QUOTE(Ayambetul @ Sep 15 2025, 11:10 AM)
Well, not sure about TNB and Suruhanjaya Tenaga, but in Sarawak here...https://lawnet.sarawak.gov.my/lawnet_file/O...wNet%202024.pdf
QUOTE
Provided that if the precise date when the meter was tampered or
damaged or when the supply line, apparatus or system was tampered,
altered or adjusted could not be ascertained by the licensee, the
amount of that loss shall not exceed five times the total amount of
energy, that is estimated by the licensee to have been lost or
dishonestly abstracted or consumed by the consumer, for a period of
thirty-six months prior to the date of discovery of the acts referred to
in paragraphs (a) and (b).
damaged or when the supply line, apparatus or system was tampered,
altered or adjusted could not be ascertained by the licensee, the
amount of that loss shall not exceed five times the total amount of
energy, that is estimated by the licensee to have been lost or
dishonestly abstracted or consumed by the consumer, for a period of
thirty-six months prior to the date of discovery of the acts referred to
in paragraphs (a) and (b).
Basically, they will measure the amount of power flowing into the property before starting the whole disconnection and confiscation operation.
Sep 15 2025, 11:18 AM

Quote
0.0185sec
0.45
6 queries
GZIP Disabled