QUOTE(imperia70 @ Aug 24 2024, 12:20 PM)
Yes EU aldy login lolWoman falls into 8-meter deep sinkhole in KL, search and body recovery called off
Woman falls into 8-meter deep sinkhole in KL, search and body recovery called off
|
|
Aug 24 2024, 12:26 PM
Return to original view | IPv6 | Post
#1
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
|
|
|
|
|
|
Aug 24 2024, 12:28 PM
Return to original view | IPv6 | Post
#2
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
Scuba diving team gonna dive in the sewage pipe to pull her out, but they believe she was push in very far since the water flow too long time with mud together
This post has been edited by bereev: Aug 24 2024, 12:29 PM |
|
|
Aug 24 2024, 12:31 PM
Return to original view | IPv6 | Post
#3
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
Explained This post has been edited by bereev: Aug 24 2024, 12:38 PM |
|
|
Aug 24 2024, 01:58 PM
Return to original view | IPv6 | Post
#4
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
|
|
|
Aug 24 2024, 02:01 PM
Return to original view | IPv6 | Post
#5
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
KL sewage system are linked to Pantai beside NPE hope the body not found there
|
|
|
Aug 24 2024, 02:57 PM
Return to original view | IPv6 | Post
#6
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
|
|
|
|
|
|
Aug 24 2024, 02:58 PM
Return to original view | IPv6 | Post
#7
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
|
|
|
Aug 24 2024, 05:28 PM
Return to original view | IPv6 | Post
#8
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
QUOTE(Roadwarrior1337 @ Aug 24 2024, 05:23 PM) Respect Japan and Korea and sinkie You sure no issue or you just ignore it They build underground city with not much issue Goes to show barang buatan Malaysia quality Japan let you think they doesn't have much sink hole because they are frequently earth quake, thouse should be sink aldy sink during earth quake SG This post has been edited by bereev: Aug 24 2024, 05:35 PM headache and countingcrows liked this post
|
|
|
Aug 26 2024, 09:47 AM
Return to original view | IPv6 | Post
#9
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
|
|
|
Aug 26 2024, 10:33 AM
Return to original view | IPv6 | Post
#10
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
QUOTE(rcracer @ Aug 26 2024, 10:08 AM) If you know sewer stations got many lift stations due to changing topography, gravity is your friend, the plan is to always use gravity to gather the sewage into one giant underground well and then pump up to treatment plant. If floating lagi susah it sure will stuck at some section alont the line , they gonna open one by one the manhole along whole line , bare in mind it may stuck and back flow to the private building manhole. If the victim ended in one of those normally is sink first before decomp and float back up , however it's still not easy to recover if assuming is not being held down by the pump suction already Our sewage system are open type , which means the line will mix with rain water it cloud be back flow to lower area then flow back to the line during water low |
|
|
Aug 26 2024, 02:15 PM
Return to original view | IPv6 | Post
#11
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
nelson969 liked this post
|
|
|
Aug 27 2024, 11:24 AM
Return to original view | IPv6 | Post
#12
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
QUOTE(hoonanoo @ Aug 27 2024, 09:56 AM) they just covered up the manhole: it appears so. That is the problem when open tender , ppl will coose the cheap for repair, and the contractor see bigger problem they have to do it cheap way, they are not going to pay extra for the job, if they can't do it they have to get penalty because void of contract cannot finish job.Without rectifying the issue. If its really got negligence involved, and if this is true, I really hope n pray there is no cover up and the contractors will get the full order of the law for such tidak apa attitude work. The main problem is the one who ask for tender need to know what happened and what to give out tender, if the BQ just ask to repair the sink hole then all the job are fail before it start. |
|
|
Aug 27 2024, 06:16 PM
Return to original view | IPv6 | Post
#13
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
We still got this machine ?
![]() |
|
|
Sep 2 2024, 09:07 AM
Return to original view | IPv6 | Post
#14
|
![]() ![]()
Junior Member
257 posts Joined: Dec 2011 |
QUOTE(genesic @ Sep 1 2024, 10:07 AM) Yes. That mega sewage treatment plant—the largest in Asia Pacific and full underground. Above have a 12 hectare public park, Pantai Eco Park and community centre. This is the new treatment plant , intake at opposite, build 10 years ago, there are 5 massive pipe line cross the 6 lane NPE to the treatment plant![]() ![]() |
| Change to: | 0.0814sec
1.46
7 queries
GZIP Disabled
Time is now: 17th December 2025 - 02:25 AM |