QUOTE(Jo_da48 @ Jul 29 2011, 08:10 AM)
The Indo contractor just start laying the structure and already hit problem, as the electric pipe is too low (1 feet plus from top), which cause the structure need to lower, and because of this, the aircorn can't fill into design area 
Now need to electric folk to jack his pipe line (3 of it) up 6inch to same level with the rest of pipe line which involved hacking again.
So guess please make sure your electrian put the conceal pipe as high as possiable and dont assuming all will be same level
Yea, i also face your problem too, all this minor thing will always get us stuck, so just have to be very tedious sometimes, very tiring right Now need to electric folk to jack his pipe line (3 of it) up 6inch to same level with the rest of pipe line which involved hacking again.
So guess please make sure your electrian put the conceal pipe as high as possiable and dont assuming all will be same level