Dear fellow member,

Currently my house is doing renovation and engaging different contractors to do. But I m confusing with the order/sequence of the following job to be done as follow:-

1). Wood polishing 1st layer varnish -it will produce enormous amount of wood dust.

2). Painting whole house.

3). Wood polishing -2nd layer varnish (produce only some wood dust)

4). Install custom-made wardrobe.

Is the above sequence correct ? Because the wood polishing contractor said the wood polishing should be done before installing wardrobe otherwise the wood dust might be spreading everywhere. But the wardrobe maker said that it should be done before wood polishing and painting.

Your advise is very much appreciated.
firee818
post Aug 20 2010, 08:07 AM

Regular
******
Senior Member
1,205 posts

Joined: Jan 2010


QUOTE(lizziewong @ Aug 19 2010, 11:09 PM)
I have only done step 1 and 2 so far.

My timber floor installer advise is:
1. Polish the floor (yes alot of dusst!)
2. Paint (if u want, can have painting done - but top 2 final coats must do after 1)
3. All build in to be installed
4. final buffing and last coating to apply, plus install skirtings.  Apparently, this can be completed within 1 day. Few hours time already can move in!!!