QUOTE(davinz18 @ May 31 2014, 10:39 PM)
SIPP-YTL-Tenaga JV picked for 1,000MW Johor power plant job
The consortium will develop a fast track combined cycle power plant (CCGT) using proven technology with a capacity of 1,000 MW to 1,400 MW in Pasir Gudang. This was on condition the technical and commercial proposals were acceptable to commission.
“The levelised tariff that may be considered competitive must be comparable to the Prai CCGT tender exercise concluded in 2012,” it said.
http://www.thestar.com.my/Business/Busines...ower-plant-job/
good or not...?The consortium will develop a fast track combined cycle power plant (CCGT) using proven technology with a capacity of 1,000 MW to 1,400 MW in Pasir Gudang. This was on condition the technical and commercial proposals were acceptable to commission.
“The levelised tariff that may be considered competitive must be comparable to the Prai CCGT tender exercise concluded in 2012,” it said.
http://www.thestar.com.my/Business/Busines...ower-plant-job/
Jun 9 2014, 12:04 AM

Quote
0.0277sec
0.91
6 queries
GZIP Disabled