Step 1 - Remove weeds and leftover stone.
Step 2 - Put fine sand and do leveling. After that, I spray weed killer and leave it for a few days.
I put full for right and half for left because I will put tiles and do awning at the remaining of left side. I need around 3 yards of sand and it cost me RM55 x 3 = RM165
It does not totally kill all weeds i think due to rain season.
Step 3 - Bought pearl grass at Bukit Mertajam, cost me RM2 per 2 x 1 feet including send it to my house.
I bought 260 pieces for right side (80 x 7). The grass a bit dirty because rain almost everyday here. I put at the right side first.
Step 4 - Install it myself. Took me around 3 hours, really gave pain to my back
Cost
- Fine sand RM55 x 3 = RM165
- Grass RM2 x 260 = RM520 (right)
- Grass RM2 x 170 = RM340 (left)
I havent put at the left side, afraid it cant survive during renovation work, workers will step on it. I will update the result after a week
This post has been edited by wadieq: Oct 13 2015, 10:14 PM
Oct 13 2015, 09:24 PM
Quote
0.0253sec
0.47
7 queries
GZIP Disabled