 YTL Power 's data center park in Kulai, Johor, Where is the exact location?

views
     
SUSBlackscreamerz
post Mar 5 2024, 12:05 AM

Getting Started
**
Junior Member
121 posts

Joined: Apr 2011



QUOTE(submergedx @ Mar 4 2024, 10:08 PM)
Sedenek full of poultry farms and sawit farms, construction factories, got Data Centre? which part yar?
*
https://www.google.com/maps/place/Sedenak+T...b6xzj?entry=ttu
Mattrock
post Mar 5 2024, 12:20 AM

Casual
***
Junior Member
395 posts

Joined: Dec 2017
These data centers will eventually destroy the planet with its energy consumption.
h@ksam
post Mar 5 2024, 12:23 AM

@ is a
*******
Senior Member
3,460 posts

Joined: Nov 2009
From: KL
QUOTE(Mattrock @ Mar 5 2024, 12:20 AM)
These data centers will eventually destroy the planet with its energy consumption.
*
nahhh, their energy source will be replaced

user posted image
Mavik
post Mar 5 2024, 09:36 AM

Patience is a virtue
Group Icon
Elite
7,826 posts

Joined: Jan 2003



QUOTE(xarmx @ Mar 4 2024, 11:11 PM)
Most probably in Sedenak Tech Park. I'm working in K2, already got Bridge DC and Keppler DC here, and seems like got other planned DC to be constructrd here too. Airtrunk, GDS in Nusajaya.
*
I heard that Bytedance is setting up a DC as well in Johor, do you know where it is?
Mavik
post Mar 5 2024, 09:37 AM

Patience is a virtue
Group Icon
Elite
7,826 posts

Joined: Jan 2003



QUOTE(Blackscreamerz @ Mar 5 2024, 12:05 AM)
LOL at the photo when I clicked on Kulai Industrial Data Exchange
SUSBlackscreamerz
post Mar 5 2024, 09:40 AM

Getting Started
**
Junior Member
121 posts

Joined: Apr 2011



QUOTE(Mavik @ Mar 5 2024, 09:37 AM)
LOL at the photo when I clicked on Kulai Industrial Data Exchange
*
Still new ma. haha. All industrial areas starts as hutan. lol
xarmx
post Mar 5 2024, 07:26 PM

Look at all my sta........
****
Senior Member
559 posts

Joined: Mar 2009
QUOTE(Mavik @ Mar 5 2024, 09:36 AM)
I heard that Bytedance is setting up a DC as well in Johor, do you know where it is?
*
That's gonna be K2. I believe one of the tenants

xarmx
post Mar 5 2024, 07:28 PM

Look at all my sta........
****
Senior Member
559 posts

Joined: Mar 2009
QUOTE(plouffle0789 @ Mar 4 2024, 11:51 PM)
How many locals will get employed once the data centres completed?
Any foreigners worker?
*
DCs are known to have very few worker. And its mostly building maintenance so not much imho. Unless its DC like AWS or other cloud provider. That one gonna have a lot of IT hardware team
rcracer
post Mar 5 2024, 08:18 PM

?????
*******
Senior Member
3,772 posts

Joined: Jan 2003

TNB need to buck up , many many plants always trip and almost die the country , just nobody reporting it
TSplouffle0789
post Mar 14 2024, 11:32 PM

Regular
******
Senior Member
1,836 posts

Joined: May 2010

QUOTE(Zhik @ Mar 4 2024, 08:29 AM)
If not mistaken it is very deep inside the palm oil land .remote area.
*
Microsoft also come to invest at kulai
Zhik
post Mar 15 2024, 09:28 AM

eeerrrmmmnnn, stupidity has no limit?
******
Senior Member
1,228 posts

Joined: Nov 2012
QUOTE(plouffle0789 @ Mar 14 2024, 11:32 PM)
Microsoft also come to invest at kulai
*
They are there before nvidia.
Anyway, this is merely data center which created not much free flow money in the market. Those IT are not high pay, doesnt need more workers, cant compare to RnD center

This post has been edited by Zhik: Mar 15 2024, 09:29 AM
TSplouffle0789
post Feb 19 2025, 01:38 AM

