QUOTE(sonypshomer @ Jan 14 2019, 10:18 AM)
TNB just did my 3 phase around RM2.5k
But i have to pay extra since i want my meter to be outside the gate and the cable pull directly from the post (not from neighbor)
With waterproof housing and installation around RM1K
Upgrade from Single to 3 phases?But i have to pay extra since i want my meter to be outside the gate and the cable pull directly from the post (not from neighbor)
With waterproof housing and installation around RM1K
Jan 14 2019, 06:36 PM

Quote
0.0306sec
0.64
7 queries
GZIP Disabled