*Removed*
This contractor's quotation was very expensive.
Found another one ...
This post has been edited by Lohtcing: Oct 24 2008, 01:55 PM
Pls review my condo refurbishment quotation
Pls review my condo refurbishment quotation
|
|
Oct 6 2008, 10:01 PM, updated 16y ago
Show posts by this member only | Post
#1
|
![]() ![]()
Junior Member
98 posts Joined: Jul 2008 |
*Removed*
This contractor's quotation was very expensive. Found another one ... This post has been edited by Lohtcing: Oct 24 2008, 01:55 PM |
|
|
|
|
|
Oct 7 2008, 12:06 AM
Show posts by this member only | Post
#2
|
![]() ![]() ![]() ![]() ![]()
Senior Member
859 posts Joined: Apr 2006 From: Binary World |
overall...luks kinda expensive to me
|
|
|
Oct 7 2008, 12:42 AM
Show posts by this member only | Post
#3
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,318 posts Joined: Dec 2004 From: 1Malaysia |
super EX..............think u r being ripped-off.
h, painting work with ICI paint for whole area of condo (paint included) RM5500 My mum recently painted her 3-storey house (inside and outside) for less than 3k. |
|
|
Oct 7 2008, 03:00 AM
Show posts by this member only | Post
#4
|
![]() ![]()
Junior Member
192 posts Joined: Jan 2003 |
expensive. scout around for multiple quotes
|
|
|
Oct 7 2008, 03:03 AM
Show posts by this member only | Post
#5
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
21,963 posts Joined: Dec 2004 From: KL |
QUOTE(Pai @ Oct 7 2008, 12:42 AM) super EX..............think u r being ripped-off. RM5k can already paint whole bungalow...h, painting work with ICI paint for whole area of condo (paint included) RM5500 My mum recently painted her 3-storey house (inside and outside) for less than 3k. And demolishing arent that expensive either... And plumbing and installing shower arent that expensive either... |
|
|
Oct 7 2008, 04:03 AM
Show posts by this member only | Post
#6
|
![]() ![]()
Junior Member
226 posts Joined: Apr 2005 From: Penang |
I'll hire 2 bangla with 500, paint cost ard 500 and I charge you 4k...hows tat?
|
|
|
|
|
|
Oct 7 2008, 09:43 AM
Show posts by this member only | Post
#7
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2007 |
workmanship is important as well, be careful in selecting the cheapest quote given to you. i cant really comment on the price given, but my advise is you have a look at his past work to see how is his work. would be better if you know someone who has actually has his house done by him
|
|
|
Oct 7 2008, 10:45 AM
Show posts by this member only | Post
#8
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,528 posts Joined: Jan 2003 From: Penang |
I recently being quoted something like this. You can take this as reference. Area Butterworth.
Remove and install toilet tiles - wall and floor (not include tiles only) - RM 1600 per toilet Water Proofing - RM 250 per toilet Installing water heater, new bowl, new mixer for both toilet - RM 500 Painting work 1000 sq feet house (include paint) - RM 1600 Above quotation is after I review 3-4 quotation. |
|
|
Oct 7 2008, 06:02 PM
Show posts by this member only | Post
#9
|
![]() ![]() ![]() ![]() ![]()
Senior Member
859 posts Joined: Apr 2006 From: Binary World |
|
|
|
Oct 7 2008, 06:31 PM
|
![]() ![]()
Junior Member
158 posts Joined: Sep 2008 |
you should find someone else who are in that particular field as well to make another quotation for you, then you will know
|
|
|
Oct 7 2008, 06:46 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,979 posts Joined: Jan 2003 From: Kuala Lumpur |
QUOTE(Lohtcing @ Oct 6 2008, 10:01 PM) Dude most of the charges are freaking expensive... Esp. the paint job you should only be paying half or less for the paint job. It’s hard to gauge prices between 2 different because different contractors might go about doing the same things differently and with different materials. Furthermore it’s an unregulated business so buyer beware... My advice is get a quote with a bill of materials (so you wont get a BOMB afterwards), then contact the contractors past customers to discover their pain points and judge the workmanship and quality of work for yourself. This post has been edited by aaronpang: Oct 7 2008, 06:59 PM |
|
|
Oct 7 2008, 07:38 PM
|
![]() ![]()
Junior Member
98 posts Joined: Jul 2008 |
Thanks for all the replies.. This post has been edited by Lohtcing: Oct 5 2010, 10:41 AM |
|
|
Oct 7 2008, 07:53 PM
|
![]() ![]() ![]() ![]()
Senior Member
698 posts Joined: Jan 2003 |
h, painting work with ICI paint for whole area of condo (paint included)
include : living room, dining area, 2 bedroom, exclude kitchen RM5500 <-- expensive? think u can get 1/2 price from others |
|
|
|
|
|
Oct 7 2008, 07:56 PM
|
![]() ![]()
Junior Member
98 posts Joined: Jul 2008 |
really? seem like the reasonable quote should be half of this!
