QUOTE(asciii @ Mar 15 2008, 06:00 PM)
sry..gona tumpang this thread abit..
I am planning to do plaster ceiling and timber flooring for my living room..which one should I start first?ceiling or flooring? Also, after the plaster ceiling is done, say in the future i have some A/V equipments and I want the wiring to go through the plaster ceiling, is it possible? If yes, how?
I'd say do the flooring last because you do not want the ceiling works to leave dirt and stains on the floor.I am planning to do plaster ceiling and timber flooring for my living room..which one should I start first?ceiling or flooring? Also, after the plaster ceiling is done, say in the future i have some A/V equipments and I want the wiring to go through the plaster ceiling, is it possible? If yes, how?
Hmm... probably easier if you get the wiring laid first above the plaster ceiling. Once your plaster ceiling is installed it's hard for the AV installer to lay the cables unless he cuts a large access hole in your plaster ceiling.
Mar 29 2008, 10:32 AM

Quote
0.0272sec
0.81
7 queries
GZIP Disabled