QUOTE(soulistic @ Sep 1 2013, 08:50 PM)
I work in Sunway, basically sunway geo does the piling work for most of sunway construction's project. E.g. mrt, pinnacle, velocity..
so they won't ask Econpile or some other piler to do the job normally?Everthing About Working in Sunway Group, Everything except the kitchen sink
|
|
Apr 21 2024, 08:48 PM
Return to original view | IPv6 | Post
#1
|
![]() ![]() ![]()
Junior Member
453 posts Joined: Mar 2015 |
|
| Change to: | 0.0158sec
0.66
6 queries
GZIP Disabled
Time is now: 4th December 2025 - 06:57 AM |