Regular
******
Senior Member
1,836 posts

Joined: May 2010

QUOTE(Zhik @ Mar 15 2024, 09:28 AM)
They are there before nvidia.
Anyway, this is merely data center which created not much free flow money in the market. Those IT are not high pay, doesnt need more workers, cant compare to RnD center
*
QUOTE
NOTICE IS HEREBY GIVEN that the Tenth (10th) Annual General Meeting (“AGM”) of Ranhill Utilities Berhad (“Ranhill” or “the Company”)
will be held on 25 June 2024, Tuesday at 2.30 p.m. at Ballroom 1 & 2, Intercontinental Kuala Lumpur, 165, Jalan Ampang, 50450 Kuala
Lumpur o


https://www.ytlhotels.com/resorts-and-hotels

2025 AGM should be held at JW MARRIOTT KUALA LUMPUR or THE RITZ-CARLTON, KUALA LUMPUR

YTL Power acquiring control of Ranhill Utilities

Jun 4, 2024

Analysts view the move positively, noting potential synergies for YTL Power, particularly in water operations and RE

YTL Power International Bhd is on fire. Just recently, the power utility and infrastructure group was in the news for its involvement in advanced data centre projects. Linked to that is the artificial intelligence (AI) wave.

Now, the utilities arm of YTL Corp Bhd made another big corporate manoeuvre when it moved in to take a controlling stake in Ranhill Utilities Bhd. It has scooped up the shares related to Tan Sri Hamdan Mohamad for RM405.2 million in a move that will see it making an offer for the remaining shares that it does not own.

In an exchange filing on May 28, YTL Power said its indirect 70%-owned subsidiary, SIPP Power Sdn Bhd, will be paying 99.5 sen per Ranhill Utilities share in the corporate move.

It said SIPP Power had entered into an unconditional share purchase agreement with Hamdan, Hamdan Inc (Labuan) Pte Ltd and Hamdan (L) Foundation for the acquisition of 405.18 million existing ordinary shares in Ranhill Utilities representing a 31.42% equity interest in Ranhill Utilities, together with 2.03 million Ranhill Utilities shares to be issued pursuant to the share dividend, for total cash consideration of RM405.18 million. Hamdan is the sole beneficiary of Hamdan Foundation, which was a major shareholder of Ranhill Utilities.

The acquisition bumps up YTL Power’s holding in Ranhill Utilities to 53.19% from 21.77%, obliging it to extend the mandatory takeover offer (MTO) to acquire all the remaining Ranhill Utilities shares it did not already own. YTL Power said it intended to maintain the listing status of Ranhill Utilities.

Analyst Reaction
On the while, the equity analysts have been positive with the move, seeing it as benefitting YTL Power.

In its report, MIDF Amanah Investment Bank Bhd (MIDF Research) noted that the entry of a “strong controlling shareholder” in YTL Power which operates in similar business segments as Ranhill Utilities was positive and allowed Ranhill Utilities to tap its expertise in the water sector given the former’s strong track record in operating Wessex Water Ltd in the UK.

“We believe Ranhill Utilities is a strategic fit for YTL Power as both are operating in similar businesses in water and power, albeit with differing scale and geographical presence,” the research house said.

It noted that Ranhill Utilities would give YTL Power access to exclusive Johor water operations allowing it to capitalise on prospects from the Johor-Singapore Special Economic Zone and potential demand from Johor’s data centre hubs.

Additionally, it said the synergistic expertise in water operations could drive further efficiency of Ranhill Utilities’ Johor water business.

It noted that the deal also gave YTL Power access to the Sabah electricity market whereby Ranhill Utilities controls the largest independent power producer (IPP) share, solidified further by a new 100 megawatts (MW) combined-cycle gas turbine due for commercial operation date in 2026.


In addition, Ranhill Utilities has been making headways into renewable energy (RE) with the commissioning of its large-scale solar (LSS4) plant in February 2024.

“Overall, we see this acquisition as a mid-to-long-term positive for YTL Power,” MIDF Research said, maintaining its ‘Buy’ call on the counter with a 52-week target price (TP) of RM6.35.

YTL Power has 10 ‘Buy’ and three ‘Hold’ calls on its counter, with no ‘Sell’ call among equity analysts tracked by Bloomberg, with a consensus TP of RM6.21.

YTL Power built on its origins as Malaysia’s first IPP with its two power stations in Paka, Terengganu, and Pasir Gudang, Johor, diversifying into the international utilities industry.

It then acquired Wessex Water, a water and sewerage operator in the UK in 2002 and YTL PowerSeraya Pte Ltd, which has a licensed generation capacity of 3,100MW and merchant multi-utilities businesses in Singapore, in 2009.



It also owns a 20% effective interest in PT Jawa Power, which owns a 1,220MW power station in Indonesia and a 45% stake in Attarat Power Co, the owner of a 554MW oil shale-fired power project in Jordan.

In another report, Hong Leong Investment Bank Bhd (HLIB Research) also said that it was “overall positive” on the acquisition which would allow YTL Power to strategically consolidate Ranhill Utilities’ operations (water and LSS) which complements the group’s exist- ing business portfolio and derive potential synergies.

