QUOTE(RT8081 @ Jun 3 2025, 11:27 AM)
U sure trust them to do wiring without following our local laws ? If fire happen and bomba investigate, say GG to your insurance claim lol
hmmm talking about it , plenty of our local contractor wanna save cost then use the non sirim certified 3 Phase electric cable.. can save the cost up to 50% .. one roll about RM60 , but MEGA cable is around RM120. If insurance company find out, will void insurance claim ? lol.
Jun 3 2025, 02:24 PM

Quote
0.0245sec
0.63
6 queries
GZIP Disabled