QUOTE(supersound @ Sep 14 2014, 06:03 PM)
19 years already, guess you better plan for a renovation work. Then no need to be that messy.
The existing wires also almost time.
Haha. My house will perform 3rd renovation within 2 years as I add another room on the house. That's why I need to do a homework before upgrading
QUOTE(weikee @ Sep 14 2014, 06:07 PM)
Tap from the poles need more work, and will cost you substantial too. Meter need to be outside.
Do yoi know your current main fuse ratting is? 32 or 63?
If your house only have 10+- MCB, no point adding 3 phases. You need to know what is your average load, and what is your peak load. Is the peak load that are important.
Yep. This part actually a bit hassle for me. I dont know my current load my of of the time ;
6 PC 24/7, 3 led tv, 2 refrigerator,2 aircon. with additional 2 aircon , 1 more fridge and 1 WH after renovation done