It added that the deal would also enable YTL Power to foray into the water utility business in Johor and LSS, complementing its strategic growth venture into data centre through YTL Data Centre Holdings Pte Ltd and YesCom-AI Data Centre.

“Moreover, we expect potential synergistic benefits to integrate Ranhill Utilities into YTL Power’s diversified portfolio of businesses while also leveraging YTL Power’s UK Wessex Water expertise.


Ranhill Utilities has also recently achieved commercialisation of its 50MW LSS under LSS4 programme with 25 years power purchase agreement,” HLIB Research said.

It has a ‘Buy’ call with an unchanged TP of RM7.45.

RHB Investment Bank Bhd (RHB Research), which has a ‘Buy’ call with a TP of RM6.68, said it believed the stake increase in Ranhill Utilities was a strategic move for YTL Power to complement its portfolio while strengthening its footprint in Johor given its ambitious data centre

development. It said that while it expected muted near-term impact, it saw potential synergies in the longer run.

“We believe it could be a strategic fit for YTL Power given its experience in both water treatment and power generation. This will further strengthen its footprint in Johor, where the company is also developing data centres and solar parks.


As such, we expect synergies in the long run despite near-term earnings impact being rather insignificant given Ranhill Utilities is estimated to generate a net profit of RM47-RM55 million in financial year 2024 (FY24F) to FY26F,” HLIB Research said.

Moving forward, it believed that PowerSeraya’s earnings moderation would be largely anchored by Wessex Water’s earnings recovery.

Hamdan Making Exit
The move would see Hamdan cashing out from Ranhill Utilities. He started his career as a structural engineer at the engineering consulting firm of Rankine & Hill Pty Ltd in Perth, Western Australia, and subsequently at Ranhill Bersekutu Sdn Bhd (RBSB) in 1981.

After a sabbatical leave in 1985 to pursue his Master’s degree, Hamdan returned to Malaysia and was appointed as director of RBSB in 1988 and eventually became president/CEO of RBSB in 1995.

In November 2000, he became ED and president/CEO of Ranhill Bhd where he spearheaded the group’s expansion from an engineering and consulting-based firm to a full-fledged organisation that engineers, constructs, owns and operates facilities in diverse segments including the infrastructure, environment, power, and oil and gas segments. — TMR



YTL Green Data Center Park launches in Johor, the First Integrated Data Center Park Powered by Solar Energy in Malaysia
April 21, 2022


Follows acquisition of a hyperscale data center in Singapore, to support customers’ growing needs for data center services in the region.

Digital render of YTL DC: The above image is the artist’s impression of the development and cannot be regarded as representation of fact.




Singapore, 21 April 2022 – YTL Power International Berhad (“YTL Power”), through its subsidiary YTL Data Center Holdings Pte. Ltd. (“YTL DC”) today announced the development of a 500MW data center campus in Johor, the first data center park in Malaysia to be powered by solar energy.

Located 30km from Singapore in the Iskandar region of Johor, the YTL Green Data Center Park will offer diversity in power and connectivity on a large industrial site, of which 275 acres will be dedicated towards data center development. This provides excellent opportunities for customers seeking green data centers to meet their needs.

Works have started on the first 72MW data center, which is expected to be in service by Q1 2024 with more in the pipeline.

Dato’ Yeoh Seok Hong, Managing Director of YTL Power notes that, “With the development of the YTL Green Data Center Park, we are driving the expansion of our infrastructure platform to the digital age by combining our expertise in renewable energy, property development, telecommunications and data centers. This project will be the flagship of our integrated data center vision to serve our customers in the wider Singapore region, and a catalyst for our regional expansion in this space.”

Through this project, YTL will leverage on its long-standing expertise in building infrastructure, offering end-to-end solutions to clients and partners. Future plans for YTL DC include utilising the Group’s expertise in renewable energy, telecommunications and construction to develop new data center campuses across Southeast Asian countries like Thailand, Philippines, Indonesia and Vietnam.

Notably, the YTL Green DC Park will have dark fibre connectivity to Singapore, due to its close proximity with the country. This benefits companies with operations in Singapore looking to expand, complement and optimise their data center processes. Dark fibre connectivity will provide direct and ultra-low latency network connections to data centers in Singapore and other locations in Malaysia.

Last December, YTL DC announced its acquisition of Dodid Pte. Ltd. (“Dodid”), owner of a 12.5MW, Tier-III data center in Singapore spanning 42,000 sq ft.

In addition, works are underway to expand and upgrade the Group’s 5MW Data Center facility in Sentul, Kuala Lumpur to Tier-III standards, offering customers a strategically located site in the heart of Kuala Lumpur with close proximity to key internet exchange hubs.