QUOTE(bengang14 @ Oct 16 2014, 05:50 PM)
Hi Guys,
just want to share my 3-phase wiring.
TNB contractor just came and did the connection. now waiting for TNB to install the meter..
Total charges
Connection Fee:RM1,250
Runner/Consultant fee: RM450
Stamp Duty:RM10
Topup deposit: RM200
well if you ask me, its quite a shoddy job. can see the wire all coming out
but they say standard. also i thought teh connection is a tad to low..


Hi, wanted to know how the cables were pulled from your meter fuse to the switch box inside your house. Usually for a double story house, the switch box is located in a small store room under a staircase. My understanding is that two additional cables will need to be pulled from the meter fuse (usually outside the house) to your switch box (I may be wrong...), going through the car porch, living hall, till the store room. If this is the case, will it be a big messy hacking need to be done?just want to share my 3-phase wiring.
TNB contractor just came and did the connection. now waiting for TNB to install the meter..
Total charges
Connection Fee:RM1,250
Runner/Consultant fee: RM450
Stamp Duty:RM10
Topup deposit: RM200
well if you ask me, its quite a shoddy job. can see the wire all coming out
but they say standard. also i thought teh connection is a tad to low..


Appreciate if you could also PM the contact of your contractor, thank you!