeling off seriously.

This is the reason why we apply the moisture barrier system before we casting either epoxy coating or any high end top coat.

This post has been edited by erictoh: Nov 17 2015, 01:59 AM

5 Pages « < 2 3 4 5 >Top
 

Change to:
| Lo-Fi Version
0.0312sec    0.48    6 queries    GZIP Disabled
Time is now: 26th November 2025 - 12:39 PM