QUOTE(afieza_ariffin @ Apr 22 2011, 04:03 PM)
last 4 years my plaster ceiling for whole house (double storey 2000sqft) only cost me rm4k including wiring... 
my contractor didnt take out the original ceiling, they just pull out ermm what we call it arrr... "rangka?" ceiling (kayu in between every board)..
so if there is a water leakage it will not directly effect my plaster ceiling (i hope
)
Added on April 22, 2011, 4:14 pmPlaster ceiling is the 1st things u should do after wiring b4 u move in your new house.. dust from plaster ceiling not easy to clean up... i need to hire pro cleaner to do the cleaning..
your contractor is lowering your ceiling height at least 4 to 6 inch. Your light fitting do not have air ventilation. All heat is trap between the 2 ceiling void area.my contractor didnt take out the original ceiling, they just pull out ermm what we call it arrr... "rangka?" ceiling (kayu in between every board)..
Added on April 22, 2011, 4:14 pmPlaster ceiling is the 1st things u should do after wiring b4 u move in your new house.. dust from plaster ceiling not easy to clean up... i need to hire pro cleaner to do the cleaning..
Apr 23 2011, 01:17 AM

Quote
0.0214sec
0.37
7 queries
GZIP Disabled