Renovations 3-phase wiring

views
     
gilabola
post Nov 20 2021, 12:34 PM

On my way
****
Senior Member
669 posts

Joined: Jan 2005


Duplicate post. Sorry

This post has been edited by gilabola: Nov 20 2021, 12:39 PM
gilabola
post Nov 20 2021, 12:34 PM

On my way
****
Senior Member
669 posts

Joined: Jan 2005


Duplicate post. Sorry

This post has been edited by gilabola: Nov 20 2021, 12:39 PM
gilabola
post Nov 20 2021, 12:35 PM

On my way
****
Senior Member
669 posts

Joined: Jan 2005


Duplicate post. Sorry

This post has been edited by gilabola: Nov 20 2021, 12:48 PM
gilabola
post Nov 20 2021, 12:35 PM

On my way
****
Senior Member
669 posts

Joined: Jan 2005


While renovating my house, my contractor said the 3 phase DB Box had sparks. He recommends replacing the part circled at a cost of RM500. I'm wondering if the contractor is trying to pull a fast one

Any advise if the cost is reasonable

This post has been edited by gilabola: Nov 20 2021, 12:51 PM


Attached thumbnail(s)
Attached Image
gilabola
post Nov 20 2021, 03:44 PM

On my way
****
Senior Member
669 posts

Joined: Jan 2005


QUOTE(stormer.lyn @ Nov 20 2021, 01:55 PM)
Nope, doesn't sound right that the Neutral busbar needs to be replaced. If it is sparking why not just redo and tighten back the screw terminals? If an individual screw terminal is damaged, why not just move the slot, as you have so many empty ones?
(FYI I am not an end user just giving my so called "opinion", but a tech in the industry)
*
Many thanks, stormer.lyn. notworthy.gif

Even if the contractor needed to replace it, the busbar costs less than RM50 (see link below). No way it would cost RM500

https://shopee.com.my/THREE-Phase-MCB-Coppe...0951.4233122116

This post has been edited by gilabola: Nov 20 2021, 03:45 PM

 