ARGHHH... when come to business.. even fren cant be trusted... |
|
|
Oct 7 2008, 07:58 PM
|
![]() ![]()
Junior Member
226 posts Joined: Apr 2005 From: Penang |
QUOTE(asciii @ Oct 7 2008, 06:02 PM) Juz stop any bangla you see on the road or go to construction yard...deal with the supervisor or in Penang, you can find them congregating at Komtar. Or you can interogate your indon maid....she'll crack under pressure But seriously, if any of you want to DIY, do at least hire a qualified painter as paint job is suppose to last you for >10 years. |
|
|
Oct 7 2008, 10:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,175 posts Joined: Sep 2006 From: PJ SS 2 |
|
|
|
Oct 24 2008, 12:55 PM
|
![]()
Junior Member
7 posts Joined: Jul 2008 |
QUOTE(Lohtcing @ Oct 6 2008, 10:01 PM) Hi i do have some bangla workers if you interested , you can contact 012-288 9014 and he will assit u with the workers, they can do plumbing and electrical works.Can you please have a look and comment on this quotation? Is this reasonable? This contractor is my fren's uncle..... My condo is around 1100 sq ft, with 2 bedrooms, 2 toilet (one attached to master bedroom) Master bedroom toilet is 52sq ft (floor), wall 205 sq ft (wall tiles) total 257 sq ft Guest toilet is 38 sq ft (floor), wall 196 sq ft (wall tiles) total 234 sq ft a, to demolish existing 2 bathrooms floor and wall tiles, cabinet, bath tub, shower screen including cleaning RM2800 e, to install floor and wall tiles for 2 bathroom (not include tiles) RM2800 b, Water proofing work for 2 bathrooms RM900 c, Replastering and flooring for 2 bathrooms RM1400 f, plumping work for dismantle existing shower mixer and install new shower mixer for 2 n.o.s (shower mixer not included ) RM1200 g, to install toilet bowl and washing basin for 2 bathrooms (not include bowl) RM600 --------------------------------------------------------------------------- h, painting work with ICI paint for whole area of condo (paint included) include : living room, dining area, 2 bedroom, exclude kitchen RM5500 <-- expensive? i, dismantle existing flooring skirting and make good to wall (because I will install laminated flooring from Robina, around RM5800 for 979sq ft (average RM4.60/sq.ft) RM350 j, to demolish one small wall (2 feet x 7 feet ) , one door and one door frame including cleaning, make good to wall (it is actually a door to my master bedroom balcony, I have covered the area up, to be part of my master bedroom) RM1600 k, to refurbish built-in cabinet for 2 bedrooms and cabinet at living room (repaint the exterior of 12 x 9 cabinet , 7 x 9 cabinet, 7 x 8 bed frame and bar table) RM1400 l, tiling work for balcony (not include tiles) - balcony is around 35sq ft RM200 Total amount RM19,950 |
| Change to: | 0.0185sec
0.93
5 queries
GZIP Disabled
Time is now: 19th December 2025 - 06:21 